Pmco Construction LLC: TxDOT Bid Results and Margins

Name as published by TxDOT: PMCO CONSTRUCTION LLC · Data as published by TxDOT, lettings Mar 4, 2025 to Sep 3, 2026, retrieved Nov 24, 2026.

Proposals bid
18
Low bids (rank 1)
2
Win rate
11.11%
Low-bid value
$6.4M
Money left on table
$309K
Avg. bid vs. estimate
+4.54%

From Mar 4, 2025 to Sep 3, 2026, Pmco Construction LLC submitted 18 bids on TxDOT proposals and was the apparent low bidder on 2 of them (11.11%), with low bids totalling $6,423,939. In 2 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $309,172 (4.81% of those bids); the median gap was 3.42%. On average its bids came in 4.54% above TxDOT's engineer's estimate. Its most frequent district was Dallas (6 bids).

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

By year

YearBidsLow bidsWin rateLow-bid value
20259222.2%$6,423,939
2026900.0%$0

Head-to-head rivals

BidderProposals togetherRanked ahead
Hodges and Son Construction Company, Inc.136 of 13
Knife River Corporation - South94 of 9
Texas Steel Industrial Placing, LLC96 of 9
Garret Shields Infrastructure73 of 7
A. L. Helmcamp, Inc.65 of 6
Ed Bell Construction Company66 of 6
Stx Civil61 of 6
Tucan Contracting, LLC62 of 6

Districts and work types

DistrictBids
Dallas6
Fort Worth4
Bryan3
Waco3
Paris1
Work type of low bidsLow bids
Bridge Replacement2

Recent bids

Let dateProposalCountyWork typeRankBid totalvs. low bidvs. estimate
2026-09-030901-19-198GraysonBridge Replacement4 of 8$2,509,509+17.8%+0.2%
2026-09-030917-31-036MadisonBridge Replacement4 of 7$1,165,655+1.9%+12%
2026-09-020043-17-036WichitaPedestrian, Sidewalks & Curb Ramps5 of 7$1,198,364+16.2%+0.8%
2026-08-060092-06-112NavarroBridge Maintenance9 of 9$774,798+61.1%+20.8%
2026-08-050095-04-079KaufmanBridge Maintenance9 of 10$1,287,749+61%-0.2%
2026-08-050902-38-134ParkerBridge Replacement5 of 10$1,794,044+17.1%-0.7%
2026-08-050917-16-040LeonBridge Replacement4 of 8$2,755,532+7.1%+32.6%
2026-07-010909-40-079LimestoneBridge Replacement5 of 8$2,534,874+21.8%+11%
2026-02-050918-18-142NavarroBridge Replacement12 of 15$1,798,000+46.9%+16.8%
2025-10-080459-02-012FreestoneBridge Replacement1 of 7$2,573,940—+3.6%
2025-09-040909-22-214McLennanPedestrian, Sidewalks & Curb Ramps5 of 6$1,275,506+28.2%+19.5%
2025-08-080902-38-135ParkerBridge Replacement5 of 8$1,807,524+17.6%+1.7%

Report an error. Wrong company merged, a name change, or a figure that does not match TxDOT's file? Email bidtabulation@apps.adeptaoperations.com. We respond within five business days. See how corrections work.

Compare your own unit prices with TxDOT history: benchmark a bid tab.