Skip to content
BidTabulation.comDOT bid tabulations & unit-price intelligence
Menu

Scout 5 Construction LLC: TxDOT Bid Results and Margins

Name as published by TxDOT: SCOUT 5 CONSTRUCTION LLC · Data as published by TxDOT, lettings Nov 20, 2024 to Sep 10, 2026, retrieved Nov 24, 2026.

Proposals bid
79
Low bids (rank 1)
29
Win rate
36.71%
Low-bid value
$27.9M
Money left on table
$5.2M
Avg. bid vs. estimate
-1.22%

From Nov 20, 2024 to Sep 10, 2026, Scout 5 Construction LLC submitted 79 bids on TxDOT proposals and was the apparent low bidder on 29 of them (36.71%), with low bids totalling $27,864,808. In 29 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $5,233,517 (18.78% of those bids); the median gap was 10.82%. On average its bids came in 1.22% below TxDOT's engineer's estimate. Its most frequent district was Paris (13 bids).

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

By year

YearBidsLow bidsWin rateLow-bid value
202422100.0%$345,969
2025491632.7%$21,466,856
2026281139.3%$6,051,983

Head-to-head rivals

BidderProposals togetherRanked ahead
Garret Shields Infrastructure2717 of 27
D & M Contractors, LLC2218 of 22
Greenpak Solutions, Limited Liability Company1914 of 19
Scr Civil Construction, LLC1813 of 18
Crackseal of Texas, LLC1715 of 17
Fyl Enterprises, LLC1514 of 15
Highway 19 Construction LLC159 of 15
Icos Management, LLC148 of 14

Districts and work types

DistrictBids
Paris13
Tyler10
Dallas9
Lufkin7
Brownwood5
Work type of low bidsLow bids
Routine Maintenance Project - Sealed10
Routine Maintenance Project7
Pedestrian, Sidewalks & Curb Ramps4
Safety Improvement Projects3
Bridge Replacement2
Bridge Maintenance1

Closest second-place finishes

Let dateProposalCountyLow bidderLow bidThis bidvs. low bid
2026-08-116504-95-001EctorGreenpak Solutions, Limited Liability Company$484,960$487,510+0.5%
2026-03-186490-77-001UpshurKjrm General Contractors, LLC$52,820$53,300+0.9%
2025-07-096471-92-001CollinRoad Doctors LLC$199,431$201,686+1.1%
2025-06-040910-36-137CherokeeRhino Equity, LLC$139,946$145,910+4.3%
2025-05-010101-03-127San PatricioMassana Construction Inc.$584,654$625,228+6.9%

Recent bids

Let dateProposalCountyWork typeRankBid totalvs. low bidvs. estimate
2026-09-106501-04-001KimbleBridge Preventative Maintenance5 of 10$567,331+26.1%+6.3%
2026-09-030101-01-070BeeSafety Improvement Projects4 of 5$2,189,391+17.3%+48.8%
2026-08-126499-99-001KaufmanRoutine Maintenance Project - Sealed1 of 5$203,416—-14.5%
2026-08-126500-43-001NavarroRoutine Maintenance Project - Sealed1 of 5$258,716—-7.5%
2026-08-126501-41-001EllisRoutine Maintenance Project1 of 6$230,014—-11.4%
2026-08-126503-32-001DallasRoutine Maintenance Project3 of 7$473,251+44.4%+28.3%
2026-08-116494-85-001EastlandRoutine Maintenance Project1 of 4$555,420—-21.4%
2026-08-116501-29-001GreggBridge Preventative Maintenance - Sealed2 of 13$207,131+55.6%-19.6%
2026-08-116501-71-001SmithBridge Preventative Maintenance - Sealed5 of 11$210,641+26%+3.2%
2026-08-116502-66-001WoodRoutine Maintenance Project1 of 6$309,487—-17.9%
2026-08-116502-69-001SmithRoutine Maintenance Project4 of 6$920,525+55.5%+45.5%
2026-08-116504-95-001EctorRoutine Maintenance Project - Sealed2 of 5$487,510+0.5%-4.1%

Report an error. Wrong company merged, a name change, or a figure that does not match TxDOT's file? Email bidtabulation@apps.adeptaoperations.com. We respond within five business days. See how corrections work.

Compare your own unit prices with TxDOT history: benchmark a bid tab.