Skip to content
BidTabulation.comDOT bid tabulations & unit-price intelligence
Menu

Pull & Splice BOX, F&I, 13" X 24" Cover Size (Item 0635 2 11): FDOT Unit Price History

168 contracts · Nov 1, 2025 to Oct 31, 2026 · unit of measure EA

Weighted average (12 mo)
$1,430.96/EA
Contracts (12 mo)
168
Total quantity (12 mo)
10,813 EA
Total amount (12 mo)
$15,472,962

Source: FDOT Historical Item Average Cost report, statewide, fdot.gov, report run Nov 23, 2026, retrieved Nov 24, 2026. Figures as published by FDOT.

Weighted average by period

PeriodDatesContractsWeighted avgTotal quantityTotal amount
20242024-01-01 – 2024-12-31219$1,631.4515,504$25,293,927
20252025-01-01 – 2025-12-31206$1,621.7615,309$24,827,474
Latest 12 months2025-11-01 – 2026-10-31168$1,430.9610,813$15,472,962

By FDOT market area (latest 12 months)

Market areaContractsWeighted avgvs. statewideTotal quantity
018$1,149.28-19.7%488
026$1,334.02-6.8%76
038$1,245.63-13%394
044$1,902.29+32.9%34
0515$1,475.74+3.1%541
0615$1,563.07+9.2%1,017
0716$1,211.31-15.3%1,027
0837$1,614.31+12.8%1,703
093$1,104.21-22.8%237
109$1,420.26-0.7%369
116$1,521.33+6.3%382
1221$1,454.96+1.7%2,074
1314$1,493.93+4.4%1,884
141$877.08-38.7%5

FDOT Historical Item Average Cost reports by market area, Nov 1, 2025 to Oct 31, 2026. FDOT defines its 14 market areas; see the report page on fdot.gov.

Summary

FDOT pay item 0635 2 11 (Pull & Splice BOX, F&I, 13" X 24" Cover Size) is measured in EA. In FDOT's Historical Item Average Cost report for Nov 1, 2025 to Oct 31, 2026, it appeared on 168 contracts with a quantity-weighted average of $1,430.96 per EA, on 10,813 EA worth $15,472,962 in total.

The same report run for earlier periods shows $1,631.45 in 2024 (219 contracts, 15,504 EA), $1,621.76 in 2025 (206 contracts, 15,309 EA), $1,430.96 in the latest 12 months (168 contracts, 10,813 EA). From 2024 to the latest 12 months the weighted average fell 12.3%.

Quantity let statewide shrank 30% over the same span, which can move a weighted average on its own because large contracts often carry lower unit prices.

FDOT's market-area reports for the same 12 months show how location moves the price. Among the 13 market areas with at least three contracts, market area 09 had the lowest weighted average ($1,104.21 per EA, 3 contracts) and market area 04 the highest ($1,902.29, 4 contracts), 1.7 times as much. Market area 08 let the most contracts with this item (37). 14 of FDOT's 14 market areas reported the item in this window.

FDOT weights its average on quantity at the contract level, so a single very large contract can pull the figure toward its price. The report does not publish quartiles or individual bids; FDOT's bid tabulation PDFs list every bidder's unit prices for a letting.

Other items in FDOT section 0635: 0635 2 12 Pull & Splice BOX, F&I, 24" X 36" Cover Size ($2,733.97 per EA, 77 contracts); 0635 2 14 Pull & Splice BOX, F&I, 17" X 30" Cover Size ($1,763.94 per EA, 40 contracts); 0635 2 13 Pull & Splice BOX, F&I, 30" X 60" Rectangular OR 36" Round Cover Size ($5,683.80 per EA, 39 contracts); 0635 3 13 Junction BOX, Furnish & Install, Embedded ($1,096.34 per EA, 23 contracts); 0635 2 30 Pull & Splice BOX, Install ($1,087.37 per EA, 19 contracts).

Related items in section 0635

Pricing an FDOT job? Upload your bid tab and compare every line with FDOT's published averages.

Benchmark a bid tab

How these figures are used: methodology. FDOT also posts a bid tabulation PDF for each letting.