Prestressed Concrete Pole, Complete Pole Removal- Pedestal/Service Pole (Item 0641 2 60): FDOT Unit Price History
47 contracts · Nov 1, 2025 to Oct 31, 2026 · unit of measure EA
- Weighted average (12 mo)
- $870.82/EA
- Contracts (12 mo)
- 47
- Total quantity (12 mo)
- 123 EA
- Total amount (12 mo)
- $107,111
Source: FDOT Historical Item Average Cost report, statewide, fdot.gov, report run Nov 23, 2026, retrieved Nov 24, 2026. Figures as published by FDOT.
Weighted average by period
| Period | Dates | Contracts | Weighted avg | Total quantity | Total amount |
|---|---|---|---|---|---|
| 2024 | 2024-01-01 – 2024-12-31 | 51 | $757.98 | 150 | $113,698 |
| 2025 | 2025-01-01 – 2025-12-31 | 50 | $1,165.02 | 143 | $166,598 |
| Latest 12 months | 2025-11-01 – 2026-10-31 | 47 | $870.82 | 123 | $107,111 |
By FDOT market area (latest 12 months)
| Market area | Contracts | Weighted avg | vs. statewide | Total quantity |
|---|---|---|---|---|
| 03 | 1 | $930.00 | +6.8% | 3 |
| 05 | 1 | $990.00 | +13.7% | 4 |
| 06 | 5 | $502.56 | -42.3% | 16 |
| 07 | 4 | $834.98 | -4.1% | 7 |
| 08 | 13 | $1,031.87 | +18.5% | 35 |
| 10 | 3 | $570.49 | -34.5% | 9 |
| 11 | 1 | $648.64 | -25.5% | 4 |
| 12 | 9 | $1,068.71 | +22.7% | 15 |
| 13 | 6 | $898.87 | +3.2% | 17 |
FDOT Historical Item Average Cost reports by market area, Nov 1, 2025 to Oct 31, 2026. FDOT defines its 14 market areas; see the report page on fdot.gov.
Summary
FDOT pay item 0641 2 60 (Prestressed Concrete Pole, Complete Pole Removal- Pedestal/Service Pole) is measured in EA. In FDOT's Historical Item Average Cost report for Nov 1, 2025 to Oct 31, 2026, it appeared on 47 contracts with a quantity-weighted average of $870.82 per EA, on 123 EA worth $107,111 in total.
The same report run for earlier periods shows $757.98 in 2024 (51 contracts, 150 EA), $1,165.02 in 2025 (50 contracts, 143 EA), $870.82 in the latest 12 months (47 contracts, 123 EA). From 2024 to the latest 12 months the weighted average rose 14.9%.
Quantity let statewide shrank 18% over the same span, which can move a weighted average on its own because large contracts often carry lower unit prices.
FDOT's market-area reports for the same 12 months show how location moves the price. Among the 6 market areas with at least three contracts, market area 06 had the lowest weighted average ($502.56 per EA, 5 contracts) and market area 12 the highest ($1,068.71, 9 contracts), 2.1 times as much. Market area 08 let the most contracts with this item (13). 9 of FDOT's 14 market areas reported the item in this window.
FDOT weights its average on quantity at the contract level, so a single very large contract can pull the figure toward its price. The report does not publish quartiles or individual bids; FDOT's bid tabulation PDFs list every bidder's unit prices for a letting.
Other items in FDOT section 0641: 0641 2 12 Prestressed Concrete Pole, F&I, Type P-II Service Pole ($2,585.82 per EA, 102 contracts); 0641 2 80 Prestressed Concrete Pole, Complete Pole Removal- Pole 30' AND Greater ($11,463.97 per EA, 21 contracts); 0641 2 70 Prestressed Concrete Pole, Shallow Pole Removal- Pole 30' AND Greater ($4,726.84 per EA, 16 contracts); 0641 3163 Concrete Cctv Pole, Furnish & Install With Lowering Device, 63' ($41,820.81 per EA, 9 contracts); 0641 2 11 Prestressed Concrete Pole, F&I, Type P-II Pedestal ($2,379.71 per EA, 8 contracts).
Related items in section 0641
- 0641 2 12 · Prestressed Concrete Pole, F&I, Type P-II Service Pole ($2,585.82/EA)
- 0641 2 80 · Prestressed Concrete Pole, Complete Pole Removal- Pole 30' AND Greater ($11,463.97/EA)
- 0641 2 70 · Prestressed Concrete Pole, Shallow Pole Removal- Pole 30' AND Greater ($4,726.84/EA)
- 0641 3163 · Concrete Cctv Pole, Furnish & Install With Lowering Device, 63' ($41,820.81/EA)
- 0641 2 11 · Prestressed Concrete Pole, F&I, Type P-II Pedestal ($2,379.71/EA)
- 0641 3186 · Concrete Cctv Pole, Furnish & Install With Lowering Device, 86' ($48,085.99/EA)
- 0641 3169 · Concrete Cctv Pole, Furnish & Install With Lowering Device, 69' ($38,830.36/EA)
- 0641 3175 · Concrete Cctv Pole, Furnish & Install With Lowering Device, 75' ($49,732.31/EA)