Light Pole Complete, F&I, Standard Pole Standard Foundation, 40' Mounting Height, 12' ARM Length (Item 0715 61342): FDOT Unit Price History

12 contracts · Nov 1, 2025 to Oct 31, 2026 · unit of measure EA

Weighted average (12 mo)
$8,561.80/EA
Contracts (12 mo)
12
Total quantity (12 mo)
137 EA
Total amount (12 mo)
$1,172,966

Source: FDOT Historical Item Average Cost report, statewide, fdot.gov, report run Nov 23, 2026, retrieved Nov 24, 2026. Figures as published by FDOT.

Weighted average by period

PeriodDatesContractsWeighted avgTotal quantityTotal amount
20242024-01-01 – 2024-12-3113$10,352.37238$2,463,865
20252025-01-01 – 2025-12-3114$9,578.00149$1,427,121
Latest 12 months2025-11-01 – 2026-10-3112$8,561.80137$1,172,966

By FDOT market area (latest 12 months)

Market areaContractsWeighted avgvs. statewideTotal quantity
051$9,750.00+13.9%1
072$10,077.61+17.7%8
082$8,115.54-5.2%103
101$11,464.26+33.9%1
111$10,742.00+25.5%1
122$10,387.03+21.3%15

FDOT Historical Item Average Cost reports by market area, Nov 1, 2025 to Oct 31, 2026. FDOT defines its 14 market areas; see the report page on fdot.gov.

Summary

FDOT pay item 0715 61342 (Light Pole Complete, F&I, Standard Pole Standard Foundation, 40' Mounting Height, 12' ARM Length) is measured in EA. In FDOT's Historical Item Average Cost report for Nov 1, 2025 to Oct 31, 2026, it appeared on 12 contracts with a quantity-weighted average of $8,561.80 per EA, on 137 EA worth $1,172,966 in total.

The same report run for earlier periods shows $10,352.37 in 2024 (13 contracts, 238 EA), $9,578.00 in 2025 (14 contracts, 149 EA), $8,561.80 in the latest 12 months (12 contracts, 137 EA). From 2024 to the latest 12 months the weighted average fell 17.3%.

Quantity let statewide shrank 42% over the same span, which can move a weighted average on its own because large contracts often carry lower unit prices.

In the same 12 months, 6 of FDOT's 14 market areas reported this item: area 05 at $9,750.00 (1 contract), area 07 at $10,077.61 (2 contracts), area 08 at $8,115.54 (2 contracts), area 10 at $11,464.26 (1 contract), area 11 at $10,742.00 (1 contract), area 12 at $10,387.03 (2 contracts).

FDOT weights its average on quantity at the contract level, so a single very large contract can pull the figure toward its price. The report does not publish quartiles or individual bids; FDOT's bid tabulation PDFs list every bidder's unit prices for a letting.

Other items in FDOT section 0715: 0715 1 12 Lighting Conductors, F&I, Insulated, NO.8 - 6 ($2.53 per LF, 79 contracts); 0715 1 60 Lighting Conductors, Remove & Dispose, Contractor Owns ($0.540 per LF, 53 contracts); 0715 69000 Light Pole Complete, Remove Pole AND Foundation ($835.22 per EA, 46 contracts); 0715 7 11 Load Center, F&I, Secondary Voltage ($20,487.97 per EA, 45 contracts); 0715 1 13 Lighting Conductors, F&I, Insulated, NO 4 TO NO 2 ($3.93 per LF, 40 contracts).

Related items in section 0715

Pricing an FDOT job? Upload your bid tab and compare every line with FDOT's published averages.

Benchmark a bid tab

How these figures are used: methodology. FDOT also posts a bid tabulation PDF for each letting.