RE Profile PM TY I(W)6"(SLD)(100MIL) (Item 666-7266): TxDOT Unit Price History

1,319 bids · 235 bid lines · Nov 6, 2024 to Nov 4, 2026 · unit of measure LF

TxDOT 666-7266 · RE PROFILE PM TY I(W)6"(SLD)(100MIL) · Unit: LF

Low bid
$0.600/LF
Quantity-weighted median of winning unit prices
Weighted median
$0.670/LF
Quantity-weighted median of every bid
Engineer’s estimate
$0.680/LF
Quantity-weighted median of TxDOT’s estimate per line
12-mo trend
-5.05%
Median unit price, last 12 months vs the 12 before
Price vs. quantity
$1.00$2.00$3.00$4.00$5.00$6.001001K10K100K1M10MQuantity (LF), log scaleUnit price ($/LF)
Winning (low) bid Other bid Fitted price curve (ln price = 2.11 − 0.195·ln qty, R² 0.54)320 plotted bids, 6 above the chart range

Source: TxDOT bid tabulation dataset, data.texas.gov de7b-7dna, lettings Nov 6, 2024–Nov 4, 2026, retrieved Nov 24, 2026. Weighted figures are quantity-weighted; see how we compute them.

Export bid rows (CSV)

Summary

TxDOT pay item 666-7266 (RE Profile PM TY I(W)6"(SLD)(100MIL)) is measured in LF. Between Nov 6, 2024 and Nov 4, 2026, contractors entered 1,319 bids for it on 235 published bid lines in TxDOT lettings. Over the last 12 months, the quantity-weighted median of all 645 bids was $0.670 per LF, and the winning low bidders priced it at a weighted median of $0.600 per LF.

TxDOT's engineer's estimate for the same lines had a weighted median of $0.680 per LF, so winning bids came in 11.8% below the estimate.

By calendar year, the median bid moved from $1.00 in 2025 (690 bids) to $0.900 in 2026 (569 bids), down 10.0%. The middle half of 2026 bids fell between $0.720 and $1.34.

Comparing the last 12 months with the 12 months before, the median unit price fell 5.05%.

Quantity matters for this item. Lines of 100 to 15,498 LF had a weighted median of $1.40, while lines above 87,196 LF had $0.660, a 53% lower price for large quantities. TxDOT itself warns that high-quantity items are often discounted, so compare your quantity band rather than the overall average.

Across 233 lines where both a winning and a second-place bid were published, the median winning unit price was $0.900 against $0.940 from the second-lowest bidder, a median gap of 1% on this line. Because the low bidder is decided on the whole proposal, the low bidder is not always the cheapest on every line.

Prices differ by district. Among the 21 TxDOT districts with at least ten bids, Fort Worth had the lowest weighted median ($0.380) and Lufkin the highest ($1.75). The busiest district for this item was Austin.

The most recent letting with this item was on Nov 4, 2026 in Hays County, where Bobcat Services, Inc. was the low bidder at $1.05 per LF for 34,574 LF against an estimate of $0.810.

13 bids outside a log-scale outlier fence (mostly token bids of a few cents or a dollar, typical of unbalanced bidding) are left out of these statistics but remain in the CSV export.

Related items: 666-7024 Refl PAV MRK TY I (W)8"(SLD)(100MIL) (weighted median $0.850 per LF); 666-7423 Refl PAV MRK TY I (Y)6"(SLD)(100MIL) (weighted median $0.450 per LF); 666-7036 Refl PAV MRK TY I (W)24"(SLD)(100MIL) (weighted median $7.00 per LF); 666-7411 Refl PAV MRK TY I (W)6"(SLD)(100MIL) (weighted median $0.450 per LF).

Unit price by year

YearBidsBid linesWeighted avgWeighted medianMedian25th pct75th pct
20246012$0.710$0.700$1.02$0.740$2.00
2025690122$0.730$0.670$1.00$0.780$1.40
2026569102$0.690$0.670$0.900$0.720$1.34

Quantity bands

BandQuantity (LF)BidsWeighted avgWeighted median25th–75th pct
Small100–15,498449$1.82$1.40$1.25–$3.00
Medium16,022–86,655434$0.940$0.900$0.790–$1.05
Large87,196–2,456,873436$0.690$0.660$0.640–$0.880

Bands split bids into thirds by quantity. TxDOT notes that high-quantity items are often discounted, which pulls overall averages down.

Winning bid vs. second-low vs. engineer’s estimate

Median winning unit price
$0.900
Median second-low unit price
$0.940
Median engineer’s estimate
$0.940
Median gap, second vs. low
+1%

233 published lines with both a rank-1 and a rank-2 bid.

