Special Guardrail Post- Encased Post FOR Shallow Mount (Item 0536 7 3): FDOT Unit Price History
14 contracts · Nov 1, 2025 to Oct 31, 2026 · unit of measure EA
- Weighted average (12 mo)
- $137.65/EA
- Contracts (12 mo)
- 14
- Total quantity (12 mo)
- 126 EA
- Total amount (12 mo)
- $17,344
Source: FDOT Historical Item Average Cost report, statewide, fdot.gov, report run Nov 23, 2026, retrieved Nov 24, 2026. Figures as published by FDOT.
Weighted average by period
| Period | Dates | Contracts | Weighted avg | Total quantity | Total amount |
|---|---|---|---|---|---|
| 2024 | 2024-01-01 – 2024-12-31 | 30 | $136.48 | 454 | $61,961 |
| 2025 | 2025-01-01 – 2025-12-31 | 29 | $128.44 | 441 | $56,642 |
| Latest 12 months | 2025-11-01 – 2026-10-31 | 14 | $137.65 | 126 | $17,344 |
By FDOT market area (latest 12 months)
| Market area | Contracts | Weighted avg | vs. statewide | Total quantity |
|---|---|---|---|---|
| 02 | 1 | $105.89 | -23.1% | 11 |
| 03 | 2 | $106.04 | -23% | 11 |
| 04 | 2 | $245.31 | +78.2% | 9 |
| 07 | 4 | $146.73 | +6.6% | 10 |
| 08 | 1 | $131.82 | -4.2% | 5 |
| 11 | 1 | $61.64 | -55.2% | 8 |
| 12 | 2 | $140.71 | +2.2% | 71 |
| 13 | 1 | $195.00 | +41.7% | 1 |
FDOT Historical Item Average Cost reports by market area, Nov 1, 2025 to Oct 31, 2026. FDOT defines its 14 market areas; see the report page on fdot.gov.
Summary
FDOT pay item 0536 7 3 (Special Guardrail Post- Encased Post FOR Shallow Mount) is measured in EA. In FDOT's Historical Item Average Cost report for Nov 1, 2025 to Oct 31, 2026, it appeared on 14 contracts with a quantity-weighted average of $137.65 per EA, on 126 EA worth $17,344 in total.
The same report run for earlier periods shows $136.48 in 2024 (30 contracts, 454 EA), $128.44 in 2025 (29 contracts, 441 EA), $137.65 in the latest 12 months (14 contracts, 126 EA). Across those periods the weighted average stayed within three percent.
Quantity let statewide shrank 72% over the same span, which can move a weighted average on its own because large contracts often carry lower unit prices.
In the same 12 months, 8 of FDOT's 14 market areas reported this item: area 02 at $105.89 (1 contract), area 03 at $106.04 (2 contracts), area 04 at $245.31 (2 contracts), area 07 at $146.73 (4 contracts), area 08 at $131.82 (1 contract), area 11 at $61.64 (1 contract), area 12 at $140.71 (2 contracts), area 13 at $195.00 (1 contract).
FDOT weights its average on quantity at the contract level, so a single very large contract can pull the figure toward its price. The report does not publish quartiles or individual bids; FDOT's bid tabulation PDFs list every bidder's unit prices for a letting.
Other items in FDOT section 0536: 0536 73 Guardrail Removal ($1.23 per LF, 84 contracts); 0536 1 1 Guardrail -Roadway, General TL-3 ($24.61 per LF, 76 contracts); 0536 85 24 Guardrail END Treatment- Parallel Approach Terminal ($3,264.12 per EA, 76 contracts); 0536 85 20 Guardrail END Treatment- Trailing Anchorage ($1,643.44 per EA, 55 contracts); 0536 8122 Guardrail Transition Connection TO Rigid Barrier, F&I- Index 536-002, Approach TL-3 ($3,461.91 per EA, 26 contracts).
Related items in section 0536
- 0536 73 · Guardrail Removal ($1.23/LF)
- 0536 1 1 · Guardrail -Roadway, General TL-3 ($24.61/LF)
- 0536 85 24 · Guardrail END Treatment- Parallel Approach Terminal ($3,264.12/EA)
- 0536 85 20 · Guardrail END Treatment- Trailing Anchorage ($1,643.44/EA)
- 0536 8122 · Guardrail Transition Connection TO Rigid Barrier, F&I- Index 536-002, Approach TL-3 ($3,461.91/EA)
- 0536 8112 · Guardrail Transition Connection TO Rigid Barrier, F&I- Index 536-001, Approach TL-3 ($3,224.76/EA)
- 0536 8113 · Guardrail Transition Connection TO Rigid Barrier, F&I- Index 536-001, Trailing ($1,546.11/EA)
- 0536 1 0 · Guardrail -Roadway, General/LOW Speed TL-2 ($20.79/LF)