Renegade Site Solutions, LLC: TxDOT Bid Results and Margins
Name as published by TxDOT: RENEGADE SITE SOLUTIONS, LLC · Data as published by TxDOT, lettings Nov 13, 2024 to Feb 6, 2026, retrieved Nov 24, 2026.
Proposals bid
13
Low bids (rank 1)
3
Win rate
23.08%
Low-bid value
$780K
Money left on table
$39K
Avg. bid vs. estimate
-2.85%
From Nov 13, 2024 to Feb 6, 2026, Renegade Site Solutions, LLC submitted 13 bids on TxDOT proposals and was the apparent low bidder on 3 of them (23.08%), with low bids totalling $779,686. In 3 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $39,040 (5.01% of those bids); the median gap was 5.56%. On average its bids came in 2.85% below TxDOT's engineer's estimate. Its most frequent district was Atlanta (6 bids).
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.