Condt (PVC) (SCH 80) (2") (Item 618-7054): TxDOT Unit Price History
1,169 bids · 204 bid lines · Nov 6, 2024 to Nov 12, 2026 · unit of measure LF
TxDOT 618-7054 · CONDT (PVC) (SCH 80) (2") · Unit: LF
- Low bid
- $10.00/LF
- Quantity-weighted median of winning unit prices
- Weighted median
- $10.30/LF
- Quantity-weighted median of every bid
- Engineer’s estimate
- $14.80/LF
- Quantity-weighted median of TxDOT’s estimate per line
- 12-mo trend
- -19.6%
- Median unit price, last 12 months vs the 12 before
Source: TxDOT bid tabulation dataset, data.texas.gov de7b-7dna, lettings Nov 6, 2024–Nov 12, 2026, retrieved Nov 24, 2026. Weighted figures are quantity-weighted; see how we compute them.
Export bid rows (CSV)Summary
TxDOT pay item 618-7054 (Condt (PVC) (SCH 80) (2")) is measured in LF. Between Nov 6, 2024 and Nov 12, 2026, contractors entered 1,169 bids for it on 204 published bid lines in TxDOT lettings. Over the last 12 months, the quantity-weighted median of all 699 bids was $10.30 per LF, and the winning low bidders priced it at a weighted median of $10.00 per LF.
TxDOT's engineer's estimate for the same lines had a weighted median of $14.80 per LF, so winning bids came in 32.4% below the estimate.
By calendar year, the median bid moved from $20.00 in 2025 (479 bids) to $16.00 in 2026 (654 bids), down 20.0%. The middle half of 2026 bids fell between $12.00 and $21.00.
Comparing the last 12 months with the 12 months before, the median unit price fell 19.6%.
Quantity matters for this item. Lines of 10 to 255 LF had a weighted median of $20.00, while lines above 1,460 LF had $10.47, a 48% lower price for large quantities. TxDOT itself warns that high-quantity items are often discounted, so compare your quantity band rather than the overall average.
Across 203 lines where both a winning and a second-place bid were published, the median winning unit price was $17.40 against $18.20 from the second-lowest bidder, a median gap of 1.01% on this line. Because the low bidder is decided on the whole proposal, the low bidder is not always the cheapest on every line.
Prices differ by district. Among the 20 TxDOT districts with at least ten bids, Houston had the lowest weighted median ($8.95) and Dallas the highest ($20.60). The busiest district for this item was Dallas.
The most recent letting with this item was on Nov 12, 2026 in Dallas County, where Highway Intelligent Traffic Solutions, LLC was the low bidder at $33.77 per LF for 20 LF against an estimate of $20.00.
1 bids outside a log-scale outlier fence (mostly token bids of a few cents or a dollar, typical of unbalanced bidding) are left out of these statistics but remain in the CSV export.
Related items: 618-7030 Condt (PVC) (SCH 40) (2") (weighted median $12.10 per LF); 618-7055 Condt (PVC) (SCH 80) (2") (Bore) (weighted median $21.00 per LF); 620-7009 Elec Condr (NO.6) Bare (weighted median $2.22 per LF); 620-7010 Elec Condr (NO.6) Insulated (weighted median $2.52 per LF).
Unit price by year
| Year | Bids | Bid lines | Weighted avg | Weighted median | Median | 25th pct | 75th pct |
|---|---|---|---|---|---|---|---|
| 2024 | 36 | 6 | $20.30 | $20.00 | $20.00 | $13.81 | $26.35 |
| 2025 | 479 | 93 | $15.21 | $12.90 | $20.00 | $15.00 | $26.00 |
| 2026 | 654 | 105 | $11.59 | $10.25 | $16.00 | $12.00 | $21.00 |
Quantity bands
| Band | Quantity (LF) | Bids | Weighted avg | Weighted median | 25th–75th pct |
|---|---|---|---|---|---|
| Small | 10–255 | 391 | $22.89 | $20.00 | $16.00–$28.00 |
| Medium | 265–1,446 | 388 | $21.25 | $19.80 | $14.00–$25.00 |
| Large | 1,460–50,797 | 390 | $11.99 | $10.47 | $10.14–$17.72 |
Bands split bids into thirds by quantity. TxDOT notes that high-quantity items are often discounted, which pulls overall averages down.
