Raised Pavement Marker, Type B (Item 0706 1 3): FDOT Unit Price History

231 contracts · Nov 1, 2025 to Oct 31, 2026 · unit of measure EA

Weighted average (12 mo)
$4.89/EA
Contracts (12 mo)
231
Total quantity (12 mo)
924,530 EA
Total amount (12 mo)
$4,518,527

Source: FDOT Historical Item Average Cost report, statewide, fdot.gov, report run Nov 23, 2026, retrieved Nov 24, 2026. Figures as published by FDOT.

Weighted average by period

PeriodDatesContractsWeighted avgTotal quantityTotal amount
20242024-01-01 – 2024-12-31296$4.991,449,052$7,230,075
20252025-01-01 – 2025-12-31276$4.851,332,095$6,466,970
Latest 12 months2025-11-01 – 2026-10-31231$4.89924,530$4,518,527

By FDOT market area (latest 12 months)

Market areaContractsWeighted avgvs. statewideTotal quantity
0117$5.23+7%68,319
0213$5.37+9.8%38,001
0313$5.24+7.2%57,480
0415$5.66+15.7%97,418
0520$4.65-4.9%81,828
0617$5.05+3.3%63,029
0721$4.36-10.8%86,708
0851$4.54-7.2%174,050
096$4.41-9.8%16,472
1015$4.64-5.1%57,841
114$5.72+17%24,390
1222$4.78-2.2%134,940
1315$4.71-3.7%22,933
141$4.00-18.2%1,054

FDOT Historical Item Average Cost reports by market area, Nov 1, 2025 to Oct 31, 2026. FDOT defines its 14 market areas; see the report page on fdot.gov.

Summary

FDOT pay item 0706 1 3 (Raised Pavement Marker, Type B) is measured in EA. In FDOT's Historical Item Average Cost report for Nov 1, 2025 to Oct 31, 2026, it appeared on 231 contracts with a quantity-weighted average of $4.89 per EA, on 924,530 EA worth $4,518,527 in total.

The same report run for earlier periods shows $4.99 in 2024 (296 contracts, 1,449,052 EA), $4.85 in 2025 (276 contracts, 1,332,095 EA), $4.89 in the latest 12 months (231 contracts, 924,530 EA). Across those periods the weighted average stayed within three percent.

Quantity let statewide shrank 36% over the same span, which can move a weighted average on its own because large contracts often carry lower unit prices.

FDOT's market-area reports for the same 12 months show how location moves the price. Among the 13 market areas with at least three contracts, market area 07 had the lowest weighted average ($4.36 per EA, 21 contracts) and market area 11 the highest ($5.72, 4 contracts), 1.3 times as much. Market area 08 let the most contracts with this item (51). 14 of FDOT's 14 market areas reported the item in this window.

FDOT weights its average on quantity at the contract level, so a single very large contract can pull the figure toward its price. The report does not publish quartiles or individual bids; FDOT's bid tabulation PDFs list every bidder's unit prices for a letting.

Other items in FDOT section 0706: 0706 1110 Raised Pavement Marker, Type F Internally Illuminated ($354.37 per EA, 2 contracts).

Related items in section 0706

Pricing an FDOT job? Upload your bid tab and compare every line with FDOT's published averages.

Benchmark a bid tab