Fuqua Construction Co., Inc.: TxDOT Bid Results and Margins
Name as published by TxDOT: FUQUA CONSTRUCTION CO., INC. · Data as published by TxDOT, lettings Nov 6, 2024 to Nov 3, 2026, retrieved Nov 24, 2026.
Proposals bid
9
Low bids (rank 1)
1
Win rate
11.11%
Low-bid value
$1.1M
Money left on table
$3K
Avg. bid vs. estimate
+36.61%
From Nov 6, 2024 to Nov 3, 2026, Fuqua Construction Co., Inc. submitted 9 bids on TxDOT proposals and was the apparent low bidder on 1 of them (11.11%), with low bids totalling $1,143,373. In 1 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $3,262 (0.29% of those bids); the median gap was 0.29%. On average its bids came in 36.61% above TxDOT's engineer's estimate. Its most frequent district was Bryan (7 bids).
Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.