Winning bid vs. second-low vs. engineer’s estimate
- Median winning unit price
- $17.40
- Median second-low unit price
- $18.20
- Median engineer’s estimate
- $20.00
- Median gap, second vs. low
- +1.01%
203 published lines with both a rank-1 and a rank-2 bid.
Contractor head-to-head · Money left on the table
Proposal 6504-57-001 · let Nov 12, 2026 · Dallas County, Dallas District
Line quantity 20 LF · Engineer’s estimate $20.00/LF
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Highway Intelligent Traffic Solutions, LLCLOW BID | $33.77/LF | $675.40 | — | +68.9% | $792,536 | $105,738 (13.34%) left on table |
| 2 | Elecnor Belco Electric, Inc. | $35.00/LF | $700.00 | +$24.60 | +75% | $898,274 | +$105,738 |
| 3 | American Lighting and Signalization, LLC | $25.00/LF | $500.00 | -$175.40 | +25% | $900,000 | +$107,464 |
| 4 | Road Solutions L.L.C. | $17.15/LF | $343.00 | -$332.40 | -14.3% | $940,478 | +$147,942 |
| 5 | Yunex LLC | $30.00/LF | $600.00 | -$75.40 | +50% | $1,358,810 | +$566,274 |
1. Highway Intelligent Traffic Solutions, LLC
LOW BID · WINNER- Unit price
- $33.77/LF
- Extension
- $675.40
- Proposal total
- $792,536
- Money left on the table
- $105,738 (13.34%)
- vs. engineer’s estimate
- +68.9%
- Unit price
- $35.00/LF
- Extension
- $700.00
- Proposal total
- $898,274
- vs. low bid
- +$105,738
- vs. engineer’s estimate
- +75%
- Unit price
- $25.00/LF
- Extension
- $500.00
- Proposal total
- $900,000
- vs. low bid
- +$107,464
- vs. engineer’s estimate
- +25%
4. Road Solutions L.L.C.
- Unit price
- $17.15/LF
- Extension
- $343.00
- Proposal total
- $940,478
- vs. low bid
- +$147,942
- vs. engineer’s estimate
- -14.3%
5. Yunex LLC
- Unit price
- $30.00/LF
- Extension
- $600.00
- Proposal total
- $1,358,810
- vs. low bid
- +$566,274
- vs. engineer’s estimate
- +50%
Proposal 0047-04-032 · let Nov 4, 2026 · Collin County, Dallas District
Line quantity 225 LF · Engineer’s estimate $21.00/LF
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Mario Sinacola & Sons Excavating, Inc.LOW BID | $13.00/LF | $2,925.00 | — | -38.1% | $35,766,135 | $890,797 (2.49%) left on table |
| 2 | Ed Bell Construction Company | $27.57/LF | $6,203.25 | +$3,278 | +31.3% | $36,656,931 | +$890,797 |
| 3 | Tiseo Paving Company, LLC | $27.25/LF | $6,131.25 | +$3,206 | +29.8% | $38,169,956 | +$2,403,821 |
| 4 | Harper Brothers Construction LLC | $27.50/LF | $6,187.50 | +$3,263 | +31% | $40,441,503 | +$4,675,368 |
