Name as published by TxDOT: FUQUA CONSTRUCTION CO., INC. · Data as published by TxDOT, lettings Nov 6, 2024 to Nov 3, 2026, retrieved Nov 24, 2026.

Proposals bid
9
Low bids (rank 1)
1
Win rate
11.11%
Low-bid value
$1.1M
Money left on table
$3K
Avg. bid vs. estimate
+36.61%

From Nov 6, 2024 to Nov 3, 2026, Fuqua Construction Co., Inc. submitted 9 bids on TxDOT proposals and was the apparent low bidder on 1 of them (11.11%), with low bids totalling $1,143,373. In 1 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $3,262 (0.29% of those bids); the median gap was 0.29%. On average its bids came in 36.61% above TxDOT's engineer's estimate. Its most frequent district was Bryan (7 bids).

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

By year

YearBidsLow bidsWin rateLow-bid value
2024100.0%$0
2025600.0%$0
20262150.0%$1,143,373

Head-to-head rivals

BidderProposals togetherRanked ahead
Knife River Corporation - South73 of 7
C. E. Barker, Ltd.62 of 6
Stx Civil61 of 6
Hodges and Son Construction Company, Inc.51 of 5
R Construction Civil, LLC52 of 5
E-Z Bel Construction, LLC30 of 3
Garret Shields Infrastructure30 of 3
Larry Young Paving, Inc.30 of 3

Districts and work types

DistrictBids
Bryan7
Yoakum2
Work type of low bidsLow bids
Bridge Replacement1

Closest second-place finishes

Let dateProposalCountyLow bidderLow bidThis bidvs. low bid
2025-01-070913-20-099AustinStx Civil$1,737,587$1,841,526+6%

Recent bids

Let dateProposalCountyWork typeRankBid totalvs. low bidvs. estimate
2026-11-030917-30-068BurlesonBridge Replacement15 of 15$1,415,641+96.1%+98.8%
2026-09-030917-31-036MadisonBridge Replacement1 of 7$1,143,373—+9.9%
2025-12-020833-13-014BurlesonBridge Replacement9 of 9$4,259,517+84%+77.9%
2025-11-050315-06-047WashingtonBridge Replacement12 of 12$4,646,509+65.2%+36.7%
2025-06-040913-28-091FayetteBridge Replacement8 of 10$1,598,110+36.6%+19.3%
2025-03-040212-04-049GrimesCulvert & Storm Drainage Work8 of 9$1,499,778+57%+8.6%
2025-02-126479-28-001WashingtonMaterial Maintenance Project4 of 4$465,975+61.6%+56.9%
2025-01-070913-20-099AustinBridge Replacement2 of 9$1,841,526+6%+3.1%
2024-11-060315-04-087GrimesPedestrian, Sidewalks & Curb Ramps6 of 8$1,179,000+50.6%+18.4%