Skip to content
BidTabulation.comDOT bid tabulations & unit-price intelligence
Menu

Pavement Sler 24" (Item 666-7352): TxDOT Unit Price History

1,512 bids · 281 bid lines · Nov 6, 2024 to Nov 4, 2026 · unit of measure LF

TxDOT 666-7352 · PAVEMENT SLER 24" · Unit: LF

Low bid
$1.26/LF
Quantity-weighted median of winning unit prices
Weighted median
$1.65/LF
Quantity-weighted median of every bid
Engineer’s estimate
$2.00/LF
Quantity-weighted median of TxDOT’s estimate per line
12-mo trend
-17.16%
Median unit price, last 12 months vs the 12 before
Price vs. quantity
$2.50$5.00$7.50$10.00$12.50101001K10K100KQuantity (LF), log scaleUnit price ($/LF)
Winning (low) bid Other bid Fitted price curve (ln price = 1.90 − 0.176·ln qty, R² 0.12)320 plotted bids, 6 above the chart range

Source: TxDOT bid tabulation dataset, data.texas.gov de7b-7dna, lettings Nov 6, 2024–Nov 4, 2026, retrieved Nov 24, 2026. Weighted figures are quantity-weighted; see how we compute them.

Export bid rows (CSV)

Summary

TxDOT pay item 666-7352 (Pavement Sler 24") is measured in LF. Between Nov 6, 2024 and Nov 4, 2026, contractors entered 1,512 bids for it on 281 published bid lines in TxDOT lettings. Over the last 12 months, the quantity-weighted median of all 803 bids was $1.65 per LF, and the winning low bidders priced it at a weighted median of $1.26 per LF.

TxDOT's engineer's estimate for the same lines had a weighted median of $2.00 per LF, so winning bids came in 37.0% below the estimate.

By calendar year, the median bid moved from $2.60 in 2025 (701 bids) to $2.20 in 2026 (767 bids), down 15.4%. The middle half of 2026 bids fell between $1.20 and $3.14.

Comparing the last 12 months with the 12 months before, the median unit price fell 17.16%.

Quantity matters for this item. Lines of 10 to 340 LF had a weighted median of $2.50, while lines above 1,668 LF had $1.65, a 34% lower price for large quantities. TxDOT itself warns that high-quantity items are often discounted, so compare your quantity band rather than the overall average.

Across 277 lines where both a winning and a second-place bid were published, the median winning unit price was $2.40 against $2.50 from the second-lowest bidder, a median gap of 3.09% on this line. Because the low bidder is decided on the whole proposal, the low bidder is not always the cheapest on every line.

Prices differ by district. Among the 19 TxDOT districts with at least ten bids, Houston had the lowest weighted median ($0.850) and Amarillo the highest ($7.70). The busiest district for this item was Dallas.

The most recent letting with this item was on Nov 4, 2026 in Collin County, where Mario Sinacola & Sons Excavating, Inc. was the low bidder at $1.20 per LF for 3,785 LF against an estimate of $1.60.

1 bids outside a log-scale outlier fence (mostly token bids of a few cents or a dollar, typical of unbalanced bidding) are left out of these statistics but remain in the CSV export.

Related items: 666-7024 Refl PAV MRK TY I (W)8"(SLD)(100MIL) (weighted median $0.850 per LF); 666-7423 Refl PAV MRK TY I (Y)6"(SLD)(100MIL) (weighted median $0.450 per LF); 666-7036 Refl PAV MRK TY I (W)24"(SLD)(100MIL) (weighted median $7.00 per LF); 666-7411 Refl PAV MRK TY I (W)6"(SLD)(100MIL) (weighted median $0.450 per LF).

Unit price by year

YearBidsBid linesWeighted avgWeighted medianMedian25th pct75th pct
20244410$2.63$2.00$2.89$2.00$4.00
2025701135$2.66$2.00$2.60$1.50$5.00
2026767136$1.99$1.55$2.20$1.20$3.14

Quantity bands

BandQuantity (LF)BidsWeighted avgWeighted median25th–75th pct
Small10–340517$3.90$2.50$1.80–$5.00
Medium341–1,647495$3.40$2.50$1.35–$4.00
Large1,668–37,051500$2.11$1.65$1.10–$3.00

Bands split bids into thirds by quantity. TxDOT notes that high-quantity items are often discounted, which pulls overall averages down.

