Milling Existing Asphalt Pavement, 1 1/2" AVG Depth (Item 0327 70 6): FDOT Unit Price History

173 contracts · Nov 1, 2025 to Oct 31, 2026 · unit of measure SY

Weighted average (12 mo)
$2.79/SY
Contracts (12 mo)
173
Total quantity (12 mo)
5,087,080 SY
Total amount (12 mo)
$14,182,104

Source: FDOT Historical Item Average Cost report, statewide, fdot.gov, report run Nov 23, 2026, retrieved Nov 24, 2026. Figures as published by FDOT.

Weighted average by period

PeriodDatesContractsWeighted avgTotal quantityTotal amount
20242024-01-01 – 2024-12-31188$3.526,666,553$23,496,082
20252025-01-01 – 2025-12-31216$3.067,150,052$21,894,990
Latest 12 months2025-11-01 – 2026-10-31173$2.795,087,080$14,182,104

By FDOT market area (latest 12 months)

Market areaContractsWeighted avgvs. statewideTotal quantity
0110$2.27-18.6%164,223
0210$1.50-46.2%341,668
039$1.69-39.4%282,157
0413$2.62-6.1%439,386
0516$2.77-0.7%363,829
0611$2.15-22.9%453,034
0719$2.99+7.2%426,236
0840$3.09+10.8%1,183,774
093$3.02+8.2%197,098
1012$3.31+18.6%311,332
114$3.04+9%81,298
1215$3.41+22.2%380,113
139$3.36+20.4%404,402
141$4.00+43.4%52,933

FDOT Historical Item Average Cost reports by market area, Nov 1, 2025 to Oct 31, 2026. FDOT defines its 14 market areas; see the report page on fdot.gov.

Summary

FDOT pay item 0327 70 6 (Milling Existing Asphalt Pavement, 1 1/2" AVG Depth) is measured in SY. In FDOT's Historical Item Average Cost report for Nov 1, 2025 to Oct 31, 2026, it appeared on 173 contracts with a quantity-weighted average of $2.79 per SY, on 5,087,080 SY worth $14,182,104 in total.

The same report run for earlier periods shows $3.52 in 2024 (188 contracts, 6,666,553 SY), $3.06 in 2025 (216 contracts, 7,150,052 SY), $2.79 in the latest 12 months (173 contracts, 5,087,080 SY). From 2024 to the latest 12 months the weighted average fell 20.7%.

Quantity let statewide shrank 24% over the same span, which can move a weighted average on its own because large contracts often carry lower unit prices.

FDOT's market-area reports for the same 12 months show how location moves the price. Among the 13 market areas with at least three contracts, market area 02 had the lowest weighted average ($1.50 per SY, 10 contracts) and market area 12 the highest ($3.41, 15 contracts), 2.3 times as much. Market area 08 let the most contracts with this item (40). 14 of FDOT's 14 market areas reported the item in this window.

FDOT weights its average on quantity at the contract level, so a single very large contract can pull the figure toward its price. The report does not publish quartiles or individual bids; FDOT's bid tabulation PDFs list every bidder's unit prices for a letting.

Other items in FDOT section 0327: 0327 70 4 Milling Existing Asphalt Pavement, 3" AVG Depth ($2.91 per SY, 73 contracts); 0327 70 5 Milling Existing Asphalt Pavement, 2" AVG Depth ($1.90 per SY, 52 contracts); 0327 70 11 Milling Existing Asphalt Pavement, 2 1/4" AVG Depth ($2.22 per SY, 46 contracts); 0327 70 19 Milling Existing Asphalt Pavement, 3/4" AVG Depth ($2.13 per SY, 31 contracts); 0327 70 2 Milling Existing Asphalt Pavement, 3 1/2" AVG Depth ($3.26 per SY, 27 contracts).

Related items in section 0327

Pricing an FDOT job? Upload your bid tab and compare every line with FDOT's published averages.

Benchmark a bid tab

How these figures are used: methodology. FDOT also posts a bid tabulation PDF for each letting.