1. Mario Sinacola & Sons Excavating, Inc.
LOW BID · WINNER- Unit price
- $13.00/LF
- Extension
- $2,925.00
- Proposal total
- $35,766,135
- Money left on the table
- $890,797 (2.49%)
- vs. engineer’s estimate
- -38.1%
- Unit price
- $27.57/LF
- Extension
- $6,203.25
- Proposal total
- $36,656,931
- vs. low bid
- +$890,797
- vs. engineer’s estimate
- +31.3%
3. Tiseo Paving Company, LLC
- Unit price
- $27.25/LF
- Extension
- $6,131.25
- Proposal total
- $38,169,956
- vs. low bid
- +$2,403,821
- vs. engineer’s estimate
- +29.8%
4. Harper Brothers Construction LLC
- Unit price
- $27.50/LF
- Extension
- $6,187.50
- Proposal total
- $40,441,503
- vs. low bid
- +$4,675,368
- vs. engineer’s estimate
- +31%
Proposal 0195-02-092 · let Nov 4, 2026 · Denton County, Dallas District
Line quantity 90 LF · Engineer’s estimate $23.00/LF
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Indus Road & Bridge, Inc.LOW BID | $15.00/LF | $1,350.00 | — | -34.8% | $138,145,038 | $5,131,824 (3.71%) left on table |
| 2 | Rpm Xconstruction, LLC | $17.20/LF | $1,548.00 | +$198.00 | -25.2% | $143,276,861 | +$5,131,824 |
| 3 | Mario Sinacola & Sons Excavating, Inc. | $14.60/LF | $1,314.00 | -$36.00 | -36.5% | $152,579,077 | +$14,434,039 |
| 4 | Webber, LLC | $14.60/LF | $1,314.00 | -$36.00 | -36.5% | $153,499,152 | +$15,354,114 |
| 5 | Sema Construction, Inc. | $14.60/LF | $1,314.00 | -$36.00 | -36.5% | $154,136,028 | +$15,990,990 |
| 6 | Zachry Construction Corporation | $15.15/LF | $1,363.50 | +$13.50 | -34.1% | $154,873,429 | +$16,728,392 |
- LOW BID · WINNER
- Unit price
- $15.00/LF
- Extension
- $1,350.00
- Proposal total
- $138,145,038
- Money left on the table
- $5,131,824 (3.71%)
- vs. engineer’s estimate
- -34.8%
2. Rpm Xconstruction, LLC
- Unit price
- $17.20/LF
- Extension
- $1,548.00
- Proposal total
- $143,276,861
- vs. low bid
- +$5,131,824
- vs. engineer’s estimate
- -25.2%
- Unit price
- $14.60/LF
- Extension
- $1,314.00
- Proposal total
- $152,579,077
- vs. low bid
- +$14,434,039
- vs. engineer’s estimate
- -36.5%
4. Webber, LLC
- Unit price
- $14.60/LF
- Extension
- $1,314.00
- Proposal total
- $153,499,152
- vs. low bid
- +$15,354,114
- vs. engineer’s estimate
- -36.5%
5. Sema Construction, Inc.
- Unit price
- $14.60/LF
- Extension
- $1,314.00
- Proposal total
- $154,136,028
- vs. low bid
- +$15,990,990
- vs. engineer’s estimate
- -36.5%
6. Zachry Construction Corporation
- Unit price
- $15.15/LF
- Extension
- $1,363.50
- Proposal total
- $154,873,429
- vs. low bid
- +$16,728,392
- vs. engineer’s estimate
- -34.1%
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.
