Skip to content
BidTabulation.comDOT bid tabulations & unit-price intelligence
Menu

Mbn Enterprises LLC: TxDOT Bid Results and Margins

Name as published by TxDOT: MBN ENTERPRISES LLC · Data as published by TxDOT, lettings Dec 4, 2024 to Sep 3, 2026, retrieved Nov 24, 2026.

Proposals bid
18
Low bids (rank 1)
2
Win rate
11.11%
Low-bid value
$8.2M
Money left on table
$487K
Avg. bid vs. estimate
+1.47%

From Dec 4, 2024 to Sep 3, 2026, Mbn Enterprises LLC submitted 18 bids on TxDOT proposals and was the apparent low bidder on 2 of them (11.11%), with low bids totalling $8,203,847. In 2 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $487,476 (5.94% of those bids); the median gap was 5.53%. On average its bids came in 1.47% above TxDOT's engineer's estimate. Its most frequent district was Houston (12 bids).

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

By year

YearBidsLow bidsWin rateLow-bid value
2024100.0%$0
20251100.0%$0
20266233.3%$8,203,847

Head-to-head rivals

BidderProposals togetherRanked ahead
Mc2 Civil, LLC74 of 7
Isi Contracting, Inc.63 of 6
Garret Shields Infrastructure53 of 5
Grey Sky Construction LLC55 of 5
Hunter Industries, Ltd.51 of 5
Ragle Construction, Inc.54 of 5
Ti-Zack Concrete, LLC54 of 5
Environmental Allies, Inc.42 of 4

Districts and work types

DistrictBids
Houston12
Yoakum4
Corpus Christi1
Lufkin1
Work type of low bidsLow bids
Bridge Maintenance1
Overlay1

Closest second-place finishes

Let dateProposalCountyLow bidderLow bidThis bidvs. low bid
2026-03-043256-01-122HarrisForde Construction Company, Inc.$2,049,391$2,051,247+0.1%
2025-07-010912-00-663HarrisHighway 19 Construction LLC$948,028$949,545+0.2%
2025-06-050912-72-748HarrisIsi Contracting, Inc.$1,851,563$1,860,650+0.5%
2025-08-070051-03-124GalvestonSer Construction Partners, LLC$1,983,177$2,058,610+3.8%

Recent bids

Let dateProposalCountyWork typeRankBid totalvs. low bidvs. estimate
2026-09-030051-09-127GalvestonPedestrian, Sidewalks & Curb Ramps3 of 7$2,293,251+9.9%+5.2%
2026-08-060500-03-664HarrisOverlay1 of 5$5,092,365—+13.1%
2026-07-013510-04-066Fort BendNew Location Non-Freeway8 of 11$22,652,903+16.1%+12.6%
2026-03-043256-01-122HarrisPedestrian, Sidewalks & Curb Ramps2 of 9$2,051,247+0.1%-45.7%
2026-01-060178-02-090BrazoriaOverlay4 of 4$10,596,420+20.8%+18.2%
2026-01-060271-16-153HarrisBridge Maintenance1 of 7$3,111,482—-3.9%
2025-12-030265-14-018FayettePedestrian, Sidewalks & Curb Ramps4 of 12$4,358,949+8.2%-13.3%
2025-12-020089-05-047JacksonOverlay3 of 3$13,077,202+43.2%+47.7%
2025-12-020408-05-032AustinRestoration5 of 7$12,677,852+18%+18.4%
2025-10-083510-05-050HarrisNew Location Non-Freeway9 of 10$10,021,013+53.1%+14.8%
2025-08-080395-02-049San JacintoPedestrian, Sidewalks & Curb Ramps4 of 11$1,557,578+15.3%-9%
2025-08-070051-03-124GalvestonBicycle Infrastructure Improvements2 of 10$2,058,610+3.8%-48.9%

Report an error. Wrong company merged, a name change, or a figure that does not match TxDOT's file? Email bidtabulation@apps.adeptaoperations.com. We respond within five business days. See how corrections work.

Compare your own unit prices with TxDOT history: benchmark a bid tab.