Winning bid vs. second-low vs. engineer’s estimate

Median winning unit price
$2.40
Median second-low unit price
$2.50
Median engineer’s estimate
$2.50
Median gap, second vs. low
+3.09%

277 published lines with both a rank-1 and a rank-2 bid.

Contractor head-to-head · Money left on the table

Proposal 0047-04-032 · let Nov 4, 2026 · Collin County, Dallas District

Line quantity 3,785 LF · Engineer’s estimate $1.60/LF

  • Unit price
    $1.20/LF
    Extension
    $4,542.00
    Proposal total
    $35,766,135
    Money left on the table
    $890,797 (2.49%)
    vs. engineer’s estimate
    -25%
  • Unit price
    $2.10/LF
    Extension
    $7,948.50
    Proposal total
    $36,656,931
    vs. low bid
    +$890,797
    vs. engineer’s estimate
    +31.3%
  • 3. Tiseo Paving Company, LLC

    Unit price
    $2.10/LF
    Extension
    $7,948.50
    Proposal total
    $38,169,956
    vs. low bid
    +$2,403,821
    vs. engineer’s estimate
    +31.3%
  • 4. Harper Brothers Construction LLC

    Unit price
    $0.72/LF
    Extension
    $2,725.20
    Proposal total
    $40,441,503
    vs. low bid
    +$4,675,368
    vs. engineer’s estimate
    -55%

Proposal 0195-02-092 · let Nov 4, 2026 · Denton County, Dallas District

Line quantity 1,816 LF · Engineer’s estimate $1.00/LF

  • 1. Indus Road & Bridge, Inc.

    LOW BID · WINNER
    Unit price
    $1.60/LF
    Extension
    $2,905.60
    Proposal total
    $138,145,038
    Money left on the table
    $5,131,824 (3.71%)
    vs. engineer’s estimate
    +60%
  • 2. Rpm Xconstruction, LLC

    Unit price
    $1.45/LF
    Extension
    $2,633.20
    Proposal total
    $143,276,861
    vs. low bid
    +$5,131,824
    vs. engineer’s estimate
    +45%
  • Unit price
    $1.89/LF
    Extension
    $3,432.24
    Proposal total
    $152,579,077
    vs. low bid
    +$14,434,039
    vs. engineer’s estimate
    +89%
  • Unit price
    $1.40/LF
    Extension
    $2,542.40
    Proposal total
    $153,499,152
    vs. low bid
    +$15,354,114
    vs. engineer’s estimate
    +40%
  • 5. Sema Construction, Inc.

    Unit price
    $1.40/LF
    Extension
    $2,542.40
    Proposal total
    $154,136,028
    vs. low bid
    +$15,990,990
    vs. engineer’s estimate
    +40%
  • 6. Zachry Construction Corporation

    Unit price
    $1.45/LF
    Extension
    $2,633.20
    Proposal total
    $154,873,429
    vs. low bid
    +$16,728,392
    vs. engineer’s estimate
    +45%

Proposal 3330-01-011 · let Nov 3, 2026 · McLennan County, Waco District

Line quantity 108 LF · Engineer’s estimate $2.00/LF

  • 1. The Levy Company, LLC

    LOW BID · WINNER
    Unit price
    $3.79/LF
    Extension
    $409.32
    Proposal total
    $291,481
    Money left on the table
    $21,727 (7.45%)
    vs. engineer’s estimate
    +89.5%
  • Unit price
    $2.00/LF
    Extension
    $216.00
    Proposal total
    $313,208
    vs. low bid
    +$21,727
    vs. engineer’s estimate
    0%
  • 3. Road Solutions L.L.C.

