Texas Traffic Control Systems, Inc.: TxDOT Bid Results and Margins

Name as published by TxDOT: TEXAS TRAFFIC CONTROL SYSTEMS, INC. · Data as published by TxDOT, lettings Nov 6, 2024 to Nov 3, 2026, retrieved Nov 24, 2026.

Proposals bid
8
Low bids (rank 1)
2
Win rate
25%
Low-bid value
$1.7M
Money left on table
$443K
Avg. bid vs. estimate
-3.87%

From Nov 6, 2024 to Nov 3, 2026, Texas Traffic Control Systems, Inc. submitted 8 bids on TxDOT proposals and was the apparent low bidder on 2 of them (25%), with low bids totalling $1,691,380. In 2 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $443,382 (26.21% of those bids); the median gap was 19.21%. On average its bids came in 3.87% below TxDOT's engineer's estimate. Its most frequent district was Tyler (4 bids).

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

By year

YearBidsLow bidsWin rateLow-bid value
20242150.0%$299,533
202511100.0%$1,391,848
2026500.0%$0

Head-to-head rivals

BidderProposals togetherRanked ahead
Striping Technology, L.P.86 of 8
North Texas Traffic Systems Construction40 of 4
Select Maintenance, L.L.C.44 of 4
3lw Civil LLC32 of 3
Florida Traffic Control Devices, Inc.32 of 3
Structural Integrity Group LLC33 of 3
Wg Engineering & Construction, LLC33 of 3
Creacom, Inc.22 of 2

Districts and work types

DistrictBids
Tyler4
Atlanta3
Paris1
Work type of low bidsLow bids
Routine Maintenance Project - Sealed1
Safety Improvement Projects1

Closest second-place finishes

Let dateProposalCountyLow bidderLow bidThis bidvs. low bid
2026-04-166497-30-001LamarNorth Texas Traffic Systems Construction$549,355$612,049+11.4%
2026-02-040062-03-048CassStriping Technology, L.P.$1,297,722$1,463,896+12.8%

Recent bids

Let dateProposalCountyWork typeRankBid totalvs. low bidvs. estimate
2026-11-030919-00-108CassSafety Improvement Projects4 of 10$940,218+7.2%-0.8%
2026-08-060910-00-165SmithSafety Improvement Projects6 of 10$796,563+21.6%-14.1%
2026-06-030910-00-157SmithSafety Improvement Projects3 of 11$630,419+11.5%-13.2%
2026-04-166497-30-001LamarRoutine Maintenance Project - Sealed2 of 3$612,049+11.4%-7.2%
2026-02-040062-03-048CassSafety Improvement Projects2 of 7$1,463,896+12.8%-0.1%
2025-01-086475-12-001BowieRoutine Maintenance Project - Sealed1 of 3$1,391,848—-4.9%
2024-11-070910-16-180SmithSafety Improvement Projects1 of 7$299,533—-8.2%
2024-11-060910-16-185SmithTraffic Control Devices3 of 6$1,825,763+8.3%+17.4%

Report an error. Wrong company merged, a name change, or a figure that does not match TxDOT's file? Email bidtabulation@apps.adeptaoperations.com. We respond within five business days. See how corrections work.

Compare your own unit prices with TxDOT history: benchmark a bid tab.