Thermoplastic, Preformed, White, Solid, 24" FOR Crosswalk (Item 0711 14125): FDOT Unit Price History

148 contracts · Nov 1, 2025 to Oct 31, 2026 · unit of measure LF

Weighted average (12 mo)
$15.72/LF
Contracts (12 mo)
148
Total quantity (12 mo)
234,066 LF
Total amount (12 mo)
$3,679,270

Source: FDOT Historical Item Average Cost report, statewide, fdot.gov, report run Nov 23, 2026, retrieved Nov 24, 2026. Figures as published by FDOT.

Weighted average by period

PeriodDatesContractsWeighted avgTotal quantityTotal amount
20242024-01-01 – 2024-12-31189$17.67309,047$5,459,510
20252025-01-01 – 2025-12-31190$17.16266,521$4,573,148
Latest 12 months2025-11-01 – 2026-10-31148$15.72234,066$3,679,270

By FDOT market area (latest 12 months)

Market areaContractsWeighted avgvs. statewideTotal quantity
017$16.48+4.8%12,323
025$13.72-12.7%3,264
037$13.04-17%9,901
043$15.89+1.1%4,891
0514$15.80+0.5%12,980
0615$14.59-7.2%28,116
0716$16.12+2.5%17,713
0839$15.57-1%79,709
093$7.68-51.1%7,572
1010$17.28+9.9%17,719
113$17.34+10.3%2,347
1211$17.18+9.3%11,598
1314$18.42+17.2%25,441
141$18.82+19.7%492

FDOT Historical Item Average Cost reports by market area, Nov 1, 2025 to Oct 31, 2026. FDOT defines its 14 market areas; see the report page on fdot.gov.

Summary

FDOT pay item 0711 14125 (Thermoplastic, Preformed, White, Solid, 24" FOR Crosswalk) is measured in LF. In FDOT's Historical Item Average Cost report for Nov 1, 2025 to Oct 31, 2026, it appeared on 148 contracts with a quantity-weighted average of $15.72 per LF, on 234,066 LF worth $3,679,270 in total.

The same report run for earlier periods shows $17.67 in 2024 (189 contracts, 309,047 LF), $17.16 in 2025 (190 contracts, 266,521 LF), $15.72 in the latest 12 months (148 contracts, 234,066 LF). From 2024 to the latest 12 months the weighted average fell 11.0%.

Quantity let statewide shrank 24% over the same span, which can move a weighted average on its own because large contracts often carry lower unit prices.

FDOT's market-area reports for the same 12 months show how location moves the price. Among the 13 market areas with at least three contracts, market area 09 had the lowest weighted average ($7.68 per LF, 3 contracts) and market area 13 the highest ($18.42, 14 contracts), 2.4 times as much. Market area 08 let the most contracts with this item (39). 14 of FDOT's 14 market areas reported the item in this window.

FDOT weights its average on quantity at the contract level, so a single very large contract can pull the figure toward its price. The report does not publish quartiles or individual bids; FDOT's bid tabulation PDFs list every bidder's unit prices for a letting.

Other items in FDOT section 0711: 0711 16201 Thermoplastic, Standard-Other Surfaces, Yellow, Solid, 6" ($5,264.57 per GM, 204 contracts); 0711 16101 Thermoplastic, Standard-Other Surfaces, White, Solid, 6" ($5,320.58 per GM, 202 contracts); 0711 11125 Thermoplastic, Standard, White, Solid, 24" FOR Stop Line AND Crosswalk ($7.00 per LF, 188 contracts); 0711 11170 Thermoplastic, Standard, White, Arrow ($86.63 per EA, 181 contracts); 0711 11124 Thermoplastic, Standard, White, Solid, 18" FOR Diagonals AND Chevrons ($5.52 per LF, 165 contracts).

Related items in section 0711

Pricing an FDOT job? Upload your bid tab and compare every line with FDOT's published averages.

Benchmark a bid tab

How these figures are used: methodology. FDOT also posts a bid tabulation PDF for each letting.