Contractor head-to-head · Money left on the table

Proposal 0016-03-125 · let Nov 4, 2026 · Hays County, Austin District

Line quantity 34,574 LF · Engineer’s estimate $0.810/LF

  • 1. Bobcat Services, Inc.

    LOW BID · WINNER
    Unit price
    $1.05/LF
    Extension
    $36,302.70
    Proposal total
    $2,797,454
    Money left on the table
    $386,828 (13.83%)
    vs. engineer’s estimate
    +29.6%
  • Unit price
    $0.85/LF
    Extension
    $29,387.90
    Proposal total
    $3,184,282
    vs. low bid
    +$386,828
    vs. engineer’s estimate
    +4.9%
  • Unit price
    $1.00/LF
    Extension
    $34,574.00
    Proposal total
    $3,495,937
    vs. low bid
    +$698,482
    vs. engineer’s estimate
    +23.5%
  • Unit price
    $0.75/LF
    Extension
    $25,930.50
    Proposal total
    $3,586,449
    vs. low bid
    +$788,995
    vs. engineer’s estimate
    -7.4%
  • Unit price
    $0.85/LF
    Extension
    $29,387.90
    Proposal total
    $3,801,261
    vs. low bid
    +$1,003,807
    vs. engineer’s estimate
    +4.9%
  • Unit price
    $0.85/LF
    Extension
    $29,387.90
    Proposal total
    $3,825,058
    vs. low bid
    +$1,027,604
    vs. engineer’s estimate
    +4.9%

Proposal 0212-03-058 · let Nov 4, 2026 · Brazos County, Bryan District

Line quantity 35,636 LF · Engineer’s estimate $1.00/LF

  • 1. Fluor Enterprises, Inc.

    LOW BID · WINNER
    Unit price
    $1.05/LF
    Extension
    $37,417.80
    Proposal total
    $30,209,876
    Money left on the table
    $2,977,718 (9.86%)
    vs. engineer’s estimate
    +5%
  • Unit price
    $0.90/LF
    Extension
    $32,072.40
    Proposal total
    $33,187,594
    vs. low bid
    +$2,977,718
    vs. engineer’s estimate
    -10%
  • Unit price
    $1.34/LF
    Extension
    $47,752.24
    Proposal total
    $33,911,798
    vs. low bid
    +$3,701,922
    vs. engineer’s estimate
    +34%
  • Unit price
    $1.10/LF
    Extension
    $39,199.60
    Proposal total
    $34,862,676
    vs. low bid
    +$4,652,800
    vs. engineer’s estimate
    +10%
  • Unit price
    $0.80/LF
    Extension
    $28,508.80
    Proposal total
    $39,237,828
    vs. low bid
    +$9,027,952
    vs. engineer’s estimate
    -20%
  • Unit price
    $0.80/LF
    Extension
    $28,508.80
    Proposal total
    $39,562,405
    vs. low bid
    +$9,352,529
    vs. engineer’s estimate
    -20%
  • Unit price
    $0.84/LF
    Extension
    $29,934.24
    Proposal total
    $39,630,699
    vs. low bid
    +$9,420,823
    vs. engineer’s estimate
    -16%
  • Unit price
    $1.10/LF
    Extension
    $39,199.60
    Proposal total
    $39,994,995
    vs. low bid
    +$9,785,119
    vs. engineer’s estimate
    +10%
  • 9. Zachry Construction Corporation

    Unit price
    $1.35/LF
    Extension
    $48,108.60
    Proposal total
    $42,444,061
    vs. low bid
    +$12,234,185
    vs. engineer’s estimate
    +35%
  • 10. Brizo Construction, LLC

    Unit price
    $1.16/LF
    Extension
    $41,337.76
    Proposal total
    $43,708,350
    vs. low bid
    +$13,498,474
    vs. engineer’s estimate
    +16%
  • Unit price
    $1.25/LF
    Extension
    $44,545.00
    Proposal total
    $44,387,970
    vs. low bid
    +$14,178,094
    vs. engineer’s estimate
    +25%
  • Unit price
    $1.44/LF
    Extension
    $51,315.84
    Proposal total
    $48,396,973
    vs. low bid
    +$18,187,097
    vs. engineer’s estimate
    +44%

