Red Baron Building Company, LLC: TxDOT Bid Results and Margins

Name as published by TxDOT: RED BARON BUILDING COMPANY, LLC · Data as published by TxDOT, lettings Nov 7, 2024 to Apr 8, 2026, retrieved Nov 24, 2026.

Proposals bid
9
Low bids (rank 1)
3
Win rate
33.33%
Low-bid value
$505K
Money left on table
$170K
Avg. bid vs. estimate
+4.44%

From Nov 7, 2024 to Apr 8, 2026, Red Baron Building Company, LLC submitted 9 bids on TxDOT proposals and was the apparent low bidder on 3 of them (33.33%), with low bids totalling $505,462. In 3 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $170,146 (33.66% of those bids); the median gap was 41.92%. On average its bids came in 4.44% above TxDOT's engineer's estimate. Its most frequent district was Tyler (9 bids).

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

By year

YearBidsLow bidsWin rateLow-bid value
2024100.0%$0
20256350.0%$505,462
2026200.0%$0

Head-to-head rivals

BidderProposals togetherRanked ahead
Cross Plus Construction, LLC43 of 4
Garret Shields Infrastructure41 of 4
Icos Management, LLC43 of 4
Premier Contractors LLC42 of 4
Structural Integrity Group LLC44 of 4
O. Trevino Construction, LLC32 of 3
Thk Construction LLC30 of 3
Aad Contracting Inc.22 of 2

Districts and work types

DistrictBids
Tyler9
Work type of low bidsLow bids
Bridge Preventative Maintenance - Sealed2
Routine Maintenance Project - Sealed1

Recent bids

Let dateProposalCountyWork typeRankBid totalvs. low bidvs. estimate
2026-04-081790-02-048SmithBridge Replacement9 of 9$2,341,953+54.5%+43.7%
2026-03-050910-00-141SmithPedestrian, Sidewalks & Curb Ramps7 of 14$1,223,662+17.8%-2.6%
2025-12-096493-00-001SmithBridge Preventative Maintenance - Sealed3 of 8$627,999+42.7%-2.9%
2025-11-126487-20-001WoodBridge Preventative Maintenance - Sealed1 of 7$143,287—-6.2%
2025-10-216485-91-001AndersonBridge Preventative Maintenance - Sealed4 of 7$374,964+16.4%-4.8%
2025-10-216487-24-001CherokeeBridge Preventative Maintenance - Sealed1 of 6$194,460—-37.6%
2025-08-126485-74-001GreggBridge Preventative Maintenance - Sealed6 of 8$584,870+74.9%+35.7%
2025-03-116469-19-001Van ZandtRoutine Maintenance Project - Sealed1 of 4$167,715—-2.8%
2024-11-070910-00-142SmithBridge Maintenance10 of 10$5,329,150+71.4%+17.5%

Report an error. Wrong company merged, a name change, or a figure that does not match TxDOT's file? Email bidtabulation@apps.adeptaoperations.com. We respond within five business days. See how corrections work.