Valley Gutter- Concrete (Item 0520 3): FDOT Unit Price History

28 contracts · Nov 1, 2025 to Oct 31, 2026 · unit of measure LF

Weighted average (12 mo)
$50.59/LF
Contracts (12 mo)
28
Total quantity (12 mo)
4,352 LF
Total amount (12 mo)
$220,162

Source: FDOT Historical Item Average Cost report, statewide, fdot.gov, report run Nov 23, 2026, retrieved Nov 24, 2026. Figures as published by FDOT.

Weighted average by period

PeriodDatesContractsWeighted avgTotal quantityTotal amount
20242024-01-01 – 2024-12-3129$62.315,610$349,552
20252025-01-01 – 2025-12-3124$57.784,303$248,645
Latest 12 months2025-11-01 – 2026-10-3128$50.594,352$220,162

By FDOT market area (latest 12 months)

Market areaContractsWeighted avgvs. statewideTotal quantity
012$106.91+111.3%45
021$60.00+18.6%69
033$87.82+73.6%174
041$47.50-6.1%10
051$67.50+33.4%21
071$40.00-20.9%220
085$39.81-21.3%1,585
091$78.29+54.8%41
104$67.54+33.5%521
111$51.47+1.7%336
122$58.57+15.8%399
136$46.27-8.5%931

FDOT Historical Item Average Cost reports by market area, Nov 1, 2025 to Oct 31, 2026. FDOT defines its 14 market areas; see the report page on fdot.gov.

Summary

FDOT pay item 0520 3 (Valley Gutter- Concrete) is measured in LF. In FDOT's Historical Item Average Cost report for Nov 1, 2025 to Oct 31, 2026, it appeared on 28 contracts with a quantity-weighted average of $50.59 per LF, on 4,352 LF worth $220,162 in total.

The same report run for earlier periods shows $62.31 in 2024 (29 contracts, 5,610 LF), $57.78 in 2025 (24 contracts, 4,303 LF), $50.59 in the latest 12 months (28 contracts, 4,352 LF). From 2024 to the latest 12 months the weighted average fell 18.8%.

Quantity let statewide shrank 22% over the same span, which can move a weighted average on its own because large contracts often carry lower unit prices.

FDOT's market-area reports for the same 12 months show how location moves the price. Among the 4 market areas with at least three contracts, market area 08 had the lowest weighted average ($39.81 per LF, 5 contracts) and market area 03 the highest ($87.82, 3 contracts), 2.2 times as much. Market area 13 let the most contracts with this item (6). 12 of FDOT's 14 market areas reported the item in this window.

FDOT weights its average on quantity at the contract level, so a single very large contract can pull the figure toward its price. The report does not publish quartiles or individual bids; FDOT's bid tabulation PDFs list every bidder's unit prices for a letting.

Other items in FDOT section 0520: 0520 1 10 Concrete Curb & Gutter, Type F ($40.38 per LF, 148 contracts); 0520 1 7 Concrete Curb & Gutter, Type E ($36.29 per LF, 70 contracts); 0520 2 4 Concrete Curb, Type D ($36.96 per LF, 50 contracts); 0520 70 Concrete Traffic Separator, Special- Variable Width ($131.63 per SY, 50 contracts); 0520 6 Shoulder Gutter- Concrete ($35.05 per LF, 32 contracts).

Related items in section 0520

Pricing an FDOT job? Upload your bid tab and compare every line with FDOT's published averages.

Benchmark a bid tab

How these figures are used: methodology. FDOT also posts a bid tabulation PDF for each letting.