Riprap, Sand-Cement Bags (Item 0530 1100): FDOT Unit Price History
20 contracts · Nov 1, 2025 to Oct 31, 2026 · unit of measure CY
- Weighted average (12 mo)
- $1,203.13/CY
- Contracts (12 mo)
- 20
- Total quantity (12 mo)
- 817 CY
- Total amount (12 mo)
- $982,958
Source: FDOT Historical Item Average Cost report, statewide, fdot.gov, report run Nov 23, 2026, retrieved Nov 24, 2026. Figures as published by FDOT.
Weighted average by period
| Period | Dates | Contracts | Weighted avg | Total quantity | Total amount |
|---|---|---|---|---|---|
| 2024 | 2024-01-01 – 2024-12-31 | 16 | $813.85 | 1,369.8 | $1,114,808 |
| 2025 | 2025-01-01 – 2025-12-31 | 15 | $801.22 | 974.7 | $780,947 |
| Latest 12 months | 2025-11-01 – 2026-10-31 | 20 | $1,203.13 | 817 | $982,958 |
By FDOT market area (latest 12 months)
| Market area | Contracts | Weighted avg | vs. statewide | Total quantity |
|---|---|---|---|---|
| 01 | 4 | $1,151.95 | -4.3% | 150.2 |
| 02 | 3 | $1,253.50 | +4.2% | 82.8 |
| 03 | 4 | $1,250.40 | +3.9% | 351.6 |
| 04 | 3 | $1,197.95 | -0.4% | 85.5 |
| 07 | 1 | $1,051.00 | -12.6% | 54.4 |
| 09 | 1 | $914.19 | -24% | 19.3 |
| 12 | 3 | $1,250.57 | +3.9% | 70.8 |
FDOT Historical Item Average Cost reports by market area, Nov 1, 2025 to Oct 31, 2026. FDOT defines its 14 market areas; see the report page on fdot.gov.
Summary
FDOT pay item 0530 1100 (Riprap, Sand-Cement Bags) is measured in CY. In FDOT's Historical Item Average Cost report for Nov 1, 2025 to Oct 31, 2026, it appeared on 20 contracts with a quantity-weighted average of $1,203.13 per CY, on 817 CY worth $982,958 in total.
The same report run for earlier periods shows $813.85 in 2024 (16 contracts, 1,369.8 CY), $801.22 in 2025 (15 contracts, 974.7 CY), $1,203.13 in the latest 12 months (20 contracts, 817 CY). From 2024 to the latest 12 months the weighted average rose 47.8%.
Quantity let statewide shrank 40% over the same span, which can move a weighted average on its own because large contracts often carry lower unit prices.
FDOT's market-area reports for the same 12 months show how location moves the price. Among the 5 market areas with at least three contracts, market area 01 had the lowest weighted average ($1,151.95 per CY, 4 contracts) and market area 02 the highest ($1,253.50, 3 contracts), 1.1 times as much. Market area 01 let the most contracts with this item (4). 7 of FDOT's 14 market areas reported the item in this window.
FDOT weights its average on quantity at the contract level, so a single very large contract can pull the figure toward its price. The report does not publish quartiles or individual bids; FDOT's bid tabulation PDFs list every bidder's unit prices for a letting.
Other items in FDOT section 0530: 0530 74 Bedding Stone ($127.87 per TN, 52 contracts); 0530 3 4 Riprap, Rubble, F&I, Ditch Lining ($126.76 per TN, 46 contracts); 0530 3 3 Riprap- Rubble, Bank AND Shore ($181.89 per TN, 24 contracts); 0530 4 6 Articulating Concrete Block Revetment System, Thickness 6" ($229.05 per SY, 3 contracts); 0530 3 5 Riprap- Rubble, Coastal Shore- Large Boulders ($150.09 per TN, 2 contracts).
Related items in section 0530
- 0530 74 · Bedding Stone ($127.87/TN)
- 0530 3 4 · Riprap, Rubble, F&I, Ditch Lining ($126.76/TN)
- 0530 3 3 · Riprap- Rubble, Bank AND Shore ($181.89/TN)
- 0530 4 6 · Articulating Concrete Block Revetment System, Thickness 6" ($229.05/SY)
- 0530 3 5 · Riprap- Rubble, Coastal Shore- Large Boulders ($150.09/TN)
- 0530 4 4 · Articulating Concrete Block Revetment System, Thickness 4" ($277.91/SY)
- 0530 5 12 · Gabion, Mattress 1 Foot AND Greater Thickness ($249.50/SY)