Westfield Insurance Company: TxDOT Bid Results and Margins
Name as published by TxDOT: Westfield Insurance Company · Data as published by TxDOT, lettings Mar 5, 2025 to Aug 8, 2025, retrieved Nov 24, 2026.
- Proposals bid
- 6
- Low bids (rank 1)
- 6
- Win rate
- 100%
- Low-bid value
- $13.2M
- Money left on table
- $498K
- Avg. bid vs. estimate
- -9.03%
From Mar 5, 2025 to Aug 8, 2025, Westfield Insurance Company submitted 6 bids on TxDOT proposals and was the apparent low bidder on 6 of them (100%), with low bids totalling $13,238,161. In 6 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $498,173 (3.76% of those bids); the median gap was 4.83%. On average its bids came in 9.03% below TxDOT's engineer's estimate. Its most frequent district was Fort Worth (3 bids).
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.
By year
| Year | Bids | Low bids | Win rate | Low-bid value |
|---|---|---|---|---|
| 2025 | 6 | 6 | 100.0% | $13,238,161 |
Head-to-head rivals
| Bidder | Proposals together | Ranked ahead |
|---|---|---|
| Stx Civil | 5 | 5 of 5 |
| Ed Bell Construction Company | 3 | 3 of 3 |
| Hodges and Son Construction Company, Inc. | 3 | 3 of 3 |
| Pmco Construction LLC | 3 | 3 of 3 |
| Texas Steel Industrial Placing, LLC | 3 | 3 of 3 |
| Coppell Construction Co., Inc. | 2 | 2 of 2 |
| Grey Sky Construction LLC | 2 | 2 of 2 |
| O. Trevino Construction, LLC | 2 | 2 of 2 |
Districts and work types
| District | Bids |
|---|---|
| Fort Worth | 3 |
| Amarillo | 1 |
| Brownwood | 1 |
| Dallas | 1 |
| Work type of low bids | Low bids |
|---|---|
| Bridge Replacement | 4 |
| Pedestrian, Sidewalks & Curb Ramps | 2 |
Recent bids
| Let date | Proposal | County | Work type | Rank | Bid total | vs. low bid | vs. estimate |
|---|---|---|---|---|---|---|---|
| 2025-08-08 | 0902-38-135 | Parker | Bridge Replacement | 1 of 8 | $1,536,599 | — | -13.5% |
| 2025-08-08 | 0902-38-136 | Parker | Bridge Replacement | 1 of 8 | $829,673 | — | -11.8% |
| 2025-07-02 | 0918-22-162 | Ellis | Bridge Replacement | 1 of 10 | $2,531,308 | — | -13.6% |
| 2025-07-01 | 0923-00-088 | Brown | Pedestrian, Sidewalks & Curb Ramps | 1 of 9 | $1,364,489 | — | -7.9% |
| 2025-05-02 | 0379-01-050 | Hutchinson | Pedestrian, Sidewalks & Curb Ramps | 1 of 6 | $3,406,939 | — | -6.8% |
| 2025-03-05 | 1094-04-010 | Johnson | Bridge Replacement | 1 of 3 | $3,569,154 | — | -0.6% |