Manholes, P-7, Partial (Item 0425 2 43): FDOT Unit Price History
17 contracts · Nov 1, 2025 to Oct 31, 2026 · unit of measure EA
- Weighted average (12 mo)
- $5,917.65/EA
- Contracts (12 mo)
- 17
- Total quantity (12 mo)
- 36 EA
- Total amount (12 mo)
- $213,035
Source: FDOT Historical Item Average Cost report, statewide, fdot.gov, report run Nov 23, 2026, retrieved Nov 24, 2026. Figures as published by FDOT.
Weighted average by period
| Period | Dates | Contracts | Weighted avg | Total quantity | Total amount |
|---|---|---|---|---|---|
| 2024 | 2024-01-01 – 2024-12-31 | 27 | $4,522.79 | 121 | $547,258 |
| 2025 | 2025-01-01 – 2025-12-31 | 14 | $5,535.52 | 23 | $127,317 |
| Latest 12 months | 2025-11-01 – 2026-10-31 | 17 | $5,917.65 | 36 | $213,035 |
By FDOT market area (latest 12 months)
| Market area | Contracts | Weighted avg | vs. statewide | Total quantity |
|---|---|---|---|---|
| 05 | 2 | $6,206.89 | +4.9% | 4 |
| 06 | 2 | $6,565.33 | +10.9% | 3 |
| 08 | 5 | $4,854.37 | -18% | 8 |
| 09 | 1 | $6,500.00 | +9.8% | 2 |
| 10 | 1 | $5,800.00 | -2% | 3 |
| 12 | 4 | $4,686.74 | -20.8% | 8 |
| 13 | 2 | $7,722.88 | +30.5% | 8 |
FDOT Historical Item Average Cost reports by market area, Nov 1, 2025 to Oct 31, 2026. FDOT defines its 14 market areas; see the report page on fdot.gov.
Summary
FDOT pay item 0425 2 43 (Manholes, P-7, Partial) is measured in EA. In FDOT's Historical Item Average Cost report for Nov 1, 2025 to Oct 31, 2026, it appeared on 17 contracts with a quantity-weighted average of $5,917.65 per EA, on 36 EA worth $213,035 in total.
The same report run for earlier periods shows $4,522.79 in 2024 (27 contracts, 121 EA), $5,535.52 in 2025 (14 contracts, 23 EA), $5,917.65 in the latest 12 months (17 contracts, 36 EA). From 2024 to the latest 12 months the weighted average rose 30.8%.
Quantity let statewide shrank 70% over the same span, which can move a weighted average on its own because large contracts often carry lower unit prices.
In the same 12 months, 7 of FDOT's 14 market areas reported this item: area 05 at $6,206.89 (2 contracts), area 06 at $6,565.33 (2 contracts), area 08 at $4,854.37 (5 contracts), area 09 at $6,500.00 (1 contract), area 10 at $5,800.00 (1 contract), area 12 at $4,686.74 (4 contracts), area 13 at $7,722.88 (2 contracts).
FDOT weights its average on quantity at the contract level, so a single very large contract can pull the figure toward its price. The report does not publish quartiles or individual bids; FDOT's bid tabulation PDFs list every bidder's unit prices for a letting.
Other items in FDOT section 0425: 0425 5 Manhole, Adjust ($1,119.50 per EA, 80 contracts); 0425 6 Valve Boxes, Adjust ($983.70 per EA, 53 contracts); 0425 5 1 Manhole, Adjust, Utilities ($1,452.45 per EA, 41 contracts); 0425 1351 Inlets, Curb, Type P-5, <10' ($9,463.26 per EA, 38 contracts); 0425 1521 Inlets, DT BOT, Type C,<10' ($6,260.63 per EA, 38 contracts).
Related items in section 0425
- 0425 5 · Manhole, Adjust ($1,119.50/EA)
- 0425 6 · Valve Boxes, Adjust ($983.70/EA)
- 0425 5 1 · Manhole, Adjust, Utilities ($1,452.45/EA)
- 0425 1351 · Inlets, Curb, Type P-5, <10' ($9,463.26/EA)
- 0425 1521 · Inlets, DT BOT, Type C,<10' ($6,260.63/EA)
- 0425 1541 · Inlets, DT BOT, Type D, <10' ($7,311.31/EA)
- 0425 2 61 · Manholes, P-8, <10' ($7,273.90/EA)
- 0425 2 41 · Manholes, P-7, <10' ($7,512.23/EA)
Pricing an FDOT job? Upload your bid tab and compare every line with FDOT's published averages.
Benchmark a bid tabHow these figures are used: methodology. FDOT also posts a bid tabulation PDF for each letting.