Ground BOX TY A (122311)W/Apron (Item 624-7002): TxDOT Unit Price History
1,296 bids · 235 bid lines · Nov 6, 2024 to Nov 12, 2026 · unit of measure EA
TxDOT 624-7002 · GROUND BOX TY A (122311)W/APRON · Unit: EA
- Low bid
- $1,400.00/EA
- Quantity-weighted median of winning unit prices
- Weighted median
- $1,431.00/EA
- Quantity-weighted median of every bid
- Engineer’s estimate
- $1,500.00/EA
- Quantity-weighted median of TxDOT’s estimate per line
- 12-mo trend
- -4.8%
- Median unit price, last 12 months vs the 12 before
Source: TxDOT bid tabulation dataset, data.texas.gov de7b-7dna, lettings Nov 6, 2024–Nov 12, 2026, retrieved Nov 24, 2026. Weighted figures are quantity-weighted; see how we compute them.
Export bid rows (CSV)Summary
TxDOT pay item 624-7002 (Ground BOX TY A (122311)W/Apron) is measured in EA. Between Nov 6, 2024 and Nov 12, 2026, contractors entered 1,296 bids for it on 235 published bid lines in TxDOT lettings. Over the last 12 months, the quantity-weighted median of all 755 bids was $1,431.00 per EA, and the winning low bidders priced it at a weighted median of $1,400.00 per EA.
TxDOT's engineer's estimate for the same lines had a weighted median of $1,500.00 per EA, so winning bids came in 6.7% below the estimate.
By calendar year, the median bid moved from $1,500.00 in 2025 (567 bids) to $1,420.00 in 2026 (696 bids), down 5.3%. The middle half of 2026 bids fell between $1,198.85 and $1,750.00.
Comparing the last 12 months with the 12 months before, the median unit price fell 4.8%.
Quantity matters for this item. Lines of 1 to 4 EA had a weighted median of $1,600.00, while lines above 20 EA had $1,451.00, a 9% lower price for large quantities. TxDOT itself warns that high-quantity items are often discounted, so compare your quantity band rather than the overall average.
Across 228 lines where both a winning and a second-place bid were published, the median winning unit price was $1,414.11 against $1,484.00 from the second-lowest bidder, a median gap of 1.16% on this line. Because the low bidder is decided on the whole proposal, the low bidder is not always the cheapest on every line.
Prices differ by district. Among the 22 TxDOT districts with at least ten bids, Lubbock had the lowest weighted median ($1,125.26) and Childress the highest ($3,142.50). The busiest district for this item was Dallas.
The most recent letting with this item was on Nov 12, 2026 in Dallas County, where Highway Intelligent Traffic Solutions, LLC was the low bidder at $1,431.56 per EA for 5 EA against an estimate of $1,200.00.
1 bids outside a log-scale outlier fence (mostly token bids of a few cents or a dollar, typical of unbalanced bidding) are left out of these statistics but remain in the CSV export.
Related items: 624-7008 Ground BOX TY D (162922)W/Apron (weighted median $1,613.17 per EA); 620-7009 Elec Condr (NO.6) Bare (weighted median $2.22 per LF); 620-7010 Elec Condr (NO.6) Insulated (weighted median $2.52 per LF); 620-7008 Elec Condr (NO.8) Insulated (weighted median $2.05 per LF).
Unit price by year
| Year | Bids | Bid lines | Weighted avg | Weighted median | Median | 25th pct | 75th pct |
|---|---|---|---|---|---|---|---|
| 2024 | 33 | 7 | $1,727.34 | $1,600.00 | $1,600.00 | $1,200.00 | $2,450.00 |
| 2025 | 567 | 112 | $1,652.74 | $1,500.00 | $1,500.00 | $1,271.80 | $2,000.00 |
| 2026 | 696 | 116 | $1,462.89 | $1,431.00 | $1,420.00 | $1,198.85 | $1,750.00 |
Quantity bands
| Band | Quantity (EA) | Bids | Weighted avg | Weighted median | 25th–75th pct |
|---|---|---|---|---|---|
| Small | 1–4 | 442 | $1,768.62 | $1,600.00 | $1,263.75–$2,023.47 |
| Medium | 5–19 | 425 | $1,583.55 | $1,435.00 | $1,200.00–$1,900.00 |
| Large | 20–208 | 429 | $1,517.20 | $1,451.00 | $1,200.00–$1,630.00 |
Bands split bids into thirds by quantity. TxDOT notes that high-quantity items are often discounted, which pulls overall averages down.
