Guardrail Transition Connection TO Rigid Barrier, F&I- Index 536-001, Approach TL-2 (Item 0536 8111): FDOT Unit Price History
10 contracts · Nov 1, 2025 to Oct 31, 2026 · unit of measure EA
- Weighted average (12 mo)
- $3,030.80/EA
- Contracts (12 mo)
- 10
- Total quantity (12 mo)
- 22 EA
- Total amount (12 mo)
- $66,678
Source: FDOT Historical Item Average Cost report, statewide, fdot.gov, report run Nov 23, 2026, retrieved Nov 24, 2026. Figures as published by FDOT.
Weighted average by period
| Period | Dates | Contracts | Weighted avg | Total quantity | Total amount |
|---|---|---|---|---|---|
| 2024 | 2024-01-01 – 2024-12-31 | 13 | $3,098.33 | 31 | $96,048 |
| 2025 | 2025-01-01 – 2025-12-31 | 5 | $2,833.17 | 12 | $33,998 |
| Latest 12 months | 2025-11-01 – 2026-10-31 | 10 | $3,030.80 | 22 | $66,678 |
By FDOT market area (latest 12 months)
| Market area | Contracts | Weighted avg | vs. statewide | Total quantity |
|---|---|---|---|---|
| 01 | 2 | $3,733.33 | +23.2% | 6 |
| 02 | 1 | $2,400.00 | -20.8% | 4 |
| 03 | 1 | $4,176.06 | +37.8% | 2 |
| 04 | 1 | $2,830.00 | -6.6% | 1 |
| 07 | 1 | $2,185.00 | -27.9% | 2 |
| 10 | 1 | $2,600.00 | -14.2% | 2 |
| 12 | 1 | $2,512.77 | -17.1% | 2 |
| 13 | 2 | $2,966.67 | -2.1% | 3 |
FDOT Historical Item Average Cost reports by market area, Nov 1, 2025 to Oct 31, 2026. FDOT defines its 14 market areas; see the report page on fdot.gov.
Summary
FDOT pay item 0536 8111 (Guardrail Transition Connection TO Rigid Barrier, F&I- Index 536-001, Approach TL-2) is measured in EA. In FDOT's Historical Item Average Cost report for Nov 1, 2025 to Oct 31, 2026, it appeared on 10 contracts with a quantity-weighted average of $3,030.80 per EA, on 22 EA worth $66,678 in total.
The same report run for earlier periods shows $3,098.33 in 2024 (13 contracts, 31 EA), $2,833.17 in 2025 (5 contracts, 12 EA), $3,030.80 in the latest 12 months (10 contracts, 22 EA). Across those periods the weighted average stayed within three percent.
Quantity let statewide shrank 29% over the same span, which can move a weighted average on its own because large contracts often carry lower unit prices.
In the same 12 months, 8 of FDOT's 14 market areas reported this item: area 01 at $3,733.33 (2 contracts), area 02 at $2,400.00 (1 contract), area 03 at $4,176.06 (1 contract), area 04 at $2,830.00 (1 contract), area 07 at $2,185.00 (1 contract), area 10 at $2,600.00 (1 contract), area 12 at $2,512.77 (1 contract), area 13 at $2,966.67 (2 contracts).
FDOT weights its average on quantity at the contract level, so a single very large contract can pull the figure toward its price. The report does not publish quartiles or individual bids; FDOT's bid tabulation PDFs list every bidder's unit prices for a letting.
Other items in FDOT section 0536: 0536 73 Guardrail Removal ($1.23 per LF, 84 contracts); 0536 1 1 Guardrail -Roadway, General TL-3 ($24.61 per LF, 76 contracts); 0536 85 24 Guardrail END Treatment- Parallel Approach Terminal ($3,264.12 per EA, 76 contracts); 0536 85 20 Guardrail END Treatment- Trailing Anchorage ($1,643.44 per EA, 55 contracts); 0536 8122 Guardrail Transition Connection TO Rigid Barrier, F&I- Index 536-002, Approach TL-3 ($3,461.91 per EA, 26 contracts).
Related items in section 0536
- 0536 73 · Guardrail Removal ($1.23/LF)
- 0536 1 1 · Guardrail -Roadway, General TL-3 ($24.61/LF)
- 0536 85 24 · Guardrail END Treatment- Parallel Approach Terminal ($3,264.12/EA)
- 0536 85 20 · Guardrail END Treatment- Trailing Anchorage ($1,643.44/EA)
- 0536 8122 · Guardrail Transition Connection TO Rigid Barrier, F&I- Index 536-002, Approach TL-3 ($3,461.91/EA)
- 0536 8112 · Guardrail Transition Connection TO Rigid Barrier, F&I- Index 536-001, Approach TL-3 ($3,224.76/EA)
- 0536 8113 · Guardrail Transition Connection TO Rigid Barrier, F&I- Index 536-001, Trailing ($1,546.11/EA)
- 0536 1 0 · Guardrail -Roadway, General/LOW Speed TL-2 ($20.79/LF)
Pricing an FDOT job? Upload your bid tab and compare every line with FDOT's published averages.
Benchmark a bid tabHow these figures are used: methodology. FDOT also posts a bid tabulation PDF for each letting.