Silver Creek Construction, Inc.: TxDOT Bid Results and Margins

Name as published by TxDOT: SILVER CREEK CONSTRUCTION, INC. · Data as published by TxDOT, lettings Feb 6, 2025 to Nov 4, 2026, retrieved Nov 24, 2026.

Proposals bid
20
Low bids (rank 1)
1
Win rate
5%
Low-bid value
$7.7M
Money left on table
$1.1M
Avg. bid vs. estimate
-2.02%

From Feb 6, 2025 to Nov 4, 2026, Silver Creek Construction, Inc. submitted 20 bids on TxDOT proposals and was the apparent low bidder on 1 of them (5%), with low bids totalling $7,736,641. In 1 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $1,142,071 (14.76% of those bids); the median gap was 14.76%. On average its bids came in 2.02% below TxDOT's engineer's estimate. Its most frequent district was Dallas (8 bids).

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

By year

YearBidsLow bidsWin rateLow-bid value
20251500.0%$0
20265120.0%$7,736,641

Head-to-head rivals

BidderProposals togetherRanked ahead
O. Trevino Construction, LLC142 of 14
Grey Sky Construction LLC98 of 9
Garret Shields Infrastructure73 of 7
Built Right Construction of Oklahoma, LLC65 of 6
Roy Jorgensen Associates, Inc.51 of 5
Structural Integrity Group LLC42 of 4
Ti-Zack Concrete, LLC41 of 4
Winding Road Construction, Inc.43 of 4

Districts and work types

DistrictBids
Dallas8
Fort Worth4
Lubbock4
Waco2
Atlanta1
Work type of low bidsLow bids
Restoration1

Closest second-place finishes

Let dateProposalCountyLow bidderLow bidThis bidvs. low bid
2025-09-050909-00-105McLennanO. Trevino Construction, LLC$2,806,854$2,839,861+1.2%
2025-10-090047-14-093CollinRoy Jorgensen Associates, Inc.$2,620,351$2,748,675+4.9%
2025-03-050905-06-128LubbockO. Trevino Construction, LLC$2,186,699$2,590,965+18.5%

Recent bids

Let dateProposalCountyWork typeRankBid totalvs. low bidvs. estimate
2026-11-040353-01-031WiseIntersection & Operational Imprv5 of 7$649,060+34.6%+4.6%
2026-09-032266-02-169TarrantRehabilitation of Existing Road4 of 6$5,120,757+11.8%-1.5%
2026-08-050013-08-154WiseSafety Improvement Projects5 of 5$1,539,472+24.4%+26%
2026-01-060014-16-288TarrantSafety Improvement Projects8 of 9$5,712,079+47.5%+8.4%
2026-01-060062-04-052CassRestoration1 of 5$7,736,641—-3.3%
2025-12-030905-12-046HaleRehabilitation of Existing Road3 of 3$2,689,358+20.6%+4.2%
2025-12-026489-09-001KaufmanRoutine Maintenance Project - Sealed8 of 8$2,446,985+43.2%+16.5%
2025-11-050495-01-082KaufmanOverlay6 of 8$10,062,413+21.5%-17.8%
2025-10-090047-14-093CollinRestoration2 of 6$2,748,675+4.9%-1.3%
2025-10-086486-40-001DallasBridge Preventative Maintenance12 of 15$1,827,814+83.8%-17.8%
2025-09-050909-00-105McLennanRestoration2 of 9$2,839,861+1.2%-23.5%
2025-09-040461-06-028ParmerBridge Maintenance4 of 10$4,696,702+11.9%+8.4%

Report an error. Wrong company merged, a name change, or a figure that does not match TxDOT's file? Email bidtabulation@apps.adeptaoperations.com. We respond within five business days. See how corrections work.