Westfield Insurance Company: TxDOT Bid Results and Margins

Name as published by TxDOT: Westfield Insurance Company · Data as published by TxDOT, lettings Mar 5, 2025 to Aug 8, 2025, retrieved Nov 24, 2026.

Proposals bid
6
Low bids (rank 1)
6
Win rate
100%
Low-bid value
$13.2M
Money left on table
$498K
Avg. bid vs. estimate
-9.03%

From Mar 5, 2025 to Aug 8, 2025, Westfield Insurance Company submitted 6 bids on TxDOT proposals and was the apparent low bidder on 6 of them (100%), with low bids totalling $13,238,161. In 6 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $498,173 (3.76% of those bids); the median gap was 4.83%. On average its bids came in 9.03% below TxDOT's engineer's estimate. Its most frequent district was Fort Worth (3 bids).

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

By year

YearBidsLow bidsWin rateLow-bid value
202566100.0%$13,238,161

Head-to-head rivals

BidderProposals togetherRanked ahead
Stx Civil55 of 5
Ed Bell Construction Company33 of 3
Hodges and Son Construction Company, Inc.33 of 3
Pmco Construction LLC33 of 3
Texas Steel Industrial Placing, LLC33 of 3
Coppell Construction Co., Inc.22 of 2
Grey Sky Construction LLC22 of 2
O. Trevino Construction, LLC22 of 2

Districts and work types

DistrictBids
Fort Worth3
Amarillo1
Brownwood1
Dallas1
Work type of low bidsLow bids
Bridge Replacement4
Pedestrian, Sidewalks & Curb Ramps2

Recent bids

Let dateProposalCountyWork typeRankBid totalvs. low bidvs. estimate
2025-08-080902-38-135ParkerBridge Replacement1 of 8$1,536,599—-13.5%
2025-08-080902-38-136ParkerBridge Replacement1 of 8$829,673—-11.8%
2025-07-020918-22-162EllisBridge Replacement1 of 10$2,531,308—-13.6%
2025-07-010923-00-088BrownPedestrian, Sidewalks & Curb Ramps1 of 9$1,364,489—-7.9%
2025-05-020379-01-050HutchinsonPedestrian, Sidewalks & Curb Ramps1 of 6$3,406,939—-6.8%
2025-03-051094-04-010JohnsonBridge Replacement1 of 3$3,569,154—-0.6%