Name as published by TxDOT: K & R CONTRACTORS · Data as published by TxDOT, lettings Feb 11, 2025 to Sep 23, 2026, retrieved Nov 24, 2026.
Proposals bid
20
Low bids (rank 1)
6
Win rate
30%
Low-bid value
$1.3M
Money left on table
$50K
Avg. bid vs. estimate
-8.88%
From Feb 11, 2025 to Sep 23, 2026, K & R Contractors submitted 20 bids on TxDOT proposals and was the apparent low bidder on 6 of them (30%), with low bids totalling $1,323,665. In 6 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $49,917 (3.77% of those bids); the median gap was 1.9%. On average its bids came in 8.88% below TxDOT's engineer's estimate. Its most frequent district was Lufkin (15 bids).
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.