Copasa Inc: TxDOT Bid Results and Margins

Name as published by TxDOT: COPASA INC · Data as published by TxDOT, lettings Jul 2, 2025 to Jul 1, 2026, retrieved Nov 24, 2026.

Proposals bid
15
Low bids (rank 1)
1
Win rate
6.67%
Low-bid value
$21.3M
Money left on table
$2.5M
Avg. bid vs. estimate
+25.68%

From Jul 2, 2025 to Jul 1, 2026, Copasa Inc submitted 15 bids on TxDOT proposals and was the apparent low bidder on 1 of them (6.67%), with low bids totalling $21,288,202. In 1 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $2,458,215 (11.55% of those bids); the median gap was 11.55%. On average its bids came in 25.68% above TxDOT's engineer's estimate. Its most frequent district was Austin (3 bids).

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

By year

YearBidsLow bidsWin rateLow-bid value
2025500.0%$0
202610110.0%$21,288,202

Head-to-head rivals

BidderProposals togetherRanked ahead
Ragle Construction, Inc.81 of 8
Harper Brothers Construction LLC61 of 6
Altus Construction LLC51 of 5
Hunter Industries, Ltd.52 of 5
James Construction Group, LLC50 of 5
Webber, LLC50 of 5
Ed Bell Construction Company40 of 4
Highway 19 Construction LLC40 of 4

Districts and work types

DistrictBids
Austin3
Dallas3
Corpus Christi2
San Antonio2
Tyler2
Work type of low bidsLow bids
Bridge Replacement1

Recent bids

Let dateProposalCountyWork typeRankBid totalvs. low bidvs. estimate
2026-07-010016-05-128ComalSafety Improvement Projects7 of 7$15,689,186+30.4%+8.1%
2026-07-013510-04-066Fort BendNew Location Non-Freeway11 of 11$29,615,658+51.8%+47.2%
2026-06-030366-02-089GuadalupeWiden Non-Freeway6 of 6$52,249,858+28.2%+9.4%
2026-06-020019-01-146JohnsonWiden Non-Freeway8 of 8$24,437,942+23.3%+21.8%
2026-05-060916-35-231NuecesBridge Replacement6 of 7$20,053,645+34.9%+42.8%
2026-04-080179-09-041JacksonBridge Replacement1 of 10$21,288,202—-46.1%
2026-04-080916-35-251NuecesBridge Replacement4 of 5$27,146,162+27.6%+72%
2026-03-040581-02-156DallasBridge Replacement9 of 9$24,831,323+49.5%+53.6%
2026-02-041015-01-024RockwallWiden Non-Freeway12 of 12$44,776,051+50.2%+29.3%
2026-02-042921-01-010EllisNew Location Non-Freeway11 of 11$34,327,526+81.3%+35.2%
2025-11-060113-13-168TravisInterchange (New or Reconstructed)6 of 8$72,992,878+6.7%+5.2%
2025-09-050495-07-081GreggBridge Replacement10 of 10$48,556,554+31.3%+20.6%

Report an error. Wrong company merged, a name change, or a figure that does not match TxDOT's file? Email bidtabulation@apps.adeptaoperations.com. We respond within five business days. See how corrections work.

Compare your own unit prices with TxDOT history: benchmark a bid tab.