Concrete Traffic Separator, Special- Variable Width (Item 0520 70): FDOT Unit Price History

50 contracts · Nov 1, 2025 to Oct 31, 2026 · unit of measure SY

Weighted average (12 mo)
$131.63/SY
Contracts (12 mo)
50
Total quantity (12 mo)
28,864 SY
Total amount (12 mo)
$3,799,263

Source: FDOT Historical Item Average Cost report, statewide, fdot.gov, report run Nov 23, 2026, retrieved Nov 24, 2026. Figures as published by FDOT.

Weighted average by period

PeriodDatesContractsWeighted avgTotal quantityTotal amount
20242024-01-01 – 2024-12-3165$140.2926,089$3,659,974
20252025-01-01 – 2025-12-3159$162.2920,802$3,375,971
Latest 12 months2025-11-01 – 2026-10-3150$131.6328,864$3,799,263

By FDOT market area (latest 12 months)

Market areaContractsWeighted avgvs. statewideTotal quantity
012$145.26+10.4%4,460
033$186.95+42%257
041$125.00-5%88
056$122.94-6.6%2,756
067$125.17-4.9%3,762
072$168.73+28.2%2,310
0815$122.57-6.9%10,777
091$170.22+29.3%100
105$134.79+2.4%2,996
123$105.10-20.2%1,120
135$140.39+6.7%238

FDOT Historical Item Average Cost reports by market area, Nov 1, 2025 to Oct 31, 2026. FDOT defines its 14 market areas; see the report page on fdot.gov.

Summary

FDOT pay item 0520 70 (Concrete Traffic Separator, Special- Variable Width) is measured in SY. In FDOT's Historical Item Average Cost report for Nov 1, 2025 to Oct 31, 2026, it appeared on 50 contracts with a quantity-weighted average of $131.63 per SY, on 28,864 SY worth $3,799,263 in total.

The same report run for earlier periods shows $140.29 in 2024 (65 contracts, 26,089 SY), $162.29 in 2025 (59 contracts, 20,802 SY), $131.63 in the latest 12 months (50 contracts, 28,864 SY). From 2024 to the latest 12 months the weighted average fell 6.2%.

FDOT's market-area reports for the same 12 months show how location moves the price. Among the 7 market areas with at least three contracts, market area 12 had the lowest weighted average ($105.10 per SY, 3 contracts) and market area 03 the highest ($186.95, 3 contracts), 1.8 times as much. Market area 08 let the most contracts with this item (15). 11 of FDOT's 14 market areas reported the item in this window.

FDOT weights its average on quantity at the contract level, so a single very large contract can pull the figure toward its price. The report does not publish quartiles or individual bids; FDOT's bid tabulation PDFs list every bidder's unit prices for a letting.

Other items in FDOT section 0520: 0520 1 10 Concrete Curb & Gutter, Type F ($40.38 per LF, 148 contracts); 0520 1 7 Concrete Curb & Gutter, Type E ($36.29 per LF, 70 contracts); 0520 2 4 Concrete Curb, Type D ($36.96 per LF, 50 contracts); 0520 6 Shoulder Gutter- Concrete ($35.05 per LF, 32 contracts); 0520 3 Valley Gutter- Concrete ($50.59 per LF, 28 contracts).

Related items in section 0520

Pricing an FDOT job? Upload your bid tab and compare every line with FDOT's published averages.

Benchmark a bid tab

How these figures are used: methodology. FDOT also posts a bid tabulation PDF for each letting.