Mailbox, F&I Single (Item 0110 7 1): FDOT Unit Price History
26 contracts · Nov 1, 2025 to Oct 31, 2026 · unit of measure EA
- Weighted average (12 mo)
- $387.04/EA
- Contracts (12 mo)
- 26
- Total quantity (12 mo)
- 207 EA
- Total amount (12 mo)
- $80,118
Source: FDOT Historical Item Average Cost report, statewide, fdot.gov, report run Nov 23, 2026, retrieved Nov 24, 2026. Figures as published by FDOT.
Weighted average by period
| Period | Dates | Contracts | Weighted avg | Total quantity | Total amount |
|---|---|---|---|---|---|
| 2024 | 2024-01-01 – 2024-12-31 | 46 | $320.94 | 563 | $180,688 |
| 2025 | 2025-01-01 – 2025-12-31 | 31 | $414.96 | 239 | $99,175 |
| Latest 12 months | 2025-11-01 – 2026-10-31 | 26 | $387.04 | 207 | $80,118 |
By FDOT market area (latest 12 months)
| Market area | Contracts | Weighted avg | vs. statewide | Total quantity |
|---|---|---|---|---|
| 01 | 2 | $846.16 | +118.6% | 11 |
| 02 | 4 | $224.30 | -42% | 14 |
| 03 | 3 | $217.93 | -43.7% | 36 |
| 04 | 2 | $337.51 | -12.8% | 7 |
| 07 | 7 | $363.96 | -6% | 67 |
| 08 | 5 | $429.13 | +10.9% | 46 |
| 09 | 1 | $500.00 | +29.2% | 11 |
| 10 | 1 | $333.98 | -13.7% | 6 |
| 11 | 1 | $648.12 | +67.5% | 9 |
FDOT Historical Item Average Cost reports by market area, Nov 1, 2025 to Oct 31, 2026. FDOT defines its 14 market areas; see the report page on fdot.gov.
Summary
FDOT pay item 0110 7 1 (Mailbox, F&I Single) is measured in EA. In FDOT's Historical Item Average Cost report for Nov 1, 2025 to Oct 31, 2026, it appeared on 26 contracts with a quantity-weighted average of $387.04 per EA, on 207 EA worth $80,118 in total.
The same report run for earlier periods shows $320.94 in 2024 (46 contracts, 563 EA), $414.96 in 2025 (31 contracts, 239 EA), $387.04 in the latest 12 months (26 contracts, 207 EA). From 2024 to the latest 12 months the weighted average rose 20.6%.
Quantity let statewide shrank 63% over the same span, which can move a weighted average on its own because large contracts often carry lower unit prices.
FDOT's market-area reports for the same 12 months show how location moves the price. Among the 4 market areas with at least three contracts, market area 03 had the lowest weighted average ($217.93 per EA, 3 contracts) and market area 08 the highest ($429.13, 5 contracts), 2.0 times as much. Market area 07 let the most contracts with this item (7). 9 of FDOT's 14 market areas reported the item in this window.
FDOT weights its average on quantity at the contract level, so a single very large contract can pull the figure toward its price. The report does not publish quartiles or individual bids; FDOT's bid tabulation PDFs list every bidder's unit prices for a letting.
Other items in FDOT section 0110: 0110 1 1 Clearing & Grubbing ($52,554.01 per AC, 231 contracts); 0110 4 10 Removal OF Existing Concrete ($34.86 per SY, 194 contracts); 0110 21 Tree Protection Barrier ($4.87 per LF, 47 contracts); 0110 3 Removal OF Existing Structures/Bridges ($58.97 per SF, 36 contracts); 0110 22 Tree Root AND Branch Pruning ($828.28 per EA, 30 contracts).
Related items in section 0110
- 0110 1 1 · Clearing & Grubbing ($52,554.01/AC)
- 0110 4 10 · Removal OF Existing Concrete ($34.86/SY)
- 0110 21 · Tree Protection Barrier ($4.87/LF)
- 0110 3 · Removal OF Existing Structures/Bridges ($58.97/SF)
- 0110 22 · Tree Root AND Branch Pruning ($828.28/EA)
- 0110 2 2 · Selective Clearing AND Grubbing, Areas With Trees TO Remain ($14,713.50/AC)
- 0110 23 · Tree Removal ($303.42/EA)
- 0110 71 1 · Bridge Fender System, Removal & Disposal ($1,484.88/LF)
Pricing an FDOT job? Upload your bid tab and compare every line with FDOT's published averages.
Benchmark a bid tabHow these figures are used: methodology. FDOT also posts a bid tabulation PDF for each letting.