Last 10 lettings with this item
| Let date | CSJ | County | District | Qty | Bidders | Low bidder | Low unit price | Estimate |
|---|---|---|---|---|---|---|---|---|
| 2026-11-12 | 6504-57-001 | Dallas | Dallas | 20 | 5 | Highway Intelligent Traffic Solutions, LLC | $33.77 | $20.00 |
| 2026-11-04 | 0047-04-032 | Collin | Dallas | 225 | 4 | Mario Sinacola & Sons Excavating, Inc. | $13.00 | $21.00 |
| 2026-11-04 | 0195-02-092 | Denton | Dallas | 90 | 6 | Indus Road & Bridge, Inc. | $15.00 | $23.00 |
| 2026-11-04 | 0212-03-058 | Brazos | Bryan | 305 | 12 | Fluor Enterprises, Inc. | $12.00 | $17.00 |
| 2026-11-03 | 0168-09-191 | Randall | Amarillo | 2,155 | 8 | Coppell Construction Co., Inc. | $20.00 | $18.00 |
| 2026-11-03 | 0619-03-068 | Collin | Dallas | 90 | 13 | Rcr Telecon LLC | $10.00 | $16.00 |
| 2026-11-03 | 3330-01-011 | McLennan | Waco | 20 | 8 | The Levy Company, LLC | $28.35 | $15.00 |
| 2026-10-08 | 6506-29-001 | Angelina | Lufkin | 150 | 3 | Select Maintenance, L.L.C. | $19.00 | $20.00 |
| 2026-10-07 | 0092-02-145 | Dallas | Dallas | 3,015 | 6 | Sice, Inc. | $12.72 | $20.00 |
| 2026-10-07 | 0143-03-049 | Wilson | San Antonio | 375 | 8 | Hunter Industries, Ltd. | $11.00 | $8.95 |
By district
| District | Bids | Low bid (w. median) | Weighted median | Estimate | 12-mo trend |
|---|---|---|---|---|---|
| Abilene | 34 | $15.00 | $15.00 | $23.00 | +6.67% |
| Amarillo | 37 | $16.30 | $16.30 | $16.00 | — |
| Atlanta | 25 | $8.85 | $9.00 | $14.80 | — |
| Austin | 44 | $16.10 | $15.00 | $17.00 | -36% |
| Beaumont | 22 | $22.00 | $15.60 | $13.50 | +11.99% |
| Brownwood | 9 | $22.00 | $20.00 | $25.00 | — |
| Bryan | 25 | $12.00 | $13.85 | $14.00 | — |
| Childress | 3 | $30.00 | $30.00 | $21.39 | — |
| Corpus Christi | 10 | $14.00 | $14.63 | $13.00 | — |
| Dallas | 301 | $22.00 | $20.60 | $22.00 | -19.25% |
| Fort Worth | 32 | $12.00 | $15.85 | $28.00 | — |
| Houston | 237 | $6.15 | $8.95 | $8.00 | -17.24% |
| Laredo | 12 | $13.14 | $14.70 | $16.00 | — |
| Lubbock | 35 | $17.25 | $11.72 | $16.00 | — |
| Lufkin | 33 | $20.00 | $10.00 | $18.00 | -44.44% |
| Odessa | 46 | $10.00 | $13.78 | $16.00 | -34.68% |
| Paris | 13 | $16.50 | $15.65 | $42.70 | — |
| Pharr | 16 | $20.00 | $20.00 | $15.50 | — |
| San Angelo | 9 | $19.00 | $20.43 | $35.00 | — |
| San Antonio | 131 | $10.00 | $13.48 | $20.00 | -27.09% |
| Tyler | 34 | $13.20 | $10.00 | $20.00 | — |
| Waco | 23 | $13.00 | $19.50 | $25.00 | -2.5% |
| Yoakum | 38 | $13.75 | $10.70 | $14.50 | +21.88% |
Related items
- 618-7030 · Condt (PVC) (SCH 40) (2") ($12.10/LF)
- 618-7055 · Condt (PVC) (SCH 80) (2") (Bore) ($21.00/LF)
- 620-7009 · Elec Condr (NO.6) Bare ($2.22/LF)
- 620-7010 · Elec Condr (NO.6) Insulated ($2.52/LF)
- 620-7008 · Elec Condr (NO.8) Insulated ($2.05/LF)
- 620-7007 · Elec Condr (NO.8) Bare ($1.95/LF)
- 624-7008 · Ground BOX TY D (162922)W/Apron ($1,613.17/EA)
- 624-7002 · Ground BOX TY A (122311)W/Apron ($1,431.00/EA)
Is your price for item 618-7054 in line? Benchmark your whole bid tab against TxDOT bid history.
Benchmark a bid tabOfficial source: TxDOT bid tabulations open dataset (data.texas.gov, de7b-7dna) · Bid Items and Index (txdot.gov). Data as published by TxDOT; figures computed by Bid Tabulation.