Thermoplastic, Remove Existing Thermoplastic Pavement Markings- Surface TO Remain (Item 0711 17 1): FDOT Unit Price History

64 contracts · Nov 1, 2025 to Oct 31, 2026 · unit of measure SF

Weighted average (12 mo)
$3.96/SF
Contracts (12 mo)
64
Total quantity (12 mo)
52,951 SF
Total amount (12 mo)
$209,815

Source: FDOT Historical Item Average Cost report, statewide, fdot.gov, report run Nov 23, 2026, retrieved Nov 24, 2026. Figures as published by FDOT.

Weighted average by period

PeriodDatesContractsWeighted avgTotal quantityTotal amount
20242024-01-01 – 2024-12-3176$3.29139,826$460,336
20252025-01-01 – 2025-12-3174$2.91170,310$495,296
Latest 12 months2025-11-01 – 2026-10-3164$3.9652,951$209,815

By FDOT market area (latest 12 months)

Market areaContractsWeighted avgvs. statewideTotal quantity
014$5.31+34.1%5,377
024$1.73-56.3%1,647
037$5.19+31.1%1,928
043$1.92-51.5%4,524
0510$3.30-16.7%11,728
065$4.03+1.8%2,168
075$23.41+491.2%537
0814$3.17-19.9%20,514
092$14.58+268.2%295
103$10.11+155.3%578
124$6.71+69.4%2,511
133$6.75+70.5%1,144

FDOT Historical Item Average Cost reports by market area, Nov 1, 2025 to Oct 31, 2026. FDOT defines its 14 market areas; see the report page on fdot.gov.

Summary

FDOT pay item 0711 17 1 (Thermoplastic, Remove Existing Thermoplastic Pavement Markings- Surface TO Remain) is measured in SF. In FDOT's Historical Item Average Cost report for Nov 1, 2025 to Oct 31, 2026, it appeared on 64 contracts with a quantity-weighted average of $3.96 per SF, on 52,951 SF worth $209,815 in total.

The same report run for earlier periods shows $3.29 in 2024 (76 contracts, 139,826 SF), $2.91 in 2025 (74 contracts, 170,310 SF), $3.96 in the latest 12 months (64 contracts, 52,951 SF). From 2024 to the latest 12 months the weighted average rose 20.4%.

Quantity let statewide shrank 62% over the same span, which can move a weighted average on its own because large contracts often carry lower unit prices.

FDOT's market-area reports for the same 12 months show how location moves the price. Among the 11 market areas with at least three contracts, market area 02 had the lowest weighted average ($1.73 per SF, 4 contracts) and market area 07 the highest ($23.41, 5 contracts), 13.5 times as much. Market area 08 let the most contracts with this item (14). 12 of FDOT's 14 market areas reported the item in this window.

FDOT weights its average on quantity at the contract level, so a single very large contract can pull the figure toward its price. The report does not publish quartiles or individual bids; FDOT's bid tabulation PDFs list every bidder's unit prices for a letting.

Other items in FDOT section 0711: 0711 16201 Thermoplastic, Standard-Other Surfaces, Yellow, Solid, 6" ($5,264.57 per GM, 204 contracts); 0711 16101 Thermoplastic, Standard-Other Surfaces, White, Solid, 6" ($5,320.58 per GM, 202 contracts); 0711 11125 Thermoplastic, Standard, White, Solid, 24" FOR Stop Line AND Crosswalk ($7.00 per LF, 188 contracts); 0711 11170 Thermoplastic, Standard, White, Arrow ($86.63 per EA, 181 contracts); 0711 11124 Thermoplastic, Standard, White, Solid, 18" FOR Diagonals AND Chevrons ($5.52 per LF, 165 contracts).

Related items in section 0711

Pricing an FDOT job? Upload your bid tab and compare every line with FDOT's published averages.

Benchmark a bid tab

How these figures are used: methodology. FDOT also posts a bid tabulation PDF for each letting.