Fnh Construction, LLC: TxDOT Bid Results and Margins

Name as published by TxDOT: FNH CONSTRUCTION, LLC · Data as published by TxDOT, lettings Nov 6, 2024 to Jan 8, 2025, retrieved Nov 24, 2026.

Proposals bid
47
Low bids (rank 1)
0
Win rate
0%
Low-bid value
$0.000
Money left on table
—
Avg. bid vs. estimate
+34.53%

From Nov 6, 2024 to Jan 8, 2025, Fnh Construction, LLC submitted 47 bids on TxDOT proposals and was the apparent low bidder on 0 of them (0%), with low bids totalling $0. On average its bids came in 34.53% above TxDOT's engineer's estimate. Its most frequent district was Paris (10 bids).

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

By year

YearBidsLow bidsWin rateLow-bid value
20243100.0%$0
20251600.0%$0

Head-to-head rivals

BidderProposals togetherRanked ahead
Garret Shields Infrastructure140 of 14
Built Right Construction of Oklahoma, LLC91 of 9
Texas Materials Group, Inc.81 of 8
Icos Management, LLC70 of 7
Ed Bell Construction Company61 of 6
Scr Civil Construction, LLC60 of 6
Thk Construction LLC60 of 6
Ck Newberry, LLC52 of 5

Districts and work types

DistrictBids
Paris10
Dallas8
Fort Worth8
Tyler5
Atlanta3

Closest second-place finishes

Let dateProposalCountyLow bidderLow bidThis bidvs. low bid
2025-01-070902-90-241TarrantSelect Maintenance, L.L.C.$1,371,356$1,372,877+0.1%

Recent bids

Let dateProposalCountyWork typeRankBid totalvs. low bidvs. estimate
2025-01-080260-04-005EllisRehabilitation of Existing Road5 of 5$4,658,660+23.1%+6.7%
2025-01-080642-02-018HuntRehabilitation of Existing Road3 of 3$9,103,771+35.3%+17.2%
2025-01-080901-27-054Red RiverBicycle Infrastructure Improvements4 of 6$2,697,013+30%+11.2%
2025-01-080906-00-246EctorBridge Maintenance8 of 8$6,149,170+148.2%+100.3%
2025-01-082054-01-018DentonSafety Improvement Projects4 of 5$13,120,186+31.4%+25.3%
2025-01-086467-45-001DallasRoutine Maintenance Project - Sealed4 of 4$1,745,188+71%+24.1%
2025-01-070010-02-107HopkinsBridge Maintenance11 of 12$1,308,600+286%+22.5%
2025-01-070047-01-075GraysonOverlay4 of 4$19,883,911+35.6%+24.7%
2025-01-070054-09-044MillsSafety Improvement Projects8 of 10$754,500+132.1%+22.9%
2025-01-070245-04-023Van ZandtOverlay8 of 8$11,345,901+45.7%+18.5%
2025-01-070418-01-035HillRehabilitation of Existing Road5 of 5$15,747,495+79.7%+68.5%
2025-01-070735-05-023HopkinsSafety Improvement Projects4 of 4$4,189,960+36.2%+12.4%

Report an error. Wrong company merged, a name change, or a figure that does not match TxDOT's file? Email bidtabulation@apps.adeptaoperations.com. We respond within five business days. See how corrections work.