    Unit price
    $2.24/LF
    Extension
    $241.92
    Proposal total
    $334,098
    vs. low bid
    +$42,617
    vs. engineer’s estimate
    +12%
  • Unit price
    $4.24/LF
    Extension
    $457.92
    Proposal total
    $346,574
    vs. low bid
    +$55,093
    vs. engineer’s estimate
    +112%
  • Unit price
    $2.00/LF
    Extension
    $216.00
    Proposal total
    $359,709
    vs. low bid
    +$68,228
    vs. engineer’s estimate
    0%
  • Unit price
    $3.50/LF
    Extension
    $378.00
    Proposal total
    $361,949
    vs. low bid
    +$70,468
    vs. engineer’s estimate
    +75%
  • Unit price
    $2.11/LF
    Extension
    $227.88
    Proposal total
    $367,326
    vs. low bid
    +$75,845
    vs. engineer’s estimate
    +5.5%
  • Unit price
    $3.85/LF
    Extension
    $415.80
    Proposal total
    $383,000
    vs. low bid
    +$91,519
    vs. engineer’s estimate
    +92.5%
  • Unit price
    $3.67/LF
    Extension
    $396.36
    Proposal total
    $390,649
    vs. low bid
    +$99,168
    vs. engineer’s estimate
    +83.5%

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

Last 10 lettings with this item

Let dateCSJCountyDistrictQtyBiddersLow bidderLow unit priceEstimate
2026-11-040047-04-032CollinDallas3,7854Mario Sinacola & Sons Excavating, Inc.$1.20$1.60
2026-11-040195-02-092DentonDallas1,8166Indus Road & Bridge, Inc.$1.60$1.00
2026-11-033330-01-011McLennanWaco1089The Levy Company, LLC$3.79$2.00
2026-10-070143-03-049WilsonSan Antonio1,9808Hunter Industries, Ltd.$3.00$2.75
2026-10-070907-00-217Tom GreenSan Angelo9667Flat Line, Inc.$2.00$2.41
2026-10-066496-83-001GreggTyler2252Striping Technology, L.P.$3.00$1.40
2026-09-086500-36-001WallerHouston4,3601Trp Infrastructure Services, LLC$1.50$0.700
2026-09-030051-09-127GalvestonHouston2,3677Castillo Aranda LLC$3.00$5.00
2026-09-030918-00-440DallasDallas1,0008American Lighting and Signalization, LLC$1.25$3.00
2026-09-031414-01-025GalvestonHouston9,9986Mc2 Civil, LLC$1.05$1.60

By district

DistrictBidsLow bid (w. median)Weighted medianEstimate12-mo trend
Abilene19$4.65$4.65$4.28—
Amarillo15$8.05$7.70$1.00—
Atlanta21$3.50$3.50$1.15—
Austin65$2.00$2.40$3.70-29.79%
Beaumont41$0.400$1.00$0.400—
Brownwood4$6.50$7.33$1.50—
Bryan41$3.00$2.00$0.500—
Childress3$5.50$5.50$3.80—
Corpus Christi17$0.970$1.00$4.00—
Dallas343$0.980$1.60$2.00-8.88%
El Paso3$4.75$5.00$3.00—
Fort Worth128$0.750$1.05$2.10-37.5%
Houston89$1.05$0.850$0.600-21.57%
Laredo62$2.60$2.00$2.00-29.39%
Lubbock5$7.10$7.10$2.00—
Odessa11$4.30$3.84$1.75—
Paris45$1.50$2.50$3.48-28.57%
Pharr60$2.00$2.00$3.800%
San Angelo36$1.38$3.85$2.00+114.82%
San Antonio305$2.50$2.60$2.50-23.08%
Tyler76$2.00$2.80$3.00-4.93%
Waco100$1.25$1.35$1.48-33.33%
Wichita Falls23$1.00$1.38$2.00—

Related items

Is your price for item 666-7352 in line? Benchmark your whole bid tab against TxDOT bid history.

Benchmark a bid tab

Official source: TxDOT bid tabulations open dataset (data.texas.gov, de7b-7dna) · Bid Items and Index (txdot.gov). Data as published by TxDOT; figures computed by Bid Tabulation.