Silver Creek Construction, Inc.: TxDOT Bid Results and Margins
Name as published by TxDOT: SILVER CREEK CONSTRUCTION, INC. · Data as published by TxDOT, lettings Feb 6, 2025 to Nov 4, 2026, retrieved Nov 24, 2026.
Proposals bid
20
Low bids (rank 1)
1
Win rate
5%
Low-bid value
$7.7M
Money left on table
$1.1M
Avg. bid vs. estimate
-2.02%
From Feb 6, 2025 to Nov 4, 2026, Silver Creek Construction, Inc. submitted 20 bids on TxDOT proposals and was the apparent low bidder on 1 of them (5%), with low bids totalling $7,736,641. In 1 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $1,142,071 (14.76% of those bids); the median gap was 14.76%. On average its bids came in 2.02% below TxDOT's engineer's estimate. Its most frequent district was Dallas (8 bids).
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.