Flex Supply, LLC: TxDOT Bid Results and Margins

Name as published by TxDOT: FLEX SUPPLY, LLC · Data as published by TxDOT, lettings Sep 5, 2025 to Nov 4, 2026, retrieved Nov 24, 2026.

Proposals bid
6
Low bids (rank 1)
2
Win rate
33.33%
Low-bid value
$2.1M
Money left on table
$303K
Avg. bid vs. estimate
+0.67%

From Sep 5, 2025 to Nov 4, 2026, Flex Supply, LLC submitted 6 bids on TxDOT proposals and was the apparent low bidder on 2 of them (33.33%), with low bids totalling $2,114,750. In 2 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $303,250 (14.34% of those bids); the median gap was 11.25%. On average its bids came in 0.67% above TxDOT's engineer's estimate. Its most frequent district was Tyler (4 bids).

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

By year

YearBidsLow bidsWin rateLow-bid value
2025200.0%$0
20264250.0%$2,114,750

Head-to-head rivals

BidderProposals togetherRanked ahead
Awp Safety64 of 6
Fc Traffic Control, LLC44 of 4
Catocon, Inc.22 of 2
Highway 19 Construction LLC20 of 2
Barricades Unlimited11 of 1
Rhino Equity, LLC11 of 1

Districts and work types

DistrictBids
Tyler4
Paris2
Work type of low bidsLow bids
Routine Maintenance Project - Sealed2

Closest second-place finishes

Let dateProposalCountyLow bidderLow bidThis bidvs. low bid
2025-09-056488-14-001HuntAwp Safety$1,599,750$1,614,750+0.9%
2026-11-036508-86-001GreggHighway 19 Construction LLC$1,372,080$1,415,950+3.2%
2026-11-046509-96-001HendersonHighway 19 Construction LLC$1,217,140$1,302,000+7%
2025-12-036490-45-001HopkinsAwp Safety$875,862$942,957+7.7%

Recent bids

Let dateProposalCountyWork typeRankBid totalvs. low bidvs. estimate
2026-11-046509-96-001HendersonRoutine Maintenance Project - Sealed2 of 4$1,302,000+7%+9.1%
2026-11-036508-86-001GreggRoutine Maintenance Project - Sealed2 of 4$1,415,950+3.2%+0.7%
2026-10-136508-38-001SmithRoutine Maintenance Project - Sealed1 of 3$1,076,000—+14.4%
2026-10-136508-42-001CherokeeRoutine Maintenance Project - Sealed1 of 3$1,038,750—+19.9%
2025-12-036490-45-001HopkinsRoutine Maintenance Project - Sealed2 of 4$942,957+7.7%-16.8%
2025-09-056488-14-001HuntRoutine Maintenance Project - Sealed2 of 4$1,614,750+0.9%-23.3%

Report an error. Wrong company merged, a name change, or a figure that does not match TxDOT's file? Email bidtabulation@apps.adeptaoperations.com. We respond within five business days. See how corrections work.

Compare your own unit prices with TxDOT history: benchmark a bid tab.