Pinto Construction Co., Inc.: TxDOT Bid Results and Margins
Name as published by TxDOT: PINTO CONSTRUCTION CO., INC. · Data as published by TxDOT, lettings Jan 7, 2025 to Jul 1, 2026, retrieved Nov 24, 2026.
Proposals bid
11
Low bids (rank 1)
4
Win rate
36.36%
Low-bid value
$34.6M
Money left on table
$2.7M
Avg. bid vs. estimate
-3.5%
From Jan 7, 2025 to Jul 1, 2026, Pinto Construction Co., Inc. submitted 11 bids on TxDOT proposals and was the apparent low bidder on 4 of them (36.36%), with low bids totalling $34,638,810. In 4 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $2,676,323 (7.73% of those bids); the median gap was 6.97%. On average its bids came in 3.5% below TxDOT's engineer's estimate. Its most frequent district was Lufkin (6 bids).
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.