Pmco Construction LLC: TxDOT Bid Results and Margins
Name as published by TxDOT: PMCO CONSTRUCTION LLC · Data as published by TxDOT, lettings Mar 4, 2025 to Sep 3, 2026, retrieved Nov 24, 2026.
- Proposals bid
- 18
- Low bids (rank 1)
- 2
- Win rate
- 11.11%
- Low-bid value
- $6.4M
- Money left on table
- $309K
- Avg. bid vs. estimate
- +4.54%
From Mar 4, 2025 to Sep 3, 2026, Pmco Construction LLC submitted 18 bids on TxDOT proposals and was the apparent low bidder on 2 of them (11.11%), with low bids totalling $6,423,939. In 2 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $309,172 (4.81% of those bids); the median gap was 3.42%. On average its bids came in 4.54% above TxDOT's engineer's estimate. Its most frequent district was Dallas (6 bids).
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.
By year
| Year | Bids | Low bids | Win rate | Low-bid value |
|---|---|---|---|---|
| 2025 | 9 | 2 | 22.2% | $6,423,939 |
| 2026 | 9 | 0 | 0.0% | $0 |
Head-to-head rivals
| Bidder | Proposals together | Ranked ahead |
|---|---|---|
| Hodges and Son Construction Company, Inc. | 13 | 6 of 13 |
| Knife River Corporation - South | 9 | 4 of 9 |
| Texas Steel Industrial Placing, LLC | 9 | 6 of 9 |
| Garret Shields Infrastructure | 7 | 3 of 7 |
| A. L. Helmcamp, Inc. | 6 | 5 of 6 |
| Ed Bell Construction Company | 6 | 6 of 6 |
| Stx Civil | 6 | 1 of 6 |
| Tucan Contracting, LLC | 6 | 2 of 6 |
Districts and work types
| District | Bids |
|---|---|
| Dallas | 6 |
| Fort Worth | 4 |
| Bryan | 3 |
| Waco | 3 |
| Paris | 1 |
| Work type of low bids | Low bids |
|---|---|
| Bridge Replacement | 2 |
Recent bids
| Let date | Proposal | County | Work type | Rank | Bid total | vs. low bid | vs. estimate |
|---|---|---|---|---|---|---|---|
| 2026-09-03 | 0901-19-198 | Grayson | Bridge Replacement | 4 of 8 | $2,509,509 | +17.8% | +0.2% |
| 2026-09-03 | 0917-31-036 | Madison | Bridge Replacement | 4 of 7 | $1,165,655 | +1.9% | +12% |
| 2026-09-02 | 0043-17-036 | Wichita | Pedestrian, Sidewalks & Curb Ramps | 5 of 7 | $1,198,364 | +16.2% | +0.8% |
| 2026-08-06 | 0092-06-112 | Navarro | Bridge Maintenance | 9 of 9 | $774,798 | +61.1% | +20.8% |
| 2026-08-05 | 0095-04-079 | Kaufman | Bridge Maintenance | 9 of 10 | $1,287,749 | +61% | -0.2% |
| 2026-08-05 | 0902-38-134 | Parker | Bridge Replacement | 5 of 10 | $1,794,044 | +17.1% | -0.7% |
| 2026-08-05 | 0917-16-040 | Leon | Bridge Replacement | 4 of 8 | $2,755,532 | +7.1% | +32.6% |
| 2026-07-01 | 0909-40-079 | Limestone | Bridge Replacement | 5 of 8 | $2,534,874 | +21.8% | +11% |
| 2026-02-05 | 0918-18-142 | Navarro | Bridge Replacement | 12 of 15 | $1,798,000 | +46.9% | +16.8% |
| 2025-10-08 | 0459-02-012 | Freestone | Bridge Replacement | 1 of 7 | $2,573,940 | — | +3.6% |
| 2025-09-04 | 0909-22-214 | McLennan | Pedestrian, Sidewalks & Curb Ramps | 5 of 6 | $1,275,506 | +28.2% | +19.5% |
| 2025-08-08 | 0902-38-135 | Parker | Bridge Replacement | 5 of 8 | $1,807,524 | +17.6% | +1.7% |