Conduit, Furnish & Install, Aboveground (Item 0630 2 14): FDOT Unit Price History
57 contracts · Nov 1, 2025 to Oct 31, 2026 · unit of measure LF
- Weighted average (12 mo)
- $42.51/LF
- Contracts (12 mo)
- 57
- Total quantity (12 mo)
- 16,480 LF
- Total amount (12 mo)
- $700,584
Source: FDOT Historical Item Average Cost report, statewide, fdot.gov, report run Nov 23, 2026, retrieved Nov 24, 2026. Figures as published by FDOT.
Weighted average by period
| Period | Dates | Contracts | Weighted avg | Total quantity | Total amount |
|---|---|---|---|---|---|
| 2024 | 2024-01-01 – 2024-12-31 | 70 | $43.75 | 16,359 | $715,712 |
| 2025 | 2025-01-01 – 2025-12-31 | 66 | $55.75 | 32,533 | $1,813,840 |
| Latest 12 months | 2025-11-01 – 2026-10-31 | 57 | $42.51 | 16,480 | $700,584 |
By FDOT market area (latest 12 months)
| Market area | Contracts | Weighted avg | vs. statewide | Total quantity |
|---|---|---|---|---|
| 01 | 2 | $25.31 | -40.5% | 156 |
| 02 | 1 | $20.00 | -53% | 42 |
| 03 | 4 | $32.11 | -24.5% | 426 |
| 05 | 5 | $25.98 | -38.9% | 383 |
| 06 | 4 | $42.70 | +0.4% | 985 |
| 07 | 5 | $37.35 | -12.1% | 1,481 |
| 08 | 18 | $54.10 | +27.3% | 1,723 |
| 10 | 3 | $34.31 | -19.3% | 180 |
| 11 | 1 | $61.35 | +44.3% | 45 |
| 12 | 11 | $46.72 | +9.9% | 6,054 |
| 13 | 2 | $36.73 | -13.6% | 4,555 |
FDOT Historical Item Average Cost reports by market area, Nov 1, 2025 to Oct 31, 2026. FDOT defines its 14 market areas; see the report page on fdot.gov.
Summary
FDOT pay item 0630 2 14 (Conduit, Furnish & Install, Aboveground) is measured in LF. In FDOT's Historical Item Average Cost report for Nov 1, 2025 to Oct 31, 2026, it appeared on 57 contracts with a quantity-weighted average of $42.51 per LF, on 16,480 LF worth $700,584 in total.
The same report run for earlier periods shows $43.75 in 2024 (70 contracts, 16,359 LF), $55.75 in 2025 (66 contracts, 32,533 LF), $42.51 in the latest 12 months (57 contracts, 16,480 LF). Across those periods the weighted average stayed within three percent.
FDOT's market-area reports for the same 12 months show how location moves the price. Among the 7 market areas with at least three contracts, market area 05 had the lowest weighted average ($25.98 per LF, 5 contracts) and market area 08 the highest ($54.10, 18 contracts), 2.1 times as much. Market area 08 let the most contracts with this item (18). 11 of FDOT's 14 market areas reported the item in this window.
FDOT weights its average on quantity at the contract level, so a single very large contract can pull the figure toward its price. The report does not publish quartiles or individual bids; FDOT's bid tabulation PDFs list every bidder's unit prices for a letting.
Other items in FDOT section 0630: 0630 2 12 Conduit, Furnish & Install, Directional Bore ($34.57 per LF, 171 contracts); 0630 2 11 Conduit, Furnish & Install, Open Trench ($17.21 per LF, 157 contracts); 0630 2 16 Conduit, Furnish & Install, Embedded Concrete Barriers AND Traffic Railings ($14.04 per LF, 23 contracts); 0630 2 15 Conduit, Furnish & Install, Bridge Mount ($49.71 per LF, 11 contracts); 0630 2 17 Conduit, Furnish & Install, Open Trench Under Pavement ($79.81 per LF, 3 contracts).
Related items in section 0630
- 0630 2 12 · Conduit, Furnish & Install, Directional Bore ($34.57/LF)
- 0630 2 11 · Conduit, Furnish & Install, Open Trench ($17.21/LF)
- 0630 2 16 · Conduit, Furnish & Install, Embedded Concrete Barriers AND Traffic Railings ($14.04/LF)
- 0630 2 15 · Conduit, Furnish & Install, Bridge Mount ($49.71/LF)
- 0630 2 17 · Conduit, Furnish & Install, Open Trench Under Pavement ($79.81/LF)
- 0630 3 1 · Replace Route Marker FOR Existing Conduit ($248.43/EA)
- 0630 2 18 · Conduit, Furnish & Install, Split Duct ($76.00/LF)
- 0630 2 65 · Conduit, Remove, Bridge Mount ($0.810/LF)