Name as published by TxDOT: ABESCAPE GROUP LLC · Data as published by TxDOT, lettings Nov 7, 2024 to Mar 19, 2026, retrieved Nov 24, 2026.
Proposals bid
168
Low bids (rank 1)
30
Win rate
17.86%
Low-bid value
$9.3M
Money left on table
$903K
Avg. bid vs. estimate
+2.42%
From Nov 7, 2024 to Mar 19, 2026, Abescape Group LLC submitted 168 bids on TxDOT proposals and was the apparent low bidder on 30 of them (17.86%), with low bids totalling $9,335,062. In 29 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $902,522 (9.86% of those bids); the median gap was 7.99%. On average its bids came in 2.42% above TxDOT's engineer's estimate. Its most frequent district was Dallas (19 bids).
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.