Red Baron Building Company, LLC: TxDOT Bid Results and Margins
Name as published by TxDOT: RED BARON BUILDING COMPANY, LLC · Data as published by TxDOT, lettings Nov 7, 2024 to Apr 8, 2026, retrieved Nov 24, 2026.
- Proposals bid
- 9
- Low bids (rank 1)
- 3
- Win rate
- 33.33%
- Low-bid value
- $505K
- Money left on table
- $170K
- Avg. bid vs. estimate
- +4.44%
From Nov 7, 2024 to Apr 8, 2026, Red Baron Building Company, LLC submitted 9 bids on TxDOT proposals and was the apparent low bidder on 3 of them (33.33%), with low bids totalling $505,462. In 3 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $170,146 (33.66% of those bids); the median gap was 41.92%. On average its bids came in 4.44% above TxDOT's engineer's estimate. Its most frequent district was Tyler (9 bids).
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.
By year
| Year | Bids | Low bids | Win rate | Low-bid value |
|---|---|---|---|---|
| 2024 | 1 | 0 | 0.0% | $0 |
| 2025 | 6 | 3 | 50.0% | $505,462 |
| 2026 | 2 | 0 | 0.0% | $0 |
Head-to-head rivals
| Bidder | Proposals together | Ranked ahead |
|---|---|---|
| Cross Plus Construction, LLC | 4 | 3 of 4 |
| Garret Shields Infrastructure | 4 | 1 of 4 |
| Icos Management, LLC | 4 | 3 of 4 |
| Premier Contractors LLC | 4 | 2 of 4 |
| Structural Integrity Group LLC | 4 | 4 of 4 |
| O. Trevino Construction, LLC | 3 | 2 of 3 |
| Thk Construction LLC | 3 | 0 of 3 |
| Aad Contracting Inc. | 2 | 2 of 2 |
Districts and work types
| District | Bids |
|---|---|
| Tyler | 9 |
| Work type of low bids | Low bids |
|---|---|
| Bridge Preventative Maintenance - Sealed | 2 |
| Routine Maintenance Project - Sealed | 1 |
Recent bids
| Let date | Proposal | County | Work type | Rank | Bid total | vs. low bid | vs. estimate |
|---|---|---|---|---|---|---|---|
| 2026-04-08 | 1790-02-048 | Smith | Bridge Replacement | 9 of 9 | $2,341,953 | +54.5% | +43.7% |
| 2026-03-05 | 0910-00-141 | Smith | Pedestrian, Sidewalks & Curb Ramps | 7 of 14 | $1,223,662 | +17.8% | -2.6% |
| 2025-12-09 | 6493-00-001 | Smith | Bridge Preventative Maintenance - Sealed | 3 of 8 | $627,999 | +42.7% | -2.9% |
| 2025-11-12 | 6487-20-001 | Wood | Bridge Preventative Maintenance - Sealed | 1 of 7 | $143,287 | — | -6.2% |
| 2025-10-21 | 6485-91-001 | Anderson | Bridge Preventative Maintenance - Sealed | 4 of 7 | $374,964 | +16.4% | -4.8% |
| 2025-10-21 | 6487-24-001 | Cherokee | Bridge Preventative Maintenance - Sealed | 1 of 6 | $194,460 | — | -37.6% |
| 2025-08-12 | 6485-74-001 | Gregg | Bridge Preventative Maintenance - Sealed | 6 of 8 | $584,870 | +74.9% | +35.7% |
| 2025-03-11 | 6469-19-001 | Van Zandt | Routine Maintenance Project - Sealed | 1 of 4 | $167,715 | — | -2.8% |
| 2024-11-07 | 0910-00-142 | Smith | Bridge Maintenance | 10 of 10 | $5,329,150 | +71.4% | +17.5% |
Report an error. Wrong company merged, a name change, or a figure that does not match TxDOT's file? Email bidtabulation@apps.adeptaoperations.com. We respond within five business days. See how corrections work.
Compare your own unit prices with TxDOT history: benchmark a bid tab.