Constar Construction: TxDOT Bid Results and Margins

Name as published by TxDOT: CONSTAR CONSTRUCTION · Data as published by TxDOT, lettings Feb 6, 2025 to Dec 3, 2025, retrieved Nov 24, 2026.

Proposals bid
7
Low bids (rank 1)
1
Win rate
14.29%
Low-bid value
$569K
Money left on table
$20K
Avg. bid vs. estimate
+1.67%

From Feb 6, 2025 to Dec 3, 2025, Constar Construction submitted 7 bids on TxDOT proposals and was the apparent low bidder on 1 of them (14.29%), with low bids totalling $568,771. In 1 low bids that faced at least one other bidder, the gap between this bidder and the next-lowest bid totalled $20,277 (3.57% of those bids); the median gap was 3.57%. On average its bids came in 1.67% above TxDOT's engineer's estimate. Its most frequent district was Yoakum (6 bids).

Money left on the table is the difference between the winning low bid and the second-lowest bid on the same proposal, a standard bid-analysis metric. It describes the published result, not a judgment of any bidder. See the methodology; to report an error, email bidtabulation@apps.adeptaoperations.com.

By year

YearBidsLow bidsWin rateLow-bid value
20257114.3%$568,771

Head-to-head rivals

BidderProposals togetherRanked ahead
Stx Civil52 of 5
E-Z Bel Construction, LLC43 of 4
Acme Bridge Company, Inc.31 of 3
C. E. Barker, Ltd.22 of 2
Ck Newberry, LLC22 of 2
Cross Plus Construction, LLC22 of 2
Presidio Contracting, LLC21 of 2
Shalom Services Corporation21 of 2

Districts and work types

DistrictBids
Yoakum6
Corpus Christi1
Work type of low bidsLow bids
Bridge Preventative Maintenance - Sealed1

Closest second-place finishes

Let dateProposalCountyLow bidderLow bidThis bidvs. low bid
2025-03-050913-18-038JacksonLakey, Inc.$1,929,627$1,955,626+1.4%
2025-07-020913-29-062Lavaca3lw Civil LLC$1,541,729$1,578,110+2.4%

Recent bids

Let dateProposalCountyWork typeRankBid totalvs. low bidvs. estimate
2025-12-030943-02-012De WittBridge Replacement7 of 8$1,296,437+46.7%+29.2%
2025-07-020913-29-062LavacaBridge Replacement2 of 7$1,578,110+2.4%-1.4%
2025-05-206427-68-001RefugioBridge Preventative Maintenance - Sealed1 of 7$568,771—-23.2%
2025-04-286458-41-001WhartonBridge Preventative Maintenance - Sealed6 of 9$913,918+51.6%+8.2%
2025-04-030913-28-095FayetteBridge Replacement8 of 10$2,614,568+28.4%+8%
2025-03-050913-18-038JacksonBridge Replacement2 of 6$1,955,626+1.3%-5.9%
2025-02-060089-03-096JacksonSafety Improvement Projects3 of 3$2,650,022+3.9%-3.1%

Report an error. Wrong company merged, a name change, or a figure that does not match TxDOT's file? Email bidtabulation@apps.adeptaoperations.com. We respond within five business days. See how corrections work.