Emery Sapp & Son's Inc.: TxDOT Bid Results and Margins

Name as published by TxDOT: EMERY SAPP & SON'S INC. · Data as published by TxDOT, lettings Sep 5, 2025 to Sep 3, 2026, retrieved Nov 24, 2026.

Proposals bid
6
Low bids (rank 1)
1
Win rate
16.67%
Low-bid value
$300K
Money left on table
$8K
Avg. bid vs. estimate
+20.18%

From Sep 5, 2025 to Sep 3, 2026, Emery Sapp & Son's Inc. submitted 6 bids on TxDOT proposals and was the apparent low bidder on 1 of them (16.67%), with low bids totalling $299,552. In 1 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $8,004 (2.67% of those bids); the median gap was 2.67%. On average its bids came in 20.18% above TxDOT's engineer's estimate. Its most frequent district was Fort Worth (3 bids).

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

By year

YearBidsLow bidsWin rateLow-bid value
2025100.0%$0
20265120.0%$299,552

Head-to-head rivals

BidderProposals togetherRanked ahead
Select Maintenance, L.L.C.52 of 5
O. Trevino Construction, LLC40 of 4
Diamond Surface, Inc.32 of 3
Ed Bell Construction Company21 of 2
Foutsco Paving Company, LLC20 of 2
Silver Creek Construction, Inc.20 of 2
Structural Integrity Group LLC21 of 2
Built Right Construction of Oklahoma, LLC11 of 1

Districts and work types

DistrictBids
Fort Worth3
Houston2
Waco1
Work type of low bidsLow bids
Restoration1

Closest second-place finishes

Let dateProposalCountyLow bidderLow bidThis bidvs. low bid
2026-03-050365-01-055ParkerO. Trevino Construction, LLC$1,234,417$1,392,432+12.8%

Recent bids

Let dateProposalCountyWork typeRankBid totalvs. low bidvs. estimate
2026-09-032266-02-169TarrantRehabilitation of Existing Road6 of 6$7,727,534+68.7%+48.7%
2026-09-020110-06-151HarrisRehabilitation of Existing Road6 of 6$2,690,397+124.9%+109.5%
2026-09-020172-09-047TarrantRehabilitation of Existing Road5 of 7$4,227,482+61.2%+20.3%
2026-03-050271-04-096WallerRestoration1 of 4$299,552—+1%
2026-03-050365-01-055ParkerRehabilitation of Existing Road2 of 4$1,392,432+12.8%-40.1%
2025-09-050909-00-105McLennanRestoration4 of 9$3,034,338+8.1%-18.3%