Kiewit Infrastructure South Co.: TxDOT Bid Results and Margins
Name as published by TxDOT: KIEWIT INFRASTRUCTURE SOUTH CO. · Data as published by TxDOT, lettings Nov 6, 2024 to Feb 5, 2026, retrieved Nov 24, 2026.
- Proposals bid
- 21
- Low bids (rank 1)
- 2
- Win rate
- 9.52%
- Low-bid value
- $25.2M
- Money left on table
- $1.2M
- Avg. bid vs. estimate
- +4.26%
From Nov 6, 2024 to Feb 5, 2026, Kiewit Infrastructure South Co. submitted 21 bids on TxDOT proposals and was the apparent low bidder on 2 of them (9.52%), with low bids totalling $25,162,337. In 2 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $1,231,407 (4.89% of those bids); the median gap was 4.85%. On average its bids came in 4.26% above TxDOT's engineer's estimate. Its most frequent district was Odessa (7 bids).
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.
By year
| Year | Bids | Low bids | Win rate | Low-bid value |
|---|---|---|---|---|
| 2024 | 4 | 0 | 0.0% | $0 |
| 2025 | 16 | 2 | 12.5% | $25,162,337 |
| 2026 | 1 | 0 | 0.0% | $0 |
Head-to-head rivals
| Bidder | Proposals together | Ranked ahead |
|---|---|---|
| A. L. Helmcamp, Inc. | 14 | 2 of 14 |
| Rk Hall, LLC | 12 | 1 of 12 |
| Duininck, Inc. | 10 | 0 of 10 |
| Ck Newberry, LLC | 8 | 2 of 8 |
| Fnf Construction, Inc. | 8 | 1 of 8 |
| James Hamilton Construction Co. | 7 | 2 of 7 |
| Jones Bros. Dirt & Paving Contractors, Inc. | 7 | 0 of 7 |
| J. Lee Milligan, Inc. | 6 | 0 of 6 |
Districts and work types
| District | Bids |
|---|---|
| Odessa | 7 |
| Lubbock | 5 |
| Amarillo | 4 |
| Childress | 2 |
| El Paso | 1 |
| Work type of low bids | Low bids |
|---|---|
| Material Maintenance Project | 1 |
| Overlay | 1 |
Recent bids
| Let date | Proposal | County | Work type | Rank | Bid total | vs. low bid | vs. estimate |
|---|---|---|---|---|---|---|---|
| 2026-02-05 | 0140-03-052 | Pecos | Rehabilitation of Existing Road | 7 of 7 | $22,010,190 | +49.6% | +16.6% |
| 2025-11-06 | 0042-12-096 | Childress | Overlay | 8 of 8 | $7,548,471 | +45.6% | +8% |
| 2025-10-09 | 0380-04-025 | Terry | Super-2 Highway | 5 of 5 | $28,823,132 | +29.2% | +3.6% |
| 2025-09-05 | 0355-05-046 | Hansford | Overlay | 4 of 5 | $15,475,567 | +24% | -4.7% |
| 2025-09-04 | 0425-01-021 | Hartley | Widen Non-Freeway | 6 of 6 | $182,077,390 | +82.7% | +7.9% |
| 2025-07-02 | 0292-04-063 | Ward | Rehabilitation of Existing Road | 5 of 7 | $22,147,361 | +28.2% | +16.4% |
| 2025-07-02 | 6484-76-001 | Parker | Material Maintenance Project | 1 of 6 | $598,000 | — | -17.3% |
| 2025-06-05 | 0005-04-083 | Martin | Rehabilitation of Existing Road | 4 of 5 | $15,431,504 | +36.3% | -5.1% |
| 2025-06-04 | 1158-05-002 | Culberson | Super-2 Highway | 4 of 4 | $149,255,443 | +20.7% | +40.8% |
| 2025-05-01 | 0052-01-043 | Parmer | Overlay | 7 of 8 | $37,257,716 | +25.6% | +28.9% |
| 2025-04-03 | 0139-08-040 | Pecos | Super-2 Highway | 6 of 6 | $38,593,350 | +43.7% | -3.4% |
| 2025-03-05 | 0139-03-053 | Reeves | Overlay | 6 of 6 | $14,351,803 | +38.4% | +7.1% |
Report an error. Wrong company merged, a name change, or a figure that does not match TxDOT's file? Email bidtabulation@apps.adeptaoperations.com. We respond within five business days. See how corrections work.
Compare your own unit prices with TxDOT history: benchmark a bid tab.