Proposal 1017-03-040 · let Nov 4, 2026 · Hunt County, Paris District

Line quantity 55,772 LF · Engineer’s estimate $0.850/LF

  • 1. Highway 19 Construction LLC

    LOW BID · WINNER
    Unit price
    $0.69/LF
    Extension
    $38,482.68
    Proposal total
    $6,803,596
    Money left on the table
    $438,151 (6.44%)
    vs. engineer’s estimate
    -18.8%
  • Unit price
    $0.70/LF
    Extension
    $39,207.72
    Proposal total
    $7,241,746
    vs. low bid
    +$438,151
    vs. engineer’s estimate
    -17.3%
  • Unit price
    $0.70/LF
    Extension
    $39,040.40
    Proposal total
    $7,366,754
    vs. low bid
    +$563,159
    vs. engineer’s estimate
    -17.6%
  • Unit price
    $0.67/LF
    Extension
    $37,367.24
    Proposal total
    $7,400,348
    vs. low bid
    +$596,752
    vs. engineer’s estimate
    -21.2%
  • Unit price
    $0.66/LF
    Extension
    $36,809.52
    Proposal total
    $7,514,717
    vs. low bid
    +$711,122
    vs. engineer’s estimate
    -22.4%
  • Unit price
    $0.69/LF
    Extension
    $38,482.68
    Proposal total
    $7,794,981
    vs. low bid
    +$991,385
    vs. engineer’s estimate
    -18.8%
  • Unit price
    $0.67/LF
    Extension
    $37,367.24
    Proposal total
    $7,795,159
    vs. low bid
    +$991,563
    vs. engineer’s estimate
    -21.2%
  • Unit price
    $0.70/LF
    Extension
    $39,040.40
    Proposal total
    $8,325,506
    vs. low bid
    +$1,521,910
    vs. engineer’s estimate
    -17.6%
  • Unit price
    $0.75/LF
    Extension
    $41,829.00
    Proposal total
    $9,159,173
    vs. low bid
    +$2,355,578
    vs. engineer’s estimate
    -11.8%

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

Last 10 lettings with this item

Let dateCSJCountyDistrictQtyBiddersLow bidderLow unit priceEstimate
2026-11-040016-03-125HaysAustin34,5746Bobcat Services, Inc.$1.05$0.810
2026-11-040212-03-058BrazosBryan35,63612Fluor Enterprises, Inc.$1.05$1.00
2026-11-041017-03-040HuntParis55,7729Highway 19 Construction LLC$0.690$0.850
2026-11-030015-13-432TravisAustin105,2216Austin Bridge & Road Services, LP$0.720$1.50
2026-11-030044-06-079MontagueWichita Falls1,240,5326Breedon Investments USA Inc.$0.670$0.550
2026-11-030901-00-066LamarParis1,420,1724Striping Technology, L.P.$0.600$0.620
2026-11-032552-01-062El PasoEl Paso38,5656Allen Concrete, LLC$1.45$1.20
2026-10-146502-76-001EllisDallas26,4002Stripe-A-Zone, LLC$0.960$0.870
2026-10-070022-01-034TerrellOdessa6,8407Relmco, Inc.$2.20$1.00
2026-10-070907-00-217Tom GreenSan Angelo2,456,8737Flat Line, Inc.$0.570$0.680

By district

DistrictBidsLow bid (w. median)Weighted medianEstimate12-mo trend
Abilene31$0.650$0.650$0.700—
Atlanta7$0.710$0.850$0.500—
Austin210$0.660$0.730$0.800-16.18%
Beaumont25$0.850$0.900$0.620—
Brownwood37$0.750$0.750$0.900-11.76%
Bryan43$0.570$0.660$0.550—
Childress11$1.12$0.650$0.700—
Corpus Christi4$2.00$7.19$1.00—
Dallas17$0.890$0.810$0.870—
El Paso43$0.610$0.800$0.550-24.16%
Fort Worth43$0.150$0.380$0.640-8.67%
Houston104$0.800$0.800$1.13-32%
Laredo34$0.600$0.610$0.670+8.57%
Lubbock2$1.40$1.35$2.50—
Lufkin23$1.75$1.75$2.00—
Odessa74$0.700$0.700$0.650+7.53%
Paris68$0.600$0.680$0.620-20.39%
Pharr76$0.550$0.600$0.700-7.07%
San Angelo33$0.570$0.700$0.680+34.04%
San Antonio196$0.540$0.670$0.700-4.76%
Tyler50$0.640$0.640$0.750+17.65%
Waco40$0.470$0.600$0.700—
Wichita Falls12$0.670$0.670$0.550—
Yoakum136$1.05$0.950$0.750+77.78%

Related items

Is your price for item 666-7266 in line? Benchmark your whole bid tab against TxDOT bid history.

Benchmark a bid tab

Official source: TxDOT bid tabulations open dataset (data.texas.gov, de7b-7dna) · Bid Items and Index (txdot.gov). Data as published by TxDOT; figures computed by Bid Tabulation.