Single Column Ground Sign Assembly, F&I Ground Mount, 12.0-20.0 SF (Item 0700 1112): FDOT Unit Price History

147 contracts · Nov 1, 2025 to Oct 31, 2026 · unit of measure EA

Weighted average (12 mo)
$2,123.77/EA
Contracts (12 mo)
147
Total quantity (12 mo)
1,926 EA
Total amount (12 mo)
$4,090,377

Source: FDOT Historical Item Average Cost report, statewide, fdot.gov, report run Nov 23, 2026, retrieved Nov 24, 2026. Figures as published by FDOT.

Weighted average by period

PeriodDatesContractsWeighted avgTotal quantityTotal amount
20242024-01-01 – 2024-12-31165$1,902.972,373$4,515,740
20252025-01-01 – 2025-12-31165$2,000.582,676$5,353,543
Latest 12 months2025-11-01 – 2026-10-31147$2,123.771,926$4,090,377

By FDOT market area (latest 12 months)

Market areaContractsWeighted avgvs. statewideTotal quantity
014$1,937.68-8.8%91
026$2,099.48-1.1%15
038$2,156.44+1.5%94
0413$2,161.17+1.8%124
0512$2,354.04+10.8%109
0613$2,183.15+2.8%182
0713$2,187.10+3%306
0836$2,174.80+2.4%425
093$1,539.62-27.5%76
1010$2,189.88+3.1%107
114$2,231.40+5.1%51
1213$1,963.68-7.5%216
1311$2,118.70-0.2%129
141$1,800.00-15.2%1

FDOT Historical Item Average Cost reports by market area, Nov 1, 2025 to Oct 31, 2026. FDOT defines its 14 market areas; see the report page on fdot.gov.

Summary

FDOT pay item 0700 1112 (Single Column Ground Sign Assembly, F&I Ground Mount, 12.0-20.0 SF) is measured in EA. In FDOT's Historical Item Average Cost report for Nov 1, 2025 to Oct 31, 2026, it appeared on 147 contracts with a quantity-weighted average of $2,123.77 per EA, on 1,926 EA worth $4,090,377 in total.

The same report run for earlier periods shows $1,902.97 in 2024 (165 contracts, 2,373 EA), $2,000.58 in 2025 (165 contracts, 2,676 EA), $2,123.77 in the latest 12 months (147 contracts, 1,926 EA). From 2024 to the latest 12 months the weighted average rose 11.6%.

Quantity let statewide shrank 19% over the same span, which can move a weighted average on its own because large contracts often carry lower unit prices.

FDOT's market-area reports for the same 12 months show how location moves the price. Among the 13 market areas with at least three contracts, market area 09 had the lowest weighted average ($1,539.62 per EA, 3 contracts) and market area 05 the highest ($2,354.04, 12 contracts), 1.5 times as much. Market area 08 let the most contracts with this item (36). 14 of FDOT's 14 market areas reported the item in this window.

FDOT weights its average on quantity at the contract level, so a single very large contract can pull the figure toward its price. The report does not publish quartiles or individual bids; FDOT's bid tabulation PDFs list every bidder's unit prices for a letting.

Other items in FDOT section 0700: 0700 1111 Single Column Ground Sign Assembly, F&I Ground Mount, Less Than 12 SF ($562.79 per EA, 199 contracts); 0700 1600 Single Column Ground Sign Assembly, Remove ($53.69 per EA, 193 contracts); 0700 1500 Single Column Ground Sign Assembly, Relocate ($371.65 per EA, 121 contracts); 0700 13 15 Retroreflective Sign Strip- Furnish AND Install, 5' ($102.80 per EA, 108 contracts); 0700 3601 Sign Panel, Remove, UP TO 12 SF ($55.04 per EA, 83 contracts).

Related items in section 0700

Pricing an FDOT job? Upload your bid tab and compare every line with FDOT's published averages.

Benchmark a bid tab

How these figures are used: methodology. FDOT also posts a bid tabulation PDF for each letting.