Name as published by TxDOT: SAMMY GIST ENTERPRISES, INC. · Data as published by TxDOT, lettings Jan 8, 2025 to Jul 2, 2026, retrieved Nov 24, 2026.

Proposals bid
6
Low bids (rank 1)
1
Win rate
16.67%
Low-bid value
$4.6M
Money left on table
$303K
Avg. bid vs. estimate
+2.92%

From Jan 8, 2025 to Jul 2, 2026, Sammy Gist Enterprises, Inc. submitted 6 bids on TxDOT proposals and was the apparent low bidder on 1 of them (16.67%), with low bids totalling $4,580,818. In 1 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $303,087 (6.62% of those bids); the median gap was 6.62%. On average its bids came in 2.92% above TxDOT's engineer's estimate. Its most frequent district was Paris (6 bids).

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

By year

YearBidsLow bidsWin rateLow-bid value
2025200.0%$0
20264125.0%$4,580,818

Head-to-head rivals

BidderProposals togetherRanked ahead
A. K. Gillis & Sons, LLC42 of 4
D. L. Lennon Incorporated - Contractor42 of 4
Cdm Holdings31 of 3
Garret Shields Infrastructure21 of 2
Thk Construction LLC21 of 2
3lw Civil LLC11 of 1
Aad Contracting Inc.10 of 1
Built Right Construction of Oklahoma, LLC11 of 1

Districts and work types

DistrictBids
Paris6
Work type of low bidsLow bids
Safety Improvement Projects1

Closest second-place finishes

Let dateProposalCountyLow bidderLow bidThis bidvs. low bid
2026-01-060680-04-016HopkinsGarret Shields Infrastructure$2,863,925$3,086,235+7.8%

Recent bids

Let dateProposalCountyWork typeRankBid totalvs. low bidvs. estimate
2026-07-026501-47-001GraysonRoutine Maintenance Project - Sealed3 of 4$5,112,015+41.3%+23.2%
2026-06-032993-01-011LamarSafety Improvement Projects1 of 5$4,580,818—-0.8%
2026-04-070735-01-020DeltaRehabilitation of Existing Road3 of 3$5,396,197+13.7%-4.1%
2026-01-060680-04-016HopkinsSafety Improvement Projects2 of 8$3,086,235+7.8%-13.6%
2025-02-070045-12-096Red RiverPedestrian, Sidewalks & Curb Ramps5 of 11$1,632,783+9.8%-6.4%
2025-01-080901-27-054Red RiverBicycle Infrastructure Improvements5 of 6$2,890,307+39.3%+19.2%

Report an error. Wrong company merged, a name change, or a figure that does not match TxDOT's file? Email bidtabulation@apps.adeptaoperations.com. We respond within five business days. See how corrections work.