Pull & Splice BOX, F&I, 24" X 36" Cover Size (Item 0635 2 12): FDOT Unit Price History
77 contracts · Nov 1, 2025 to Oct 31, 2026 · unit of measure EA
- Weighted average (12 mo)
- $2,733.97/EA
- Contracts (12 mo)
- 77
- Total quantity (12 mo)
- 1,065 EA
- Total amount (12 mo)
- $2,911,674
Source: FDOT Historical Item Average Cost report, statewide, fdot.gov, report run Nov 23, 2026, retrieved Nov 24, 2026. Figures as published by FDOT.
Weighted average by period
| Period | Dates | Contracts | Weighted avg | Total quantity | Total amount |
|---|---|---|---|---|---|
| 2024 | 2024-01-01 – 2024-12-31 | 103 | $3,031.45 | 1,355 | $4,107,614 |
| 2025 | 2025-01-01 – 2025-12-31 | 92 | $3,168.22 | 1,449 | $4,590,747 |
| Latest 12 months | 2025-11-01 – 2026-10-31 | 77 | $2,733.97 | 1,065 | $2,911,674 |
By FDOT market area (latest 12 months)
| Market area | Contracts | Weighted avg | vs. statewide | Total quantity |
|---|---|---|---|---|
| 01 | 3 | $2,439.47 | -10.8% | 38 |
| 03 | 3 | $3,143.10 | +15% | 46 |
| 05 | 5 | $2,699.64 | -1.3% | 55 |
| 06 | 5 | $3,130.80 | +14.5% | 102 |
| 07 | 6 | $2,835.48 | +3.7% | 144 |
| 08 | 19 | $2,604.25 | -4.7% | 233 |
| 10 | 7 | $2,907.80 | +6.4% | 37 |
| 11 | 2 | $3,269.76 | +19.6% | 19 |
| 12 | 15 | $2,780.47 | +1.7% | 235 |
| 13 | 11 | $2,627.49 | -3.9% | 69 |
FDOT Historical Item Average Cost reports by market area, Nov 1, 2025 to Oct 31, 2026. FDOT defines its 14 market areas; see the report page on fdot.gov.
Summary
FDOT pay item 0635 2 12 (Pull & Splice BOX, F&I, 24" X 36" Cover Size) is measured in EA. In FDOT's Historical Item Average Cost report for Nov 1, 2025 to Oct 31, 2026, it appeared on 77 contracts with a quantity-weighted average of $2,733.97 per EA, on 1,065 EA worth $2,911,674 in total.
The same report run for earlier periods shows $3,031.45 in 2024 (103 contracts, 1,355 EA), $3,168.22 in 2025 (92 contracts, 1,449 EA), $2,733.97 in the latest 12 months (77 contracts, 1,065 EA). From 2024 to the latest 12 months the weighted average fell 9.8%.
Quantity let statewide shrank 21% over the same span, which can move a weighted average on its own because large contracts often carry lower unit prices.
FDOT's market-area reports for the same 12 months show how location moves the price. Among the 9 market areas with at least three contracts, market area 01 had the lowest weighted average ($2,439.47 per EA, 3 contracts) and market area 03 the highest ($3,143.10, 3 contracts), 1.3 times as much. Market area 08 let the most contracts with this item (19). 10 of FDOT's 14 market areas reported the item in this window.
FDOT weights its average on quantity at the contract level, so a single very large contract can pull the figure toward its price. The report does not publish quartiles or individual bids; FDOT's bid tabulation PDFs list every bidder's unit prices for a letting.
Other items in FDOT section 0635: 0635 2 11 Pull & Splice BOX, F&I, 13" X 24" Cover Size ($1,430.96 per EA, 168 contracts); 0635 2 14 Pull & Splice BOX, F&I, 17" X 30" Cover Size ($1,763.94 per EA, 40 contracts); 0635 2 13 Pull & Splice BOX, F&I, 30" X 60" Rectangular OR 36" Round Cover Size ($5,683.80 per EA, 39 contracts); 0635 3 13 Junction BOX, Furnish & Install, Embedded ($1,096.34 per EA, 23 contracts); 0635 2 30 Pull & Splice BOX, Install ($1,087.37 per EA, 19 contracts).
Related items in section 0635
- 0635 2 11 · Pull & Splice BOX, F&I, 13" X 24" Cover Size ($1,430.96/EA)
- 0635 2 14 · Pull & Splice BOX, F&I, 17" X 30" Cover Size ($1,763.94/EA)
- 0635 2 13 · Pull & Splice BOX, F&I, 30" X 60" Rectangular OR 36" Round Cover Size ($5,683.80/EA)
- 0635 3 13 · Junction BOX, Furnish & Install, Embedded ($1,096.34/EA)
- 0635 2 30 · Pull & Splice BOX, Install ($1,087.37/EA)
- 0635 3 12 · Junction BOX, Furnish & Install, Mounted ($851.16/EA)
- 0635 4 11 · Fiber Optic Splice Vault, Furnish & Install, 54"W X 54"L X 48"D ($12,556.27/EA)
- 0635 2 15 · Pull & Splice BOX, F&I, 30" X 48" Cover Size ($3,440.00/EA)
Pricing an FDOT job? Upload your bid tab and compare every line with FDOT's published averages.
Benchmark a bid tabHow these figures are used: methodology. FDOT also posts a bid tabulation PDF for each letting.