Skip to content
BidTabulation.comDOT bid tabulations & unit-price intelligence
Menu

Conduit, Furnish & Install, Embedded Concrete Barriers AND Traffic Railings (Item 0630 2 16): FDOT Unit Price History

23 contracts · Nov 1, 2025 to Oct 31, 2026 · unit of measure LF

Weighted average (12 mo)
$14.04/LF
Contracts (12 mo)
23
Total quantity (12 mo)
242,234 LF
Total amount (12 mo)
$3,399,944

Source: FDOT Historical Item Average Cost report, statewide, fdot.gov, report run Nov 23, 2026, retrieved Nov 24, 2026. Figures as published by FDOT.

Weighted average by period

PeriodDatesContractsWeighted avgTotal quantityTotal amount
20242024-01-01 – 2024-12-3116$30.39244,127$7,420,201
20252025-01-01 – 2025-12-3129$17.58389,212$6,843,244
Latest 12 months2025-11-01 – 2026-10-3123$14.04242,234$3,399,944

By FDOT market area (latest 12 months)

Market areaContractsWeighted avgvs. statewideTotal quantity
014$10.01-28.7%5,900
022$4.78-66%2,656
033$12.32-12.3%6,901
041$20.00+42.5%960
051$65.87+369.2%50
073$12.19-13.2%55,385
081$9.67-31.1%1,839
101$11.00-21.7%22,060
111$22.11+57.5%35,248
125$13.54-3.6%111,225
131$30.00+113.7%10

FDOT Historical Item Average Cost reports by market area, Nov 1, 2025 to Oct 31, 2026. FDOT defines its 14 market areas; see the report page on fdot.gov.

Summary

FDOT pay item 0630 2 16 (Conduit, Furnish & Install, Embedded Concrete Barriers AND Traffic Railings) is measured in LF. In FDOT's Historical Item Average Cost report for Nov 1, 2025 to Oct 31, 2026, it appeared on 23 contracts with a quantity-weighted average of $14.04 per LF, on 242,234 LF worth $3,399,944 in total.

The same report run for earlier periods shows $30.39 in 2024 (16 contracts, 244,127 LF), $17.58 in 2025 (29 contracts, 389,212 LF), $14.04 in the latest 12 months (23 contracts, 242,234 LF). From 2024 to the latest 12 months the weighted average fell 53.8%.

FDOT's market-area reports for the same 12 months show how location moves the price. Among the 4 market areas with at least three contracts, market area 01 had the lowest weighted average ($10.01 per LF, 4 contracts) and market area 12 the highest ($13.54, 5 contracts), 1.4 times as much. Market area 12 let the most contracts with this item (5). 11 of FDOT's 14 market areas reported the item in this window.

FDOT weights its average on quantity at the contract level, so a single very large contract can pull the figure toward its price. The report does not publish quartiles or individual bids; FDOT's bid tabulation PDFs list every bidder's unit prices for a letting.

Other items in FDOT section 0630: 0630 2 12 Conduit, Furnish & Install, Directional Bore ($34.57 per LF, 171 contracts); 0630 2 11 Conduit, Furnish & Install, Open Trench ($17.21 per LF, 157 contracts); 0630 2 14 Conduit, Furnish & Install, Aboveground ($42.51 per LF, 57 contracts); 0630 2 15 Conduit, Furnish & Install, Bridge Mount ($49.71 per LF, 11 contracts); 0630 2 17 Conduit, Furnish & Install, Open Trench Under Pavement ($79.81 per LF, 3 contracts).

Related items in section 0630

Pricing an FDOT job? Upload your bid tab and compare every line with FDOT's published averages.

Benchmark a bid tab

How these figures are used: methodology. FDOT also posts a bid tabulation PDF for each letting.