Reinforcing Steel- Roadway (Item 0415 1 1): FDOT Unit Price History

15 contracts · Nov 1, 2025 to Oct 31, 2026 · unit of measure LB

Weighted average (12 mo)
$1.04/LB
Contracts (12 mo)
15
Total quantity (12 mo)
753,163 LB
Total amount (12 mo)
$780,371

Source: FDOT Historical Item Average Cost report, statewide, fdot.gov, report run Nov 23, 2026, retrieved Nov 24, 2026. Figures as published by FDOT.

Weighted average by period

PeriodDatesContractsWeighted avgTotal quantityTotal amount
20242024-01-01 – 2024-12-3111$0.2603,129,282$809,387
20252025-01-01 – 2025-12-319$0.4802,723,393$1,297,039
Latest 12 months2025-11-01 – 2026-10-3115$1.04753,163$780,371

By FDOT market area (latest 12 months)

Market areaContractsWeighted avgvs. statewideTotal quantity
012$1.20+15.4%44,388
022$2.37+127.9%60,342
042$1.08+3.8%157,300
061$4.75+356.7%921
072$0.720-30.8%234,743
083$2.80+169.2%36,118
091$1.75+68.3%71,069
122$0.110-89.4%148,282

FDOT Historical Item Average Cost reports by market area, Nov 1, 2025 to Oct 31, 2026. FDOT defines its 14 market areas; see the report page on fdot.gov.

Summary

FDOT pay item 0415 1 1 (Reinforcing Steel- Roadway) is measured in LB. In FDOT's Historical Item Average Cost report for Nov 1, 2025 to Oct 31, 2026, it appeared on 15 contracts with a quantity-weighted average of $1.04 per LB, on 753,163 LB worth $780,371 in total.

The same report run for earlier periods shows $0.260 in 2024 (11 contracts, 3,129,282 LB), $0.480 in 2025 (9 contracts, 2,723,393 LB), $1.04 in the latest 12 months (15 contracts, 753,163 LB). From 2024 to the latest 12 months the weighted average rose 300.0%.

Quantity let statewide shrank 76% over the same span, which can move a weighted average on its own because large contracts often carry lower unit prices.

In the same 12 months, 8 of FDOT's 14 market areas reported this item: area 01 at $1.20 (2 contracts), area 02 at $2.37 (2 contracts), area 04 at $1.08 (2 contracts), area 06 at $4.75 (1 contract), area 07 at $0.720 (2 contracts), area 08 at $2.80 (3 contracts), area 09 at $1.75 (1 contract), area 12 at $0.110 (2 contracts).

FDOT weights its average on quantity at the contract level, so a single very large contract can pull the figure toward its price. The report does not publish quartiles or individual bids; FDOT's bid tabulation PDFs list every bidder's unit prices for a letting.

Other items in FDOT section 0415: 0415 1 5 Reinforcing Steel- Bridge Substructure ($1.56 per LB, 29 contracts); 0415 1 4 Reinforcing Steel - Bridge Superstructure ($1.51 per LB, 28 contracts); 0415 1 9 Reinforcing Steel- Approach Slabs ($1.57 per LB, 28 contracts); 0415 10 5 Fiber Reinforced Polymer Bars, #5 BAR ($2.57 per LF, 10 contracts); 0415 1 3 Reinforcing Steel- Retaining Wall ($1.52 per LB, 8 contracts).

Related items in section 0415

Pricing an FDOT job? Upload your bid tab and compare every line with FDOT's published averages.

Benchmark a bid tab

How these figures are used: methodology. FDOT also posts a bid tabulation PDF for each letting.