Skip to content
BidTabulation.comDOT bid tabulations & unit-price intelligence
Menu

Device Server, Furnish & Install (Item 0684 2 1): FDOT Unit Price History

10 contracts · Nov 1, 2025 to Oct 31, 2026 · unit of measure EA

Weighted average (12 mo)
$1,423.64/EA
Contracts (12 mo)
10
Total quantity (12 mo)
64 EA
Total amount (12 mo)
$91,113

Source: FDOT Historical Item Average Cost report, statewide, fdot.gov, report run Nov 23, 2026, retrieved Nov 24, 2026. Figures as published by FDOT.

Weighted average by period

PeriodDatesContractsWeighted avgTotal quantityTotal amount
20242024-01-01 – 2024-12-3111$1,362.42107$145,779
20252025-01-01 – 2025-12-3119$1,375.97156$214,651
Latest 12 months2025-11-01 – 2026-10-3110$1,423.6464$91,113

By FDOT market area (latest 12 months)

Market areaContractsWeighted avgvs. statewideTotal quantity
072$1,860.00+30.7%13
082$941.02-33.9%4
101$1,400.00-1.7%1
125$1,342.80-5.7%46

FDOT Historical Item Average Cost reports by market area, Nov 1, 2025 to Oct 31, 2026. FDOT defines its 14 market areas; see the report page on fdot.gov.

Summary

FDOT pay item 0684 2 1 (Device Server, Furnish & Install) is measured in EA. In FDOT's Historical Item Average Cost report for Nov 1, 2025 to Oct 31, 2026, it appeared on 10 contracts with a quantity-weighted average of $1,423.64 per EA, on 64 EA worth $91,113 in total.

The same report run for earlier periods shows $1,362.42 in 2024 (11 contracts, 107 EA), $1,375.97 in 2025 (19 contracts, 156 EA), $1,423.64 in the latest 12 months (10 contracts, 64 EA). From 2024 to the latest 12 months the weighted average rose 4.5%.

Quantity let statewide shrank 40% over the same span, which can move a weighted average on its own because large contracts often carry lower unit prices.

In the same 12 months, 4 of FDOT's 14 market areas reported this item: area 07 at $1,860.00 (2 contracts), area 08 at $941.02 (2 contracts), area 10 at $1,400.00 (1 contract), area 12 at $1,342.80 (5 contracts).

FDOT weights its average on quantity at the contract level, so a single very large contract can pull the figure toward its price. The report does not publish quartiles or individual bids; FDOT's bid tabulation PDFs list every bidder's unit prices for a letting.

Other items in FDOT section 0684: 0684 1 1 Managed Field Ethernet Switch, Furnish & Install ($8,878.01 per EA, 64 contracts); 0684 8 1 Cellular Modem, Furnish AND Install ($3,545.08 per EA, 14 contracts); 0684 1 4 Managed Field Ethernet Switch, Relocate ($889.46 per EA, 8 contracts); 0684 5 1 Media Converter, Furnish & Install ($1,146.65 per EA, 6 contracts); 0684 7 1 Managed HUB Ethernet Switch, Furnish & Install ($8,698.79 per EA, 6 contracts).

Related items in section 0684

Pricing an FDOT job? Upload your bid tab and compare every line with FDOT's published averages.

Benchmark a bid tab

How these figures are used: methodology. FDOT also posts a bid tabulation PDF for each letting.