Winning bid vs. second-low vs. engineer’s estimate
- Median winning unit price
- $1,414.11
- Median second-low unit price
- $1,484.00
- Median engineer’s estimate
- $1,500.00
- Median gap, second vs. low
- +1.16%
228 published lines with both a rank-1 and a rank-2 bid.
Contractor head-to-head · Money left on the table
Proposal 6504-57-001 · let Nov 12, 2026 · Dallas County, Dallas District
Line quantity 5 EA · Engineer’s estimate $1,200/EA
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Highway Intelligent Traffic Solutions, LLCLOW BID | $1,431.56/EA | $7,157.80 | — | +19.3% | $792,536 | $105,738 (13.34%) left on table |
| 2 | Elecnor Belco Electric, Inc. | $1,940.00/EA | $9,700.00 | +$2,542 | +61.7% | $898,274 | +$105,738 |
| 3 | American Lighting and Signalization, LLC | $1,800.00/EA | $9,000.00 | +$1,842 | +50% | $900,000 | +$107,464 |
| 4 | Road Solutions L.L.C. | $1,600.00/EA | $8,000.00 | +$842.20 | +33.3% | $940,478 | +$147,942 |
| 5 | Yunex LLC | $2,253.00/EA | $11,265.00 | +$4,107 | +87.8% | $1,358,810 | +$566,274 |
1. Highway Intelligent Traffic Solutions, LLC
LOW BID · WINNER- Unit price
- $1,431.56/EA
- Extension
- $7,157.80
- Proposal total
- $792,536
- Money left on the table
- $105,738 (13.34%)
- vs. engineer’s estimate
- +19.3%
- Unit price
- $1,940.00/EA
- Extension
- $9,700.00
- Proposal total
- $898,274
- vs. low bid
- +$105,738
- vs. engineer’s estimate
- +61.7%
- Unit price
- $1,800.00/EA
- Extension
- $9,000.00
- Proposal total
- $900,000
- vs. low bid
- +$107,464
- vs. engineer’s estimate
- +50%
4. Road Solutions L.L.C.
- Unit price
- $1,600.00/EA
- Extension
- $8,000.00
- Proposal total
- $940,478
- vs. low bid
- +$147,942
- vs. engineer’s estimate
- +33.3%
5. Yunex LLC
- Unit price
- $2,253.00/EA
- Extension
- $11,265.00
- Proposal total
- $1,358,810
- vs. low bid
- +$566,274
- vs. engineer’s estimate
- +87.8%
Proposal 0195-02-092 · let Nov 4, 2026 · Denton County, Dallas District
Line quantity 26 EA · Engineer’s estimate $415.00/EA
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | Indus Road & Bridge, Inc.LOW BID | $1,800.00/EA | $46,800.00 | — | +333.7% | $138,145,038 | $5,131,824 (3.71%) left on table |
| 2 | Rpm Xconstruction, LLC | $1,360.00/EA | $35,360.00 | -$11,440 | +227.7% | $143,276,861 | +$5,131,824 |
| 3 | Mario Sinacola & Sons Excavating, Inc. | $1,716.00/EA | $44,616.00 | -$2,184 | +313.5% | $152,579,077 | +$14,434,039 |
| 4 | Webber, LLC | $1,716.00/EA | $44,616.00 | -$2,184 | +313.5% | $153,499,152 | +$15,354,114 |
| 5 | Sema Construction, Inc. | $1,716.00/EA | $44,616.00 | -$2,184 | +313.5% | $154,136,028 | +$15,990,990 |
| 6 | Zachry Construction Corporation | $1,780.84/EA | $46,301.84 | -$498.16 | +329.1% | $154,873,429 | +$16,728,392 |
- LOW BID · WINNER
- Unit price
- $1,800.00/EA
- Extension
- $46,800.00
- Proposal total
- $138,145,038
- Money left on the table
- $5,131,824 (3.71%)
