Skip to content
BidTabulation.comDOT bid tabulations & unit-price intelligence
Menu

Wg Engineering & Construction, LLC: TxDOT Bid Results and Margins

Name as published by TxDOT: WG ENGINEERING & CONSTRUCTION, LLC · Data as published by TxDOT, lettings Nov 6, 2024 to Nov 3, 2026, retrieved Nov 24, 2026.

Proposals bid
72
Low bids (rank 1)
10
Win rate
13.89%
Low-bid value
$25.6M
Money left on table
$1.4M
Avg. bid vs. estimate
+4.66%

From Nov 6, 2024 to Nov 3, 2026, Wg Engineering & Construction, LLC submitted 72 bids on TxDOT proposals and was the apparent low bidder on 10 of them (13.89%), with low bids totalling $25,645,241. In 9 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $1,366,754 (5.88% of those bids); the median gap was 8%. On average its bids came in 4.66% above TxDOT's engineer's estimate. Its most frequent district was Dallas (27 bids).

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

By year

YearBidsLow bidsWin rateLow-bid value
2024400.0%$0
202541819.5%$20,271,421
20262727.4%$5,373,819

Head-to-head rivals

BidderProposals togetherRanked ahead
Highway Intelligent Traffic Solutions, LLC268 of 26
Yunex LLC249 of 24
Select Maintenance, L.L.C.2115 of 21
Vaca Underground Utilities Inc213 of 21
Florida Traffic Control Devices, Inc.2011 of 20
Durable Specialties, Inc.1911 of 19
Grey Sky Construction LLC1715 of 17
Elecnor Belco Electric, Inc.137 of 13

Districts and work types

DistrictBids
Dallas27
Fort Worth8
Waco6
Abilene4
Brownwood4
Work type of low bidsLow bids
Safety Improvement Projects7
Routine Maintenance Project2
Routine Maintenance Project - Sealed1

Closest second-place finishes

Let dateProposalCountyLow bidderLow bidThis bidvs. low bid
2025-05-010887-01-041MidlandWillis Electric Co., LP$520,378$542,074+4.2%
2025-03-050135-02-071CollinSice, Inc.$2,885,948$3,100,676+7.4%
2025-05-020581-01-182DallasSelect Maintenance, L.L.C.$3,099,433$3,394,629+9.5%
2025-04-046478-33-001McLennanE-Z Bel Construction, LLC$1,538,098$1,799,782+17%
2026-02-116494-19-001TaylorVaca Underground Utilities Inc$881,525$1,032,724+17.2%

Recent bids

Let dateProposalCountyWork typeRankBid totalvs. low bidvs. estimate
2026-11-030619-03-068CollinTraffic Control Devices6 of 13$1,677,993+9.8%-3.3%
2026-11-030919-00-108CassSafety Improvement Projects9 of 10$1,124,415+28.2%+18.7%
2026-11-033330-01-011McLennanIntersection & Operational Imprv4 of 9$346,574+18.9%+13.7%
2026-11-036484-51-001WilliamsonRoutine Maintenance Project - Sealed6 of 7$1,396,493+45%+20.3%
2026-10-156503-97-001McLennanRoutine Maintenance Project3 of 7$324,780+17.2%-5.4%
2026-10-070196-03-288DallasPedestrian, Sidewalks & Curb Ramps5 of 9$1,230,042+4.5%-3.4%
2026-09-156499-29-001EastlandRoutine Maintenance Project3 of 7$188,431+9.4%-2.5%
2026-09-030918-00-440DallasTraffic Control Devices4 of 8$4,294,591+2.5%-3.5%
2026-09-020181-01-071TaylorSafety Improvement Projects3 of 5$288,804+3%-6.2%
2026-08-060581-01-177DallasSafety Improvement Projects8 of 10$2,925,224+36.8%-5.6%
2026-08-060902-00-323TarrantTraffic Control Devices7 of 9$1,437,585+36.3%+3.5%
2026-08-050249-08-046Palo PintoSafety Improvement Projects6 of 10$239,909+32.6%-5.5%

Report an error. Wrong company merged, a name change, or a figure that does not match TxDOT's file? Email bidtabulation@apps.adeptaoperations.com. We respond within five business days. See how corrections work.

Compare your own unit prices with TxDOT history: benchmark a bid tab.