Rise Up Construction LLC: TxDOT Bid Results and Margins
Name as published by TxDOT: RISE UP CONSTRUCTION LLC · Data as published by TxDOT, lettings Nov 6, 2024 to Jan 6, 2026, retrieved Nov 24, 2026.
Proposals bid
16
Low bids (rank 1)
2
Win rate
12.5%
Low-bid value
$2.3M
Money left on table
$420K
Avg. bid vs. estimate
+35.14%
From Nov 6, 2024 to Jan 6, 2026, Rise Up Construction LLC submitted 16 bids on TxDOT proposals and was the apparent low bidder on 2 of them (12.5%), with low bids totalling $2,346,262. In 2 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $419,797 (17.89% of those bids); the median gap was 4.26%. On average its bids came in 35.14% above TxDOT's engineer's estimate. Its most frequent district was Dallas (5 bids).
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.