- vs. engineer’s estimate
- +333.7%
2. Rpm Xconstruction, LLC
- Unit price
- $1,360.00/EA
- Extension
- $35,360.00
- Proposal total
- $143,276,861
- vs. low bid
- +$5,131,824
- vs. engineer’s estimate
- +227.7%
- Unit price
- $1,716.00/EA
- Extension
- $44,616.00
- Proposal total
- $152,579,077
- vs. low bid
- +$14,434,039
- vs. engineer’s estimate
- +313.5%
4. Webber, LLC
- Unit price
- $1,716.00/EA
- Extension
- $44,616.00
- Proposal total
- $153,499,152
- vs. low bid
- +$15,354,114
- vs. engineer’s estimate
- +313.5%
5. Sema Construction, Inc.
- Unit price
- $1,716.00/EA
- Extension
- $44,616.00
- Proposal total
- $154,136,028
- vs. low bid
- +$15,990,990
- vs. engineer’s estimate
- +313.5%
6. Zachry Construction Corporation
- Unit price
- $1,780.84/EA
- Extension
- $46,301.84
- Proposal total
- $154,873,429
- vs. low bid
- +$16,728,392
- vs. engineer’s estimate
- +329.1%
Proposal 1052-02-098 · let Nov 4, 2026 · Nueces County, Corpus Christi District
Line quantity 1 EA · Engineer’s estimate $750.00/EA
| Rank | Contractor | Unit price | Qty × Unit Price = Extension | Line vs. low bid | Line vs. estimate | Proposal total | Proposal vs. low bid |
|---|---|---|---|---|---|---|---|
| 1 | J E Construction Services, LLCLOW BID | $1,103.00/EA | $1,103.00 | — | +47.1% | $3,833,265 | $3,958 (0.1%) left on table |
| 2 | Anderson Columbia Co., Inc. | $1,240.00/EA | $1,240.00 | +$137.00 | +65.3% | $3,837,222 | +$3,958 |
| 3 | Ck Newberry, LLC | $1,100.00/EA | $1,100.00 | -$3.00 | +46.7% | $4,616,801 | +$783,537 |
| 4 | Stx Civil | $1,528.17/EA | $1,528.17 | +$425.17 | +103.8% | $4,817,402 | +$984,137 |
| 5 | Texas Materials Group, Inc. | $1,300.00/EA | $1,300.00 | +$197.00 | +73.3% | $4,943,316 | +$1,110,051 |
1. J E Construction Services, LLC
LOW BID · WINNER- Unit price
- $1,103.00/EA
- Extension
- $1,103.00
- Proposal total
- $3,833,265
- Money left on the table
- $3,958 (0.1%)
- vs. engineer’s estimate
- +47.1%
- Unit price
- $1,240.00/EA
- Extension
- $1,240.00
- Proposal total
- $3,837,222
- vs. low bid
- +$3,958
- vs. engineer’s estimate
- +65.3%
- Unit price
- $1,100.00/EA
- Extension
- $1,100.00
- Proposal total
- $4,616,801
- vs. low bid
- +$783,537
- vs. engineer’s estimate
- +46.7%
4. Stx Civil
- Unit price
- $1,528.17/EA
- Extension
- $1,528.17
- Proposal total
- $4,817,402
- vs. low bid
- +$984,137
- vs. engineer’s estimate
- +103.8%
- Unit price
- $1,300.00/EA
- Extension
- $1,300.00
- Proposal total
- $4,943,316
- vs. low bid
- +$1,110,051
- vs. engineer’s estimate
- +73.3%
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.
