Name as published by TxDOT: JOHN REED AND COMPANY, LLC · Data as published by TxDOT, lettings Feb 6, 2025 to Oct 6, 2026, retrieved Nov 24, 2026.

Proposals bid
10
Low bids (rank 1)
1
Win rate
10%
Low-bid value
$2.8M
Money left on table
$53K
Avg. bid vs. estimate
+6.92%

From Feb 6, 2025 to Oct 6, 2026, John Reed and Company, LLC submitted 10 bids on TxDOT proposals and was the apparent low bidder on 1 of them (10%), with low bids totalling $2,789,318. In 1 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $52,910 (1.9% of those bids); the median gap was 1.9%. On average its bids came in 6.92% above TxDOT's engineer's estimate. Its most frequent district was Yoakum (5 bids).

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

By year

YearBidsLow bidsWin rateLow-bid value
20254125.0%$2,789,318
2026600.0%$0

Head-to-head rivals

BidderProposals togetherRanked ahead
R Construction Civil, LLC72 of 7
Forde Construction Company, Inc.63 of 6
C. E. Barker, Ltd.54 of 5
E-Z Bel Construction, LLC53 of 5
Isi Contracting, Inc.53 of 5
Stx Civil53 of 5
Trevway, Inc.52 of 5
Castillo Aranda LLC42 of 4

Districts and work types

DistrictBids
Yoakum5
Houston4
Lufkin1
Work type of low bidsLow bids
Bridge Replacement1

Closest second-place finishes

Let dateProposalCountyLow bidderLow bidThis bidvs. low bid
2025-05-020403-01-050San JacintoSkyline Bridge LLC$4,304,421$4,346,368+1%
2026-10-060912-34-209Fort BendGarret Shields Infrastructure$1,963,405$2,067,046+5.3%
2025-02-060913-21-055MatagordaScout 5 Construction LLC$3,170,844$3,496,934+10.3%

Recent bids

Let dateProposalCountyWork typeRankBid totalvs. low bidvs. estimate
2026-10-060912-34-209Fort BendBridge Replacement2 of 9$2,067,046+5.3%-2.8%
2026-09-020913-09-134WhartonBridge Replacement7 of 12$3,040,317+13.6%+29.7%
2026-09-021911-01-023GalvestonBridge Replacement10 of 11$4,065,253+27%+20.4%
2026-02-050446-06-018AustinBridge Replacement8 of 12$6,231,866+25.1%-3.1%
2026-02-040912-34-207Fort BendBridge Replacement10 of 13$3,777,572+35.5%+11%
2026-01-071986-01-073MontgomeryCulvert & Storm Drainage Work10 of 12$3,072,360+38.4%+11.3%
2025-07-010913-09-127WhartonBridge Replacement1 of 7$2,789,318—-3.3%
2025-05-020403-01-050San JacintoBridge Replacement2 of 8$4,346,368+1%-2.3%
2025-03-040913-09-123WhartonBridge Replacement4 of 9$3,671,741+18.4%+15.6%
2025-02-060913-21-055MatagordaBridge Replacement2 of 9$3,496,934+10.3%-7.4%

Report an error. Wrong company merged, a name change, or a figure that does not match TxDOT's file? Email bidtabulation@apps.adeptaoperations.com. We respond within five business days. See how corrections work.