Skip to content
BidTabulation.comDOT bid tabulations & unit-price intelligence
Menu

Talbert Companies LLC: TxDOT Bid Results and Margins

Name as published by TxDOT: TALBERT COMPANIES LLC · Data as published by TxDOT, lettings Jan 7, 2025 to Mar 5, 2026, retrieved Nov 24, 2026.

Proposals bid
40
Low bids (rank 1)
1
Win rate
2.5%
Low-bid value
$1.4M
Money left on table
$11K
Avg. bid vs. estimate
+0.39%

From Jan 7, 2025 to Mar 5, 2026, Talbert Companies LLC submitted 40 bids on TxDOT proposals and was the apparent low bidder on 1 of them (2.5%), with low bids totalling $1,387,935. In 1 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $10,633 (0.77% of those bids); the median gap was 0.77%. On average its bids came in 0.39% above TxDOT's engineer's estimate. Its most frequent district was Paris (7 bids).

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

By year

YearBidsLow bidsWin rateLow-bid value
20253313.0%$1,387,935
2026700.0%$0

Head-to-head rivals

BidderProposals togetherRanked ahead
Hodges and Son Construction Company, Inc.2310 of 23
Stx Civil235 of 23
Skyline Bridge LLC175 of 17
Grey Sky Construction LLC1111 of 11
Thk Construction LLC113 of 11
C. E. Barker, Ltd.107 of 10
Texas Steel Industrial Placing, LLC106 of 10
Ti-Zack Concrete, LLC104 of 10

Districts and work types

DistrictBids
Paris7
Dallas4
Yoakum4
Fort Worth3
Lufkin3
Work type of low bidsLow bids
Bridge Replacement1

Closest second-place finishes

Let dateProposalCountyLow bidderLow bidThis bidvs. low bid
2025-01-080911-00-152AngelinaIsi Contracting, Inc.$938,603$947,027+0.9%
2025-07-020982-05-011ThrockmortonC & W Southern LLC$728,607$737,258+1.2%
2025-02-070045-12-096Red RiverAad Contracting Inc.$1,486,446$1,506,755+1.4%
2025-06-050925-10-037DonleySkyline Bridge LLC$954,735$967,864+1.4%
2025-05-010092-13-031NavarroPmco Construction LLC$3,850,000$3,981,746+3.4%

Recent bids

Let dateProposalCountyWork typeRankBid totalvs. low bidvs. estimate
2026-03-050901-19-229GraysonPedestrian, Sidewalks & Curb Ramps8 of 11$3,159,690+15.1%+6.5%
2026-03-051097-01-018HuntBridge Replacement7 of 12$2,467,312+18.3%-9.4%
2026-02-050912-34-213Fort BendBridge Replacement7 of 9$2,378,260+30.8%-4.2%
2026-02-050918-18-142NavarroBridge Replacement9 of 15$1,558,328+27.3%+1.2%
2026-02-040901-00-067LamarPedestrian, Sidewalks & Curb Ramps9 of 13$864,900+18.9%-3.7%
2026-02-040912-34-207Fort BendBridge Replacement7 of 13$3,372,646+21%-0.9%
2026-01-070527-03-025AustinBridge Replacement10 of 11$1,270,910+35.7%-91.7%
2025-09-050574-02-022NavarroBridge Replacement6 of 8$11,932,161+23.7%+13.8%
2025-08-080914-05-203WilliamsonBridge Replacement11 of 11$2,519,156+58.9%+24.5%
2025-08-070901-22-130HuntPedestrian, Sidewalks & Curb Ramps2 of 12$530,539+10.1%-2.2%
2025-08-070911-39-074ShelbyBridge Replacement3 of 8$1,854,462+13.8%-14.3%
2025-07-020907-26-005SchleicherBridge Replacement1 of 8$1,387,935—-16.7%

Report an error. Wrong company merged, a name change, or a figure that does not match TxDOT's file? Email bidtabulation@apps.adeptaoperations.com. We respond within five business days. See how corrections work.

Compare your own unit prices with TxDOT history: benchmark a bid tab.