Last 10 lettings with this item
| Let date | CSJ | County | District | Qty | Bidders | Low bidder | Low unit price | Estimate |
|---|---|---|---|---|---|---|---|---|
| 2026-11-12 | 6504-57-001 | Dallas | Dallas | 5 | 5 | Highway Intelligent Traffic Solutions, LLC | $1,431.56 | $1,200.00 |
| 2026-11-04 | 0195-02-092 | Denton | Dallas | 26 | 6 | Indus Road & Bridge, Inc. | $1,800.00 | $415.00 |
| 2026-11-04 | 1052-02-098 | Nueces | Corpus Christi | 1 | 5 | J E Construction Services, LLC | $1,103.00 | $750.00 |
| 2026-11-03 | 0015-13-432 | Travis | Austin | 208 | 6 | Austin Bridge & Road Services, LP | $1,511.89 | $1,554.00 |
| 2026-11-03 | 0168-09-191 | Randall | Amarillo | 14 | 8 | Coppell Construction Co., Inc. | $2,400.00 | $1,950.00 |
| 2026-11-03 | 0619-03-068 | Collin | Dallas | 23 | 13 | Rcr Telecon LLC | $978.00 | $1,400.00 |
| 2026-10-07 | 0196-03-288 | Dallas | Dallas | 2 | 9 | Garret Shields Infrastructure | $2,000.00 | $2,800.00 |
| 2026-10-07 | 0921-02-527 | Hidalgo | Pharr | 4 | 1 | Digg Commercial, LLC | $1,800.00 | $1,200.00 |
| 2026-10-06 | 0009-11-248 | Dallas | Dallas | 20 | 7 | Ragle Construction, Inc. | $1,241.00 | $1,170.00 |
| 2026-10-06 | 0095-03-100 | Kaufman | Dallas | 6 | 10 | Highway 19 Construction LLC | $1,550.00 | $1,200.00 |
By district
| District | Bids | Low bid (w. median) | Weighted median | Estimate | 12-mo trend |
|---|---|---|---|---|---|
| Abilene | 37 | $1,400.00 | $1,400.00 | $1,500.00 | — |
| Amarillo | 28 | $2,400.00 | $1,600.00 | $1,950.00 | — |
| Atlanta | 26 | $1,245.00 | $1,400.00 | $1,200.00 | — |
| Austin | 81 | $1,511.89 | $1,597.35 | $1,554.00 | +0.9% |
| Beaumont | 52 | $1,500.00 | $1,265.49 | $1,201.72 | — |
| Brownwood | 7 | $2,200.00 | $2,000.00 | $2,100.00 | — |
| Bryan | 11 | $1,150.16 | $1,517.50 | $1,526.32 | — |
| Childress | 13 | $3,025.00 | $3,142.50 | $1,385.00 | — |
| Corpus Christi | 37 | $1,103.00 | $1,189.63 | $750.00 | — |
| Dallas | 234 | $1,241.00 | $1,465.00 | $1,450.00 | -18.15% |
| El Paso | 31 | $1,200.00 | $1,637.67 | $1,700.00 | -2.07% |
| Fort Worth | 32 | $1,700.00 | $1,470.72 | $2,000.00 | — |
| Houston | 52 | $1,295.00 | $1,213.92 | $1,250.00 | — |
| Laredo | 27 | $1,500.00 | $1,600.00 | $1,300.00 | — |
| Lubbock | 49 | $900.00 | $1,125.26 | $2,200.00 | -29.06% |
| Lufkin | 18 | $1,300.00 | $1,300.00 | $1,500.00 | — |
| Odessa | 95 | $2,150.00 | $1,750.55 | $1,800.00 | -2.34% |
| Paris | 6 | $1,610.00 | $1,764.50 | $1,680.00 | — |
| Pharr | 109 | $1,093.20 | $1,200.00 | $1,000.00 | +7.22% |
| San Angelo | 8 | $1,000.00 | $1,400.00 | $2,500.00 | — |
| San Antonio | 128 | $1,478.00 | $1,400.00 | $1,442.00 | -6.67% |
| Tyler | 51 | $1,900.00 | $1,268.83 | $1,500.00 | — |
| Waco | 37 | $1,700.00 | $1,675.00 | $1,304.00 | +6.9% |
| Wichita Falls | 18 | $1,500.00 | $1,500.00 | $1,400.00 | — |
| Yoakum | 107 | $1,600.00 | $1,250.00 | $1,300.00 | -9.84% |
Related items
- 624-7008 · Ground BOX TY D (162922)W/Apron ($1,613.17/EA)
- 620-7009 · Elec Condr (NO.6) Bare ($2.22/LF)
- 620-7010 · Elec Condr (NO.6) Insulated ($2.52/LF)
- 620-7008 · Elec Condr (NO.8) Insulated ($2.05/LF)
- 620-7007 · Elec Condr (NO.8) Bare ($1.95/LF)
- 618-7030 · Condt (PVC) (SCH 40) (2") ($12.10/LF)
- 618-7055 · Condt (PVC) (SCH 80) (2") (Bore) ($21.00/LF)
- 618-7054 · Condt (PVC) (SCH 80) (2") ($10.30/LF)
Is your price for item 624-7002 in line? Benchmark your whole bid tab against TxDOT bid history.
Benchmark a bid tabOfficial source: TxDOT bid tabulations open dataset (data.texas.gov, de7b-7dna) · Bid Items and Index (txdot.gov). Data as published by TxDOT; figures computed by Bid Tabulation.