Name as published by TxDOT: STX CIVIL · Data as published by TxDOT, lettings Nov 6, 2024 to Nov 4, 2026, retrieved Nov 24, 2026.

Proposals bid
192
Low bids (rank 1)
25
Win rate
13.02%
Low-bid value
$69.6M
Money left on table
$4.1M
Avg. bid vs. estimate
+3.13%

From Nov 6, 2024 to Nov 4, 2026, Stx Civil submitted 192 bids on TxDOT proposals and was the apparent low bidder on 25 of them (13.02%), with low bids totalling $69,578,664. In 25 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $4,089,265 (5.88% of those bids); the median gap was 5.75%. On average its bids came in 3.13% above TxDOT's engineer's estimate. Its most frequent district was Yoakum (45 bids).

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

By year

YearBidsLow bidsWin rateLow-bid value
20241300.0%$0
2025991515.2%$30,228,815
2026801012.5%$39,349,849

Head-to-head rivals

BidderProposals togetherRanked ahead
E-Z Bel Construction, LLC5935 of 59
Garret Shields Infrastructure4517 of 45
Ti-Zack Concrete, LLC4422 of 44
Texas Steel Industrial Placing, LLC4222 of 42
C. E. Barker, Ltd.4137 of 41
Hodges and Son Construction Company, Inc.4027 of 40
Hunter Industries, Ltd.3916 of 39
Ck Newberry, LLC3220 of 32

Districts and work types

DistrictBids
Yoakum45
San Antonio17
Corpus Christi16
Austin11
Bryan10
Work type of low bidsLow bids
Bridge Replacement12
Safety Improvement Projects5
Pedestrian, Sidewalks & Curb Ramps4
Rehabilitation of Existing Road2
Routine Maintenance Project - Sealed1
Texas Park and Wildlife1

Closest second-place finishes

Let dateProposalCountyLow bidderLow bidThis bidvs. low bid
2025-10-080913-21-056MatagordaE-Z Bel Construction, LLC$4,866,603$4,876,748+0.2%
2025-06-040909-29-047HamiltonCoppell Construction Co., Inc.$4,196,407$4,206,593+0.2%
2025-06-050913-09-132WhartonTi-Zack Concrete, LLC$2,130,273$2,142,704+0.6%
2026-03-050901-19-229GraysonScout 5 Construction LLC$2,744,602$2,763,804+0.7%
2025-11-060909-36-201BellGarret Shields Infrastructure$2,132,111$2,149,742+0.8%

Recent bids

Let dateProposalCountyWork typeRankBid totalvs. low bidvs. estimate
2026-11-040285-03-066HaysPedestrian, Sidewalks & Curb Ramps2 of 9$1,083,834+14%+15.4%
2026-11-040922-33-234WebbBridge Replacement1 of 7$2,866,785—+11.9%
2026-11-041052-02-098NuecesSafety Improvement Projects4 of 5$4,817,402+25.7%+0.5%
2026-11-030917-30-068BurlesonBridge Replacement10 of 15$867,320+20.2%+21.8%
2026-10-070017-13-013AtascosaSeal Coat3 of 3$11,534,999+5.9%+6.3%
2026-10-070922-20-030La SalleBridge Replacement3 of 6$608,304+25.4%-9.1%
2026-10-076507-19-001MedinaRoutine Maintenance Project - Sealed3 of 3$3,044,316+5.8%+16.6%
2026-10-060024-02-081UvaldeSeal Coat2 of 4$10,150,000+18.1%+25.2%
2026-10-060086-11-054Jim WellsSeal Coat4 of 4$12,976,030+11.3%+2.3%
2026-10-060912-34-209Fort BendBridge Replacement5 of 9$2,195,624+11.8%+3.2%
2026-09-030143-10-058VictoriaPedestrian, Sidewalks & Curb Ramps4 of 7$6,193,896+15.8%-5.5%
2026-09-030573-02-008CaldwellIntersection & Operational Imprv7 of 8$7,061,719+38.2%+30%

Report an error. Wrong company merged, a name change, or a figure that does not match TxDOT's file? Email bidtabulation@apps.adeptaoperations.com. We respond within five business days. See how corrections work.