Roy Lee Walker: TxDOT Bid Results and Margins
Name as published by TxDOT: ROY LEE WALKER · Data as published by TxDOT, lettings Feb 12, 2025 to Nov 12, 2025, retrieved Nov 24, 2026.
- Proposals bid
- 6
- Low bids (rank 1)
- 4
- Win rate
- 66.67%
- Low-bid value
- $1.1M
- Money left on table
- $172K
- Avg. bid vs. estimate
- -12.06%
From Feb 12, 2025 to Nov 12, 2025, Roy Lee Walker submitted 6 bids on TxDOT proposals and was the apparent low bidder on 4 of them (66.67%), with low bids totalling $1,131,687. In 4 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $172,156 (15.21% of those bids); the median gap was 5.05%. On average its bids came in 12.06% below TxDOT's engineer's estimate. Its most frequent district was Lufkin (4 bids).
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.
By year
| Year | Bids | Low bids | Win rate | Low-bid value |
|---|---|---|---|---|
| 2025 | 6 | 4 | 66.7% | $1,131,687 |
Head-to-head rivals
| Bidder | Proposals together | Ranked ahead |
|---|---|---|
| Abescape Group LLC | 4 | 4 of 4 |
| Cross Plus Construction, LLC | 3 | 3 of 3 |
| Austin Barricade Company, L.L.C. | 2 | 1 of 2 |
| Cehand Services LLC | 2 | 2 of 2 |
| K & R Contractors | 2 | 0 of 2 |
| Arbortrue LLC | 1 | 1 of 1 |
| Elite Kings Construction, LLC | 1 | 1 of 1 |
| Greg Scruggs | 1 | 1 of 1 |
Districts and work types
| District | Bids |
|---|---|
| Lufkin | 4 |
| Bryan | 2 |
| Work type of low bids | Low bids |
|---|---|
| Routine Maintenance Project | 4 |
Recent bids
| Let date | Proposal | County | Work type | Rank | Bid total | vs. low bid | vs. estimate |
|---|---|---|---|---|---|---|---|
| 2025-11-12 | 6492-34-001 | Walker | Routine Maintenance Project | 1 of 4 | $252,861 | — | -8.9% |
| 2025-04-30 | 6483-43-001 | San Jacinto | Routine Maintenance Project | 1 of 2 | $224,776 | — | -22.1% |
| 2025-04-16 | 6478-81-001 | San Jacinto | Routine Maintenance Project - Sealed | 4 of 6 | $148,215 | +42.5% | +20.5% |
| 2025-03-26 | 6480-66-001 | Polk | Routine Maintenance Project | 1 of 4 | $460,099 | — | -20.3% |
| 2025-02-19 | 6475-49-001 | Polk | Routine Maintenance Project - Sealed | 3 of 8 | $152,590 | +16.4% | -19.5% |
| 2025-02-12 | 6479-14-001 | Madison | Routine Maintenance Project | 1 of 4 | $193,951 | — | -22% |
Report an error. Wrong company merged, a name change, or a figure that does not match TxDOT's file? Email bidtabulation@apps.adeptaoperations.com. We respond within five business days. See how corrections work.