Grinding Concrete Pavement (Item 0352 70): FDOT Unit Price History

15 contracts · Nov 1, 2025 to Oct 31, 2026 · unit of measure SY

Weighted average (12 mo)
$5.61/SY
Contracts (12 mo)
15
Total quantity (12 mo)
171,036 SY
Total amount (12 mo)
$959,601

Source: FDOT Historical Item Average Cost report, statewide, fdot.gov, report run Nov 23, 2026, retrieved Nov 24, 2026. Figures as published by FDOT.

Weighted average by period

PeriodDatesContractsWeighted avgTotal quantityTotal amount
20242024-01-01 – 2024-12-3115$5.78640,415$3,704,361
20252025-01-01 – 2025-12-319$4.92945,336$4,647,667
Latest 12 months2025-11-01 – 2026-10-3115$5.61171,036$959,601

By FDOT market area (latest 12 months)

Market areaContractsWeighted avgvs. statewideTotal quantity
041$13.18+134.9%2,970
052$4.50-19.8%123,254
063$8.52+51.9%12,759
071$7.05+25.7%14,179
085$7.49+33.5%13,997
091$19.43+246.3%474
121$8.12+44.7%3,189
131$78.00+1,290.4%214

FDOT Historical Item Average Cost reports by market area, Nov 1, 2025 to Oct 31, 2026. FDOT defines its 14 market areas; see the report page on fdot.gov.

Summary

FDOT pay item 0352 70 (Grinding Concrete Pavement) is measured in SY. In FDOT's Historical Item Average Cost report for Nov 1, 2025 to Oct 31, 2026, it appeared on 15 contracts with a quantity-weighted average of $5.61 per SY, on 171,036 SY worth $959,601 in total.

The same report run for earlier periods shows $5.78 in 2024 (15 contracts, 640,415 SY), $4.92 in 2025 (9 contracts, 945,336 SY), $5.61 in the latest 12 months (15 contracts, 171,036 SY). Across those periods the weighted average stayed within three percent.

Quantity let statewide shrank 73% over the same span, which can move a weighted average on its own because large contracts often carry lower unit prices.

In the same 12 months, 8 of FDOT's 14 market areas reported this item: area 04 at $13.18 (1 contract), area 05 at $4.50 (2 contracts), area 06 at $8.52 (3 contracts), area 07 at $7.05 (1 contract), area 08 at $7.49 (5 contracts), area 09 at $19.43 (1 contract), area 12 at $8.12 (1 contract), area 13 at $78.00 (1 contract).

FDOT weights its average on quantity at the contract level, so a single very large contract can pull the figure toward its price. The report does not publish quartiles or individual bids; FDOT's bid tabulation PDFs list every bidder